Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance | ₹24.7 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹25.2 L+₹49,464 (2.00%)Rejected-Finance | ₹25.2 L+₹49,464 (2.00%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹25.4 L+₹64,303 (2.60%)Rejected-Finance | ₹25.4 L+₹64,303 (2.60%) | L3 | Rejected-Finance Rejected |
Tender Value
₹24.7 L
EMD Value
₹24,800
Closing Date
28 Jul 2026, 9:00 amClosed
Executive.Engineer.WD.Z.P.Sindhudurg
Executive.Engineer.WD.Z.P.Sindhudurg
Providing WBM and BT surface on Konlos Awalegaon main road to waterfall near Mauli Mandir VR 147road tal kudal
2026_SINDH_1317002_3
SZP/WD/TENDER/SUBE/10/26-27
Open Tender
Civil Works
Percentage
180 days
kudal
Unemployed Engineers only
10 documents required · 10 mandatory
₹1,000
₹24,800
15 Sept 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1 - Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 75.94 | Cmt | 130.65 | ₹9,921.56 |
| 2 | Item No.2 - Supplying trap/ granite/ quartzite/ gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken | 66 | Cmt | 1,433.2 | ₹94,591.2 |
| 3 | Item No.3 - Supplying trap / granite/ quartzite/ gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken | 60 | Cmt | 1,488.1 | ₹89,286 |
| 4 | Item No.4 - Supplying soft murum at the road site, including conveying and stacking complete. | 1 | Cmt | 828.8 | ₹828.8 |
| 5 | Item No.5 - Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge | 126 | Cmt | 93.3 | ₹11,755.8 |
| 6 | Item No.6 - Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 73.22 | Cmt | 86.75 | ₹6,351.84 |
| 7 | Item No.7 - Compacting the sub grade / gravel / size metal (200 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | 660 | Cmt | 29.65 | ₹19,569 |
| 8 | Item No.8 - Compacting the size metal (100 mm loose) layers for all widths with static roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | 600 | Cmt | 27.45 | ₹16,470 |
| 9 | Item No.9 - Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | - | M.T. | 266.9 | - |
| 10 | Item No.10 - Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 100% crusher broken metal with conical crusher palnt, heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30 Kg Sqm.on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | - | MT | 316.8 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_2257828.xls
BOQ • 0.27 MB
Tenderform.pdf
Tender Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .