Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹7 L
Closing Date
7 Nov 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EO Hasayan
EO Hasayan
Nagar Panchayat Hasayan mei Kondra Marg par Esrar (Lala) ki Dukan se Riyaz ke makan tak RCC Nala Nirman Kary
2026_DOLBU_1197584_1
567/e-tender-C.jal.Ni./NP Hasayan/2025-26/ Dt. 15-10-2026
Open Tender
Civil Works
Percentage
90 days
Hasayan
Please refer Tender documents.
2 documents required · 2 mandatory
₹21,774
EO Hasayan
₹7 L
17 Oct 2026
17 Oct 2026
7 Nov 2026
17 Oct 2026
7 Nov 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. DSR code no. 2.6.1 (Excluding Cost of GST) | 1,006.4 | Cum | 129.24 | ₹1,30,067.14 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR code no. 2.27.(Excluding Cost of GST) | 243.09 | Cum | 1,546.37 | ₹3,75,907.08 |
| 3 | Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR code no. 4.1.8(Excluding Cost of GST) | 81.03 | Cum | 4,960 | ₹4,01,908.8 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal
size derived from natural sources) DSR code no.5.1.2(Excluding Cost of GST) | 431.95 | Cum | 6,586.49 | ₹28,45,034.36 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. As DSR no. 5.22.6 (Excluding Cost of GST) | 37,298.71 | Kg | 78.53 | ₹29,29,067.7 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for DSR code no.5.9.5(Excluding Cost of GST) | 2,912.88 | Sqm | 536.2 | ₹15,61,886.26 |
| 7 | Dewatering of nala water between two bandha by 5 HP diesel pump incl. hire charges and its fuel etc. as irrigation sor item no. 10a (Excluding Cost of GST) | 145 | Hr | 140 | ₹20,300 |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. as DSR no. 15.60 (Excluding Cost of GST) | 1,006.4 | Cum | 192.19 | ₹1,93,420.02 |
| 9 | P/F of inaguration signboard with brick work and Plaster in 1:4 Cement mortar with black granite stone including engraving of proper language all complete(Excluding Cost of GST) | 1 | Job | 7,000 | ₹7,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
BOQ_2262469.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .