| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.9 LAccepted-Finance | ₹80.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹81.0 LRejected-Finance NO 46 B CHURCH STREET VELLAGOUNDANPATTI VILLAGE AYYAPURAM POST KADAYANALLUR TALUK TENKASI DISTRICT | TENKASI | TAMIL NADU | 626140 | ₹81.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MR.TAMIL SELVAN, CONTRACTOR L1 | ANTONY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.001.Providing Cement Concrete Pavement at Nambirajan 1st Street in Bharathi Nagar at Kalappakulam village and Panchayat | |||||
| 2.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 6 | Cum | 197.82 ₹1,186.92 | 198 ₹1,188 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete | 135.68 | Cum | 5,346.68 ₹7.3 L | 5,348 ₹7.3 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 80 | Sqm | 364.96 ₹29,196.80 | 366 ₹29,280 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 9.2 | Cum | 6,098.05 ₹56,102.06 | 6,099 ₹56,110.80 |
| 6.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 129.68 | Cum | 235.91 ₹30,592.81 | 236 ₹30,604.48 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 100.71 | Cum | 6,638.79 ₹6.7 L | 6,640 ₹6.7 L |
| 8.00 | Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 22.14 | Cum | 508.95 ₹11,268.15 | 510 ₹11,291.40 |
| 9.002.Providing Cement Concrete Pavement with Drainage in Bala vinayagar kovil street in at Naethaji nagar at Kalappakulam village and Panchayat | |||||
| 10.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 33.75 | Cum | 197.82 ₹6,676.43 | 198 ₹6,682.50 |
Tender Value
₹81.9 L
EMD Value
₹82,000
Closing Date
7 Jan 2026, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Providing Cement road and Drinage at Kalappakulaml panchayat in Sankarankovil Panchayat union. package No.1 under CGF 2025-26 (Saving and Interest)
2025_RDTN_636065_1
DIPR/6797/Tender/2025 TSI SNKL SPL Fund
Open Tender
Civil Works
120 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹82,000
DRDA,Tenkasi
5 Jun 2026
24 Dec 2025
7 Jan 2026
24 Dec 2025
7 Jan 2026
24 Dec 2025
2 Jan 2026
Amount
1.Providing Cement Concrete Pavement at Nambirajan 1st Street in Bharathi Nagar at Kalappakulam village and Panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
2.Providing Cement Concrete Pavement with Drainage in Bala vinayagar kovil street in at Naethaji nagar at Kalappakulam village and Panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
3.Providing Cement Concrete Pavement with Drainage at Kirupananthavariyar school street in Nesavalar colony at Kalappakulam village and Panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
4.Providing Cement Concrete Pavement with Drainage at Kirupananthavariyar school north street in Nesavalar colony at Kalappakulam village and Panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
5.Providing Cement Concrete Pavement with Drainage at Kirupananthavariyar school north street in Nesavalar colony at Kalappakulam village and Panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ANTONY CONSTRUCTION (BID ID -1555627)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BIDDOC.pdf
Tender Documents • 1.11 MB
BOQ_761185.xls
BOQ • 0.25 MB