| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC | ₹8.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹8.0 CrRejected-Finance | ₹8.0 Cr | L2 | Rejected-Finance Quoted Price Bid is higher than the other Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical 1 Clause 1.4 of Section 3, 2 Clause 4.4 B. b i. of Section 2,3 Clause 7 of ITB |
| 4 | Rejected-Technical | - | - | Rejected-Technical 1. Clause 1.1 of Section 3 and clause 4.2 a ITB, 2 Clause1.10 of Section 3 and Cl. 4.2 k of Sec.2, 3 Clause 4.2 k of ITB,4 ITB 4.4 B a ii, 5 Clause 1.4 of Section 3, 6 Clause 4.4B. b i. of Section 2, 7 ITB 4.4 B a ii |
Tender Value
₹8.0 Cr
EMD Value
₹16.1 L
Closing Date
6 Jul 2020, 4:00 pmClosed
Chief Engineer,PMGSY
Chief Engineer,PMGSY (ARRDA) RWD, Itanagar, C.Sector(A.P)
Paver Block , GSB,WBM, PMC and pucca drain etc
2020_CEAR_95045_1
AR06/02/003
Open Tender
Civil Works - Roads
365 days
Ziro
As Specified in SBD
9 documents required · 9 mandatory
₹15,000
Chief Executive Officer, ARRDA
₹16.1 L
Yes
O/o the Executive Engineer,RWD,Ziro
2 Sept 2020
22 Jun 2020
7 Jul 2020
22 Jun 2020
6 Jul 2020
24 Jun 2020
27 Jun 2020
Amount
Dismantling of flexible pavement.
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100m, stacking serviceable and unserviceable materials separately as per technical specification clause 202.
Earthwork
a. Excavation in Soil in hilly area by manual means including cutting and trimming of side slope and disposing of excavated earth with a lift upto 1.5 mtr and lead upto 20 mtr as per technical specification clause 1603.1
b. Excavation in Soil in hilly area by mechanical means including cutting and trimming of side slope and disposing of excavated earth with a lift upto 1.5 mtr and lead upto 20 mtr as per technical specification clause 1603.1
a.)Excavation in hilly area in ordinary rock not requirng blasting by Manual means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 mtr and lead 20 mtr as per clause 1603.2
b.)Excavation in hilly area in ordinary rock not requirng blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 mtr and lead 20 mtr as per clause 1603.2
Setting Out
Providing and fitting/fixing of Bamboo batter peg with Bamboo (1st Class) 85 mm - 100 mm dia, 2.0 m long including driving the peg upto 60 cm. depth and marking with paint, sharpening the bottom portion and maintaining the lines etc. complete.
Construction of reference pillar/back pillar bench mark/job pillar as per drawing and specification.
Shoulder preparation
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
FOR GSB LAYER (200 mm thick)
Construction of granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.
WBM 3 for base course ( 75 mm thick)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual means
Paver block
Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
CC strip
Providing and laying at or near ground level factory made kerb stone of M-25grade cement concrete in position to the required line, level and curvature, jointedwith cement mortar 1:3 (1 cement: 3 coarse sand), including making joints withor without grooves (thickness of joints except at sharp curve shall not to morethan 5mm), including making drainage opening wherever required complete etc.as per direction of Engineer-in-charge (length of finished kerb edging shall bemeasured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge).
RCC SLAB CULVERT
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 Nominal mix 1:3.6
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:4 cement mortar
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:5 cement mortar
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 With Sandy material
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification clauses 802,804,805,806,807,1202 and 1204.PCC M20 Nominal mix 1:2:4.
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Retaining wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i) Ordinary soil upto 3m depth
Providing concrete for plain/reinforced concrete in open foundations as drawing and technical specifications clause 802,803,1202 and 1203.(1:3:6)
Coursed Rubble Masonry (Second sort) with hard stone in foundation and plinth in cement mortar 1:4
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. (II) Coursed rubble masonry (2nd sort), (ii) In 1:4 cement mortar
Back filing behind the Abutment, wing wall and return wall complete as per drawing and technical specifications ,clause 1204.3.8
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Pucca Side Drain
Construction of CC side drain 15cm thick both side wall height 32cm M15(cc 1:2:4), cc base in M10(cc 1:3:6) 15cm thick i/c plastering earthwork complete as per drawing and direction of engineer incharge.
Road Furniture
Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx260cm above G.L.),(Size of board 1x 85cmx85cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
Providing and Fixing Title information Board of PMGSY Project(RCC)
Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245cm above G.L.),(Size of board 2x 90cmx80cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
Providing and Fixing Citizen information Board of PMGSY Project(RCC)"A"
Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245cm above G.L.),(Size of board 2x 90cmx80cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001.
Diversion one km ahead
Road ahead closed
Men at work
Road closed
Kilometre stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. i) Ordinary Kilometer Stone (Precast)
Routine Maintenance
First Year
Second Year
Third Year
Fourth Year
Fifth Year
Add GST @ 12%
M/S N.M ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf