Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAccepted-Finance | L1 | Accepted-Finance BEING L1 | |
| 2 | L2₹34.5 L+₹2.2 L (6.96%)Accepted-Finance | L2 | Accepted-Finance NOT BEING L1 | |
| 3 | L3₹35.4 L+₹3.1 L (9.78%)Accepted-Finance | L3 | Accepted-Finance NOT BEING L1 | |
| 4 | L4₹35.8 L+₹3.6 L (11.1%)Accepted-Finance SR NO 331 2B PLOT NO 43 R H NO 02 BALDEWA RAO BUNGLOW NEWA NMC WATER TANK PATHARDI SHIVAR NASHIK 422 009 INDEX NO E 84CWE AF LOHEGAON PUNE | NASHIK | MAHARASHTRA | 422009 | L4 | Accepted-Finance NOT BEING L1 | |
| 5 | L5₹38.6 L+₹6.4 L (20.0%)Accepted-Finance 154 HANUMAN MANDIR DIKSHI TAL NIPHAD DIST NASHIK 422 302 | NASHIK | MAHARASHTRA | 422302 | L5 | Accepted-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | MAHIMA CONSTRUCTION L5 | SHRI SULAI ELECTRICALS L6 | M/S Nilesh Enterprises L2 | Shree Sai Samarth Enterprises L4 | Kamalesh Singh Yadav L3 | SONA LAKSHMI ASSOCIATE L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, laying, testing and commissioning in in repairs exisiting LT XLPE insulated/PVC heavy duty armoured cablle 1100 volts grade UG stranded aluminium conductor electric cable cross sectional area 25 Sqmm 4/3.5 Core including necessary connection with provision of lugs & cable gland fixing arrangements including taking down old unsv cable from existing position complete all as specified & directed.
Note:- Taking down old UNSV one complete all as specified & directed. | 400 | RM | 288 ₹1,15,200 | 290 ₹1,16,000 | 370 ₹1,48,000 | 270 ₹1,08,000 | 90 ₹36,000 Lowest | 308 ₹1,23,200 |
| 2.00 | All as per item No 1 above 1 but LT XLPE cross sectional area 16 Sqmm 3.5 Core all as specified and directed. | 500 | RM | 243 ₹1,21,500 | 200 ₹1,00,000 | 275 ₹1,37,500 | 224 ₹1,12,000 | 90 ₹45,000 Lowest | 257 ₹1,28,500 |
| 3.00 | All as per item No 1 above 1 LT XLPE , cross sectional area 35 Sqmm 3.5 Core including all as specified and directed. | 500 | RM | 342 ₹1,71,000 | 335 ₹1,67,500 | 410 ₹2,05,000 | 365 ₹1,82,500 | 90 ₹45,000 Lowest | 355 ₹1,77,500 |
| 4.00 | All as per item No 1 above 1 LT XLPE cross sectional area 10 Sqmm 2.0 Core including all as specified and directed. | 300 | RM | 144 ₹43,200 | 125 ₹37,500 | 200 ₹60,000 | 129 ₹38,700 | 90 ₹27,000 Lowest | 150 ₹45,000 |
| 5.00 | All as per item No 1 above 1 LT XLPE cross sectional area 10 Sqmm 4.0 Core including all as specified and directed. | 300 | RM | 216 ₹64,800 | 170 ₹51,000 | 250 ₹75,000 | 210 ₹63,000 | 90 ₹27,000 Lowest | 200 ₹60,000 |
| 6.00 | All as per item No 1 above 1 LT XLPE cross sectional area 6 Sqmm 2.0 Core including all as specified and directed. | 300 | RM | 135 ₹40,500 | 100 ₹30,000 | 230 ₹69,000 | 113 ₹33,900 | 90 ₹27,000 Lowest | 100 ₹30,000 |
| 7.00 | Excavation in trenches n. exc 1.5 Mtr wide and n. exc 1.5 mtr in depth and getting out in soft soil.
Note:- Excavation carried out by contractor without damage existing services i.e water supply elect HT/LT cable, sewage line, F net cable, signal and other service related services. If it is any services damage by contractor during excavation of work it will repair/serviceable at site without any extra cost. | 303.75 | Cum | 180 ₹54,675 | 150 ₹45,562.5 | 350 ₹1,06,312.5 | 160 ₹48,600 | 90 ₹27,337.5 Lowest | 160 ₹48,600 |
| 8.00 | Excavation in trenches n. exc 1.5 Mtr wide and n. exc 1.5 mtr in depth and getting out in hard soil.
Note:- Excavation carried out by contractor without damage existing services i.e water supply elect HT/LT cable, sewage line, F net cable, signal and other service related services. If it is any services damage by contractor during excavation of work it will repair/serviceable at site without any extra cost. | 91.35 | Cum | 243 ₹22,198.05 | 250 ₹22,837.5 | 400 ₹36,540 | 200 ₹18,270 | 90 ₹8,221.5 Lowest | 200 ₹18,270 |
| 9.00 | Returning Filling in including spreading, leveling, watering & well ramming in layers n. exc 25 Cm. | 349.7 | Cum | 90 ₹31,473.22 | 50 ₹17,485.12 | 80 ₹27,976.2 | 50 ₹17,485.12 | 550 ₹1,92,336.38 | 40 ₹13,988.1 Lowest |
| 10.00 | Removing excavated/Surplus soil n exc 50 Mtr & depositing where directed at a level n. exc 1.5 Mtr above the starting point. | 45.4 | Cum | 90 ₹4,085.78 | 50 ₹2,269.88 | 80 ₹3,631.8 | 50 ₹2,269.88 | 200 ₹9,079.5 | 40 ₹1,815.9 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Aug 2026, 6:00 pmClosed
GE AF OJHAR
GE (AF) OJHAR AIR FORCE STN OJHAR DIST NASHIK 422221
REPAIR REPLACEMENT OF STREET LIGHT AND MAINTENANCE OF CONTROL PANELS ALONGWITH OTHER MISC ITEMS AT 25 ED AF STN DEOLALI UNDER GE (AF) OJHAR
2026_MES_777586_2
8431/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE AF OJHAR
As per tender documents
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹80,000
Yes
20 Aug 2026
25 Jul 2026
15 Aug 2026
25 Jul 2026
13 Aug 2026
1 Aug 2026
25 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, laying, testing and commissioning in in repairs exisiting LT XLPE insulated/PVC heavy duty armoured cablle 1100 volts grade UG stranded aluminium conductor electric cable cross sectional area 25 Sqmm 4/3.5 Core including necessary connection with provision of lugs & cable gland fixing arrangements including taking down old unsv cable from existing position complete all as specified & directed.
Note:- Taking down old UNSV one complete all as specified & directed. | 400 | RM | - | - |
| 2 | All as per item No 1 above 1 but LT XLPE cross sectional area 16 Sqmm 3.5 Core all as specified and directed. | 500 | RM | - | - |
| 3 | All as per item No 1 above 1 LT XLPE , cross sectional area 35 Sqmm 3.5 Core including all as specified and directed. | 500 | RM | - | - |
| 4 | All as per item No 1 above 1 LT XLPE cross sectional area 10 Sqmm 2.0 Core including all as specified and directed. | 300 | RM | - | - |
| 5 | All as per item No 1 above 1 LT XLPE cross sectional area 10 Sqmm 4.0 Core including all as specified and directed. | 300 | RM | - | - |
| 6 | All as per item No 1 above 1 LT XLPE cross sectional area 6 Sqmm 2.0 Core including all as specified and directed. | 300 | RM | - | - |
| 7 | Excavation in trenches n. exc 1.5 Mtr wide and n. exc 1.5 mtr in depth and getting out in soft soil.
Note:- Excavation carried out by contractor without damage existing services i.e water supply elect HT/LT cable, sewage line, F net cable, signal and other service related services. If it is any services damage by contractor during excavation of work it will repair/serviceable at site without any extra cost. | 303.75 | Cum | - | - |
| 8 | Excavation in trenches n. exc 1.5 Mtr wide and n. exc 1.5 mtr in depth and getting out in hard soil.
Note:- Excavation carried out by contractor without damage existing services i.e water supply elect HT/LT cable, sewage line, F net cable, signal and other service related services. If it is any services damage by contractor during excavation of work it will repair/serviceable at site without any extra cost. | 91.35 | Cum | - | - |
| 9 | Returning Filling in including spreading, leveling, watering & well ramming in layers n. exc 25 Cm. | 349.7 | Cum | - | - |
| 10 | Removing excavated/Surplus soil n exc 50 Mtr & depositing where directed at a level n. exc 1.5 Mtr above the starting point. | 45.4 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TENDER8431.pdf
Tender Documents • 0.81 MB
BOQ_874692.xls
BOQ • 1.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .