Tender Value
₹15.2 L
EMD Value
₹15,235
Closing Date
20 Jan 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of manhole and RCC pipeline work at corporation colony cross street in ward 58
2025_MAWS_516213_1
E7/ EST 761/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹15,235
4 Mar 2025
4 Jan 2025
20 Jan 2025
4 Jan 2025
20 Jan 2025
4 Jan 2025
Amount
Cutting the existing Paverblock road surface etc., complete
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.
Construction of manholes using Sulphate resistant cement at various sepths to invert including earth work excavtion as per SS20B, laying cement concrete in C.M 1:3:6 using 40mm B.G. jelly for foundation ,sinking well kerb below G.L.for 4.5m depth and above,pumping,timbering charges for 2.5m depth and above,stock brick work in C.m. 1:3,for 23cm thick wall and over 23cm thick wall,plastering interior with C.M 1:3,20mm thick and exterior with C.M 1:3,12mm thick,laying plain cement concrete 1:3:6 using 12.0m to 20mm B.G. jelly the frame, providing C.I. steeps,manhole cover and frame etc., complete for the following sizes for eah manhole (As per the type design drawing for manholes). Upto 1.00m depth
Upto 1.50m depth
Upto 2.00m depth
Upto 2.50m depth
Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0- 3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0- 7mts. and (vi) 0-8mts.
Supplying , Laying and jointing of NP-4 Class RCC pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12mm HI- alumina lining with rubber ring joints.TWAD Pg.no-66,67,277,278
Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming & consolidation directed by the Engineer-in-Charge.
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer.
Replacement of underground utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork in all soil strata,including BT/CC road cutting ,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes,coupler,union,jointing materials and required specials,cutting ,threading,conveying,laying,jointing and cost of refilling for the additional earthwork etc complete and as directed by the departmental officers.
Dewatering using 3HP to 70HP disal engine pumpset including Hire charges ,cost of Diesel,Engine Oil,Pump operator,labour charge,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc.,complete.
Supplying and filling in foundation and basement with Quary Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc.
Cement Concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing , laing and labour charges etc., complete as per standed specification . MDU-CORP-BUILD-DATA-P-28-Sl-10
Cement Concrete 1:2:4 (One cement two sand and four aggregates) using 20mm gauge hard broken granite gelly for foundation including consolidation and dewatering for foundation whenever necessary etc. complete. MDU-CORP-BUILD-DATA-P-27-Sl-8
Add GST 18%
AR CONSTRUCTIONS (BID ID -1231704)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .