Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹165.0 CrAdmitted-Finance PLOT NO 61 KESHAV NAGAR HAWA SADAK JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | L1 | Admitted-Finance | ||
| 2 | L2₹168.7 Cr+₹3.7 Cr (2.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹127.8 Cr
EMD Value
₹2.6 Cr
Closing Date
23 May 2023, 6:00 pmClosed
Chief Engineer Project PHED Jodhpur
o/o Chief Engineer Project PHED Jodhpur
Drinking water supply project for providing FHTCs in 36 villages and 3 towns Sirohi, Pindawara and Bhanwari through Battisa Dam of District Sirohi under JJM
2023_PHCJO_334433_1
Short Term NIB No 04/2023-24 CE P PHED Jodhpur
Open Tender
Civil Works - Water Works
Percentage
540 days
Sirohi
As per bid document
3 documents required · 3 mandatory
₹25,000
EE PHED Project Division Sirohi
₹2.6 Cr
Yes
o/o Chief Engineer Project PHED Jodhpur
27 Jun 2023
6 May 2023
24 May 2023
6 May 2023
23 May 2023
6 May 2023
16 May 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROVISION OF COST OF FILTER PLANT AT DELDAR HEAD WORKS | - | - | - | - |
| 2 | Design, construction, execution, testing and commissioning of Rapid Gravity filterTreatment Plant capacity 17.5 MLD(875 KLH) including all relevant civil, electrical , mechanical ,instrumentation and atomization as per scope of work at Deldar H/W.As per scope of Works. | - | KL | 3,300 | - |
| 3 | PROVISION OF COST OF PUMPING MACHINERY | - | - | - | - |
| 4 | Designing, Providing, installation, testing, trial run and commissioning of pumps & energy efficient motors with base plate and other accessories (1W+1S,except Deldar to Bhanwari), MS/DI/GI/CI piping work complete job including suction / delivery piping, header pipes with provision of future expansion, pipes to pump inlets includes compound pressure gauge, gate valve & dismantling joint, Sluice Valves on suction & delivery individual common header with dismantling joints, all fittings etc. complete, delivery manifold, outlet pipes with specials, sluice valves with dismantling joint on individual and common delivery header, dual plate check valve, expansion bellow, Motor control and APFC panel for the pumps for all motors for pumping stations, cables with cable trays and accessories for motors & electrical equipment, Submersible type dewatering pump (1W+1S) with level control switch, HT/LT Soft-Start starter , all necessary electric and mechanical accessories, design, supply and installation of Earthing system for LT equipments, pressure gauge, external & internal lighting, capacitor, over load relay, exhaust fan, power Factor control panels,electric valve actuators,CVPT voltmetre, ampermeter, phase, preventor, instrumentation and motors at pumping station and other accessories, campus electrification, lightening control panels, Ring main unit, foundation of pumping sets, etc MEI complete job includes Sub Station,Transformer(1W+1S) and all on wardds works up to Head Works in all respect as per specifications and scope of work including civil works etc. complete in all respect. | - | - | - | - |
| 5 | WTP DELDAR TO BHAVRI IPS (85.5 KW) 290 KLH 65 Mtr Head 4 Nos ( 2 working + 2 Standby) . | - | Lot. | 51,30,000 | - |
| 6 | WTP DELDAR TO BHARJA ESR, BHEEMANA ESR AND IPS VATERA. (53 KW) 150 KLH 76 Mtr Head 2 Nos ( 1 working + 1 Standby) . | - | Lot. | 15,90,000 | - |
| 7 | WTP DELDAR TO DELDAR ESR. (9.5 KW) 20 KLH 54 Mtr Head 2 Nos ( 1 working + 1 Standby) . | - | Lot. | 2,85,000 | - |
| 8 | TOONKA ESR TO TOONKA OH. (3.5 KW) 5 KLH 25 Mtr Head 2 Nos ( 1 working + 1 Standby) . | - | Lot. | 1,05,000 | - |
| 9 | IPS BHAVRI TO KACHOLI ESR (9.5 KW) 40 KLH 42 Mtr Head 2 Nos ( 1 working + 1 Standby) . | - | Lot. | 2,85,000 | - |
| 10 | IPS BHAVRI TO IPS KER AND NITAURA ESR (132 KW) 320 KLH 90 Mtr Head 2 Nos ( 1 working + 1 Standby) . | - | Lot. | 39,60,000 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.67 MB
BOQ_593447.xls
BOQ • 0.64 MB
VolIVPremableofSchedule.pdf
Other Document • 0.16 MB
EPROC04.pdf
Tender Documents • 37.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .