| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC 36 RANJEET NAGAR SHAHBAD MARKANDA NH 1 KURUKSHETRA HARYANA 136135 | KURUKSHETRA | HARYANA | 136135 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹9.2 L+₹1.7 L (22.8%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹9.7 L+₹2.2 L (30.0%)Rejected-Finance 849 1 BADDI SHITALPUR BADDI INDUSTRIAL AREA SOLAN 173205 | SOLAN | HIMACHAL PRADESH | 173205 | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹12.6 L+₹5.1 L (68.4%)Rejected-Finance | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹14.9 L+₹7.4 L (98.6%)Rejected-Finance | L5 | Rejected-Finance Not being L1 |
Tender Value
₹20.7 L
EMD Value
₹41,430
Closing Date
24 May 2025, 6:00 pmClosed
GE PANAJI
GARRISON ENGINEER OPPOSITE KALA ACADEMY ST INEZ ROAD PANAJI GOA403001
PRELIMINARY ACTIVITIES IN RESPECT OF SOIL INVESTIGATION AND TOPOGRAPHICAL SURVERY FOR THE WORK PROVN OF DEFI OTM ACCN FOR A TTR AT BAMBOLIM CAMP
2025_MES_706544_1
8208/E8
Open Tender
Survey
Item Wise
60 days
GE PANAJI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER PANAJI
₹41,430
Yes
28 Jul 2025
3 May 2025
31 May 2025
3 May 2025
24 May 2025
17 May 2025
3 May 2025 - 10 May 2025
Amount
Conducting Soil investigation (Bore Holes) as per IS :1892-2021 by manually/calax rotary drilling of 100-150 mm diameter with casing pipe/bentonite slurry if required for supporting inner collapsible stratum below water table with pot holes/helical auger in any type of soil upto depth of 10 mtr. Conducting standard penetration test (SPT) at regular intervals and submit the the SBC report. Disturbed and undisturbed soil sample to be collected at a sampling interval of 1.00 mtr depths or at change of strata or as per relevant IS Code.
Note:- A) The following laboratory test are required to be conducted on disturbed soil and detailed result to be given in tabular form:- (i) Sieve analysis & Grain Size distribution by sieve analysis & hydrometer test (ii) Atterbergs Limits (iii) Natural Moisture Content test (iv) Particle size analysis test (v) Bulk density/dry density
B) The following laboratory test to be conducted on undisturbed soil samples as considered necessary according to relevant specification of IS 2720 and detailed result showing all relevant calculations, inferences, indices and parameters shall be given in the soil report :- (i) Natural Moisture Content test (ii) Bulk density (iii) Specific gravity Test (iv) Free Swell Index Test and swelling properties of soil. (v) Organic matter in soil if any. (vi) Consolidation test (compressed index value) (vii) Triaxial compression test and determination of shear parameters (C & phi) test as per relevant IS. (viii) Harmful salt (complete investigation as already ref)
C) Maximum and Minimum levels of Ground Water in the area with source of information and Ground water Table observed during the observation.
(a)Bore Hole - Depth of 15 mtr
(b) Bore Hole - Depth of 10 mtr
(c)Bore Hole - Depth of 5 mtr
(d) Trial Pit Size (1.2mx1.2m) of 3 mtr depth
Carrying out topographical survey by using total station with spot levels at 3m c/c and marking of existing structure/features of ground incluing submission of EIGHT sets of survey report containing contour plan @ 1m contour interval and block level plan with 3m c/c spot levels etc, complete all as per latest IS codes and as directed by Engr in charge. ( (Site clearance for carrying out survey shall be considered deemed included in the quoted rates).
Note:- (i) SBC recommendation for all bore holes at a depth size 1.5 m,2.00 m, 2.5 m etc is required for following footings :- (a)1.5mx1.5m (b)1.5m x2.5m (c)2.00mx2.50m (d) 2.00m x3.00m (d) 2.00m x 3.5m (e) 2.5m x3.00m. In addition recommendation on type of foundation including other parameter has to be provided by the consultant. (ii) Swelling index & Swelling pressure in respect of Black cotton soil and its depths of layeres to be provided. (iii) Photographic & Videographic record of geo-exploration as well as testing shall also be part of the report. (iv) Recommendations as regards possibility of liquefaction of soil in case of saturated or partially saturate loose/uncompacted sandy soils. (v) Depth of Ground water Table (GWT) in peak monsoon (lowest) and peak summer (Highest) after correction of result with seasonal variation of water table in the station. (vi) Recommendation for filling under floor/beams. (vii) Location duly marked on the site plan shall be part of the report. (viii) A total of 8 Nos Reports(in Original) to be submitted (ix) The work shall be carried out in Two Phases - (a) Phase 1 - Physical Survey To be carried out within 30 days of placement of Work Order. (b) Phase 2 - Submission of reports - Draft report within 1.5 months of placement of Work Order. Final report duly vetted within 2 months. (x) The soil investigation is to be carried out in different pockets of Bambolim, Madgao and Ponda under GE Panaji. Transporation and shifting of machinery and workers for the survey shall be considered deemed included in the quoted rates.
Independent consultanats and technocrates private limited (BID ID -3299653)
Shiva Testing and Research Laboratory Pvt. Ltd. (BID ID -3304353)
vatsalya consultant andservices (BID ID -3301364)
R.B TESTING (BID ID -3302801)
SKW Soil and Survey Co (BID ID -3300990)
Edge Consultants (BID ID -3303888)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .