Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹14.1 L+₹2,192.91 (0.16%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹14.3 L
EMD Value
₹15,000
Closing Date
21 Jul 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT - AGAMT 2021-22 - Veppanapalli Block - Desiliting of Eri Baby pond, Retaining wall and Strengthing of bund -2 Works - in Nachikuppam Panchayat Package No - TN-04-KRI-115
2022_RDTN_239340_1
Roc_42_2022_R10__20_06_2022
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
DRDA Krishnagiri
2 Aug 2022
5 Jul 2022
21 Jul 2022
5 Jul 2022
21 Jul 2022
5 Jul 2022
6 Jul 2022
Amount
1.Desiliting of Pudhu Eri, Baby pond, Retaining wall (120 m) and Strengthing of bund at Kathiripalli H/o Nachikuppam -Rs.7.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Provision for name Board
Construction of Baby pond, Retaining wall
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Earthwork in all expected hard rock requiring blastion and conveying earth moving mechinareies and tippers for formation of bund in layer of suitable thickness for formation of bund in layers of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compacted of each layer to 95% proctor density using power / vibrator roller etc., complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2.Desiliting of settil Eri, Baby pond, Retaining wall (120 m) and Strengthing of bund at Puram H/o Nachikuppam - Rs. 7.25311 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Provision for name Board
Construction of Baby pond, Retaining wall
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Earthwork in all expected hard rock requiring blastion and conveying earth moving mechinareies and tippers for formation of bund in layer of suitable thickness for formation of bund in layers of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compacted of each layer to 95% proctor density using power / vibrator roller etc., complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Murugesan Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .