Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹79,020Accepted-AOC | ₹79,020 | Ist | Accepted-AOC L-1 Bidder |
| 2 | IInd₹1.7 LRejected-Finance | ₹1.7 L | IInd | Rejected-Finance L-2 Bidder |
| 3 | IIIrd₹1.9 LRejected-Finance | ₹1.9 L | IIIrd | Rejected-Finance L-3 Bidder |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
17 Jun 2022, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
GRASS CUTTING AND JUNGLE CLEARANCE INCLUDING UPROOTING OF SMALL WILD VEGETATION
2022_UPTCL_703975_1
Short Term E-tender no. 26/2022-23/ETC/VNS
Open Tender
Electrical Works
Item Rate
180 days
220 KV Substation Sahupuri
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹236
SE, ETC, Varanasi
₹2,000
11 May 2023
28 May 2022
18 Jun 2022
28 May 2022
17 Jun 2022
2 Jun 2022
Amount
Clearance of dense jungle and cutting of grass & Kusha including uprooting of the rank vegetation grass , bushes shrubs etc. by scrapping of grass, brush wood & plants etc. above 2 - 3 cm over the ground level weeding out the wild growth roots seeds etc. & collection of the foreign materials like kankar, ballast, pebbles, waste papers, broken strain of conductors and broken discs etc. in 220 KV, 132 KV & 33 KV Switchyard area and area around fencing between substation boundary and outer fencing as per required or as per instruction of AE/JE at of the 220 KV Sub station Sahupuri including removal of grass and small plants on trenches, road path way, capacitor bank floors, cleaning of drainage system and small trenches inside the switchyard and excepting area between pale fencing and security fencing of the switchyard, four times in a year then removal of all the rubbish & garbage etc. by throwing it outside the periphery of the Sub station permises with all cost of men , misc. consumables and T & P etc. required for the job , as per detail below
First cutting
Second cutting with in 03 month from date of completion of 1 cutting
Uprooting of small Trees i.e. shisham , bair pramble and cleaning of jungali plants in 220 KV, 132 KV & 33 KV Switchyard area of the 220KV sub station Sahupuri including area of trenches, road path way, capacitor bank floors, drainage system and small trenches inside the switchyard and excepting area between pale fencing and security fencing of the switchyard, four times in a year by digging and taking out the complete root then removal of all the rubbish & garbage etc. by throwing it outside the periphery of the sub station permises and finally , leveling the ground with all cost of men misc. consumables and T & P etc. required for the job , as per details below .
First uprooting
second uprooting with in 03 month from date of completion of 1st uprooting
Disposal of garbage tree cutting wood, bushes grass, etc. from stacked piles in between pale/chain link fencing & security wall / boundary wall to out side the sub station by tractor trolly and labour after each cutting & uprooting of above throwing it outside the prophecy of sub station permises with all cost of men & misc. T & P required for the above provided by the contractor.
C S ENTERPRISES
IRA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .