Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.9 LAccepted-AOC BOKARO | BOKARO | JHARKHAND | 825102 | ₹98.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹99.9 LRejected-AOC DUGDA BASTI BRAHMAN TOLA DUGDSA COAL WASHERY KARMATAND BOKARO | BOKARO | JHARKHAND | 825102 | ₹99.9 L | L2 | Rejected-AOC ok |
| 3 | Rejected-Technical BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical PRO DEVEDRA KR MAHTO AT P O BIRNI P S NAWADIH BOKARO | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical Not Qualified |
Tender Value
₹99.9 L
EMD Value
₹2 L
Closing Date
31 Jan 2026, 5:00 pmClosed
Executive Engineer, R.D.Spl.Div. Bokaro
O/o Executive Engineer, R.D.Spl.Div. Bokaro 1st floor, working womens hostel, Camp-II, B.S. City, Bokaro-827001
Construction of Drain with Slab from Turi Tola to School at Ahardih in GP - Ahardih under Block - Nawadih, District - Bokaro
2026_RDSPL_109647_1
RDD/SD/BOKARO/17/2025-26
Open Tender
Civil Works
180 days
Ahardih, Nawadih
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹2 L
13 Apr 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
Laying and Jointing PVC Pipe. Heading
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately. R.C.D. S.O.R. Item No. - 2.06
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. B.C.D. S.O.R. Item No. 5.1.1 + 5.1.2
Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) B.C.D. S.O.R. Item No. 5.1.10
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level -do- -do- all complete job as per specification and direction of E/I. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) B.C.D. S.O.R. Item No. 5.3.1.4
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level -do- -do- all complete job as per specification and direction of E/I. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) B.C.D. S.O.R. Item No. 5.3.9.1
Providing centering including strutting, propping etc. and its removal after use in Foundations, footings, bases of columns, etc. for mass concrete -do- -do- all complete job as per specification and direction of E/I. B.C.D. S.O.R. Item No. 5.3.17.1
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level -do- -do- all complete job as per specification and direction of E/I. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) B.C.D. S.O.R. Item No. 5.3.9.1
Providing centering including strutting, propping etc. and its removal after use in Columns, Pillars, Piers, Abutments, Posts and Struts -do- -do- all complete job as per specification and direction of E/I. B.C.D. S.O.R. Item No. 5.3.17.6
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). -do- -do- all complete job as per specification and direction of E/I. B.C.D. S.O.R. Item No. 5.3.11
Providing centering including strutting, propping etc. and its removal after use in Suspended floors, roofs, landings, balconies and access platform, Deck Slab -do- -do- all complete job as per specification and direction of E/I. B.C.D. S.O.R. Item No. 5.3.17.3
Providing Tor steel reinforcement of 8mm/10mm/12mm/16mm dia etc. rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500. B.C.D. S.O.R. Item No. 5.5.4 - 8mm dia Bar
B.C.D. S.O.R. Item No. 5.5.5 (b) - 10mm/12mm and above dia Bar
Carriage of materials (i) Cement
(ii) Sand
(iii) Stone Chips
(iv) Steel Reinfocement
(v)Stone Metals
Add. 18% GST
Add. 1% Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_148123.pdf
techsummary_148123.pdf
finance_148123.pdf
BOQ Comparative Chart
xlsx
finsummary_148123.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_148123.xls
BOQ • 0.25 MB
SBD.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid