Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 | BHOPAL | MADHYA PRADESH | 462001 | ₹6.4 L Quoted ₹5.5 L | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹8.0 LRejected-AOC | ₹8.0 L | L2 | Rejected-AOC L2 Tenderer |
| 3 | L3₹8.8 LRejected-AOC SALEM | SALEM | ₹8.8 L | L3 | Rejected-AOC L3 Tenderer |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| Sl No | Description | Qty | Unit | Delta Roto Tech Private LimitedV L3 | R K ELECTRICALS L1 | EDEN TRANSFORMERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Draining of Oil from the main tank | 26,460 | LTR | 1.1 ₹29,106 | 1.1 ₹29,106 | 0.75 ₹19,845 Lowest |
| 2.00 | Tank Rent | 1 | NOS | 53,000 ₹53,000 Lowest | 90,000 ₹90,000 | 1,20,000 ₹1,20,000 |
| 3.00 | Dismantling of header pipes, HV, LV bushing, Conservator tank, Buchholz relay, equalizing pipes and other allied accessories and draining of oil to her enquired level | 1 | NOS | 65,500 ₹65,500 | 30,000 ₹30,000 Lowest | 62,000 ₹62,000 |
| 4.00 | Labour charges for Main tank oil and OFFLTC transformer oil, Hot oil circulation and circulation of oil till satisfactory results are obtained before commissioning, vacuum drying wherever applicable necessary to the required level (Oil capacity 26,460 litre + 10% Extra for cleaning of core) total 29,106 Litre | 29,106 | LTR | 2.9 ₹84,407.4 | 2.2 ₹64,033.2 | 1.8 ₹52,390.8 Lowest |
| 5.00 | Filter Machine Rent | 1 | NOS | 10,000 ₹10,000 Lowest | 10,000 ₹10,000 Lowest | 25,000 ₹25,000 |
| 6.00 | Replacing of worn-out gasket for all locations (i.e top cover, HV, LV bushings and Turrets, Buchholz pipeline, Top and side inspection covers, radiators, conservator tank, equalizing pipes, surge pipe lines, vent pipe and various valves etc.) in Power Transformer complete including hiring charges of crane (gasket to be provided by the contractor) | 1 | NOS | 85,000 ₹85,000 | 90,000 ₹90,000 | 70,000 ₹70,000 Lowest |
| 7.00 | Cleaning of Entire transformer (transformer core, radiator pipes, OFFLTC main and conservator tank), supply of waste etc.., (to be provided by the contractor) | 1 | NOS | 56,300 ₹56,300 | 10,000 ₹10,000 Lowest | 10,000 ₹10,000 Lowest |
| 8.00 | Labour Charges for erection of Power Transformer by using Derricks for the following wherever applicable (for 20 MVA Power Transformer) | 1 | NOS | 95,000 ₹95,000 | 45,000 ₹45,000 Lowest | 75,000 ₹75,000 |
| 9.00 | Oil filling of power transformer | 26,460 | LTR | 1.1 ₹29,106 | 1.1 ₹29,106 | 0.9 ₹23,814 Lowest |
| 10.00 | Labour charges for cleaning, spray painting bushing, painting of power transformer and accessories including cost of waste, thinner, soap etc.., complete (Including materials) ( 10 to 25MVA Power Transformer) | 1 | NOS | 37,500 ₹37,500 | 20,000 ₹20,000 Lowest | 40,000 ₹40,000 |
Tender Value
Refer Docs
EMD Value
₹11,030
Closing Date
30 May 2026, 2:00 pmClosed
SE/CO/UKT/EGC
SE/CO/UKT/EGC
Major overhauling of Machin 3 20MVA, 11 -230KV, B Phase single phase Power Transformer at Tunnel Power House Mettur Dam in Erode Generation Circle.
2026_EB_677203_1
SE/GEN/01/26-27 dt 12.05.26
Open Tender
Maintenance Works
Works
Tunnel power house, Mettur dam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,030
Yes
22 Jul 2026
15 May 2026
1 Jun 2026
15 May 2026
30 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Draining of Oil from the main tank | - | LTR | - | - |
| 2 | Tank Rent | - | NOS | - | - |
| 3 | Dismantling of header pipes, HV, LV bushing, Conservator tank, Buchholz relay, equalizing pipes and other allied accessories and draining of oil to her enquired level | - | NOS | - | - |
| 4 | Labour charges for Main tank oil and OFFLTC transformer oil, Hot oil circulation and circulation of oil till satisfactory results are obtained before commissioning, vacuum drying wherever applicable necessary to the required level (Oil capacity 26,460 litre + 10% Extra for cleaning of core) total 29,106 Litre | - | LTR | - | - |
| 5 | Filter Machine Rent | - | NOS | - | - |
| 6 | Replacing of worn-out gasket for all locations (i.e top cover, HV, LV bushings and Turrets, Buchholz pipeline, Top and side inspection covers, radiators, conservator tank, equalizing pipes, surge pipe lines, vent pipe and various valves etc.) in Power Transformer complete including hiring charges of crane (gasket to be provided by the contractor) | - | NOS | - | - |
| 7 | Cleaning of Entire transformer (transformer core, radiator pipes, OFFLTC main and conservator tank), supply of waste etc.., (to be provided by the contractor) | - | NOS | - | - |
| 8 | Labour Charges for erection of Power Transformer by using Derricks for the following wherever applicable (for 20 MVA Power Transformer) | - | NOS | - | - |
| 9 | Oil filling of power transformer | - | LTR | - | - |
| 10 | Labour charges for cleaning, spray painting bushing, painting of power transformer and accessories including cost of waste, thinner, soap etc.., complete (Including materials) ( 10 to 25MVA Power Transformer) | - | NOS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_813716.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].