Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.0 LAccepted-AOC | ₹7.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.2 LRejected-AOC | ₹7.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | V.ESSAKIKANNAN L2 | DHACHANAMOORTHY BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with an intial lead of 10m & intial lift of 2m in sand, slit or other loose soil, wet sand or slit not under water, light black cotton soil sandy loam and ordinary soil including excavated earth as standard specification SS 20 B including refilling charges etc complete., complying with standard
specification | 11 | m3 | 215 ₹2,365 | 207.5 ₹2,282.5 Lowest |
| 2.00 | Cement concrete of mix 1:4:8 (one cement, four sand and eight aggreate) using 40mm ISS HBG metal from approved quarry including all cost and conveneyance of materials to site and all labour charges etc., complying with standard
specification. | 3.99 | m3 | 5,229 ₹20,889.85 | 5,020 ₹20,054.9 Lowest |
| 3.00 | Collection , supply and filling of red gravel from approved quarry for filling for foundation and beasement including cost and conveyance of all materials etc., complete complying with
standard specification | 20 | m3 | 486 ₹9,718.37 | 467 ₹9,338.44 Lowest |
| 4.00Providing steel centering for sides and soffits of cement concrete works including necessary strutting arrangements with strutting for plain surfaces in foundation and basement for RCC grade beams , column footings , columns , plinth beams , staircase , with all cost and conveyance of materials and labor charges etc., complete complying with standard specification | |||||
| 5.00WITHOUT PROPS | |||||
| 6.00 | COLUMN FOOTING, GRADE BEAM AND PLINTH BEAM | 20 | m2 | 868 ₹17,360 | 834 ₹16,680 Lowest |
| 7.00WITH PROPS | |||||
| 8.00 | RCC COLUMN AND SUNSHADE | 21 | m2 | 1,068 ₹22,428 | 1,026 ₹21,546 Lowest |
| 9.00 | LINTEL, BEAM AND SLAB | 30 | m2 | 950 ₹28,499.05 | 912 ₹27,359.09 Lowest |
| 10.00Reinforced cement concrete 1 : 11/2 : 3 ( one cement, one & a half sand and three jelly ) using 20m ISS HBG metal from aproved quarry and all cost of materials for all RCC works with all cost and conveneyance of materials and labour charges etc., complete complying with standard specification | |||||
Tender Value
₹7.6 L
EMD Value
₹7,560
Closing Date
4 Nov 2025, 3:00 pmClosed
COMMISSIONER, TIRUNELVELI CORPORATION
TIRUNELVELI CORPORATION
Proposed construction of Kitchen and store room at Pranthan Kulam Union Middle School in Ward No.07 Palayamkottai Zone
2025_MAWS_616020_1
31/2025-26/40
Open Tender
Civil Works
Works
120 days
TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹7,560
TIRUNELVELI CORPORATION
22 Jun 2026
22 Oct 2025
4 Nov 2025
22 Oct 2025
4 Nov 2025
22 Oct 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_736075.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_736075.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].