| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 CrAccepted-AOC KOODUTHURAIPATTI KONGARAPATTI PO HARUR TK DHARMAPURI DISTRICT | L1 | Accepted-AOC Quoted Less Percentage | |
| 2 | L2₹37.2 Cr+₹1.7 Cr (4.77%)Rejected-AOC NO 5 8 KANKATTI ALA PERIYAKUTTY MADUVU POST VAZHAPPADI TALUK SALEM 636101 | SALEM | SALEM | TAMIL NADU | 636101 | L2 | Rejected-AOC Quoted Above Percentage | |
| 3 | L3₹38.3 Cr+₹2.8 Cr (7.84%)Rejected-AOC 25A KALIYAPPA GOUNDER STREET MATHIGONPALAYAM DHARMAPURI DISTRICT 636 702 | 636702 | L3 | Rejected-AOC Quoted Above Percentage |
Tender Value
₹34.8 Cr
EMD Value
₹17.5 L
Closing Date
30 Sept 2025, 10:30 amClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem Steel Plant Main Road, Jagir Ammapalayam, Salem
Widening from Two Lane to Four Lane and Strengthening at Km 10/0-12/0 and 14/4-18/6 of Hosur -Denkanikottai (via) Thalli Road including CD Works at Km 11/4, 14/10, 15/6, 15/8, 16/6, 16/10 and Construction of Drain, Retaining Wall and Paver Block
2025_HWAY_598349_1
18 / 2025-2026 / HDO, Dated. 18.08.2025-5
Open Tender
Civil Works - Roads
Percentage
365 days
Krishnagiri
Refer Tender Document
3 documents required · 3 mandatory
₹0
₹17.5 L
Salem
3 Dec 2025
29 Aug 2025
30 Sept 2025
29 Aug 2025
30 Sept 2025
29 Aug 2025
2 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of MORTH - Vth Revision etc.,complete. | |||||
| - | Widening from Two Lane to Four Lane and Strengthening at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works at Km 11/4, 14/10, 15/6, 15/8, 16/6, 16/10 and Construction of Drain, Retaining Wall and Paverblock. | 14,587 | One Square Metre | 23.36 | ₹3,40,752.32 |
| - | 1.10 Providing Branch Road Improvements at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road | 195.47 | One Square Metre | 23.36 | ₹4,566.18 |
| 2Earthwork Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all material necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, Box cutting for widening portion as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision | |||||
| - | Widening from Two Lane to Four Lane and Strengthening at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works at Km 11/4, 14/10, 15/6, 15/8, 16/6, 16/10 and Construction of Drain, Retaining Wall and Paverblock. | 11,596 | One Cubic Metre | 131.89 | ₹15,29,396.44 |
| - | 1.10 Providing Branch Road Improvements at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road | 52.55 | One Cubic Metre | 131.89 | ₹6,930.82 |
| 3 | Earthwork Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all material necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORT&H Specification.
Formation of embankment using Carted Earth | 11,617 | One Cubic Metre | 464.93 | ₹54,01,091.81 |
| 4Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 as per clause 406 of MORTH Rev-5 (Grading - V) | |||||
| - | Widening from Two Lane to Four Lane and Strengthening at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road including CD Works at Km 11/4, 14/10, 15/6, 15/8, 16/6, 16/10 and Construction of Drain, Retaining Wall and Paverblock. | 8,610 | One Cubic Metre | 2,193.65 | ₹1,88,87,326.5 |
| - | 1.10 Providing Branch Road Improvements at Km 10/0 - 12/0 and 14/4 - 18/6 of Hosur - Denkanikottai (via) Thalli Road | 31.51 | One Cubic Metre | 2,193.65 | ₹69,121.91 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_715195.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .