| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance Lower amount quoted |
| 2 | L2₹1.4 CrRejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.4 Cr | L2 | Rejected-Finance Higher amount quoted |
| 3 | L3₹1.5 CrRejected-Finance DHALIWAL | AMRITSAR | PUNJAB | 143001 | ₹1.5 Cr | L3 | Rejected-Finance Higher amount quoted |
| 4 | L4₹1.5 CrRejected-Finance VILL JIAR P O CHOURI TEH SUJANPUR DISTT HAMIRPUR H P | SUJANPUR | HAMIRPUR | HIMACHAL PRADESH | ₹1.5 Cr | L4 | Rejected-Finance Higher amount quoted |
| 5 | L5₹1.6 CrRejected-Finance | ₹1.6 Cr | L5 | Rejected-Finance Higher amount quoted |
| Sl No | Description | Qty | Unit | Vivek Dhiman L5 | Naveen Kumar L2 | Ravinder Kumar Sahore L3 | Pawan Kumar Sharma L4 | puneet angra L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft / hard rock or chieselling soft/ hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including, shoring, strutting, planking, timbering and dewatering, wherever required, stacking the useable and unuseable material/ soil separately and after laying, jointing and testing of pipes returing the useable soil in trenches in 15 cm ( Fifteen centimeter ) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil / un-useable materials as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 4,390.67 | Cum | 310 ₹13.6 L | 250 ₹11.0 L | 220 ₹9.7 L | 275 ₹12.1 L | 160 ₹7.0 L |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge | 15.7 | Cum | 4,500 ₹70,650 | 4,800 ₹75,360 | 4,200 ₹65,940 | 4,500 ₹70,650 | 3,600 ₹56,520 |
| 3.00 | Providing and laying cement concrete 1:6:12 (1cement: 6 sand 12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lift and to the entire satisfaction of Engineer-in-charge. | 10.72 | Cum | 4,000 ₹42,880 | 4,500 ₹48,240 | 3,900 ₹41,808 | 4,000 ₹42,880 | 3,000 ₹32,160 |
| 4.00 | Brick work using common burnt clay building bricks in foundation & Plinth in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge IInd class | 56.46 | Cum | 7,500 ₹4.2 L | 8,500 ₹4.8 L | 7,500 ₹4.2 L | 7,500 ₹4.2 L | 6,600 ₹3.7 L |
| 5.00 | Brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 (1 cement : 6 sand) in all lead and lifts and as per the directions of the Engineer-in-Charge.IInd class. | 31.58 | Cum | 7,500 ₹2.4 L | 8,500 ₹2.7 L | 7,200 ₹2.3 L | 7,500 ₹2.4 L | 6,450 ₹2.0 L |
| 6.00 | Half brick work using common burnt clay building bricks in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge.IInd class | 110.3 | Sqm | 900 ₹99,270 | 580 ₹63,974 | 1,100 ₹1.2 L | 900 ₹99,270 | 900 ₹99,270 |
| 7.00 | 15mm Cement plaster in single coat on fair side of brick/stone masonry for interior plastering upto floor two level including arrises,internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:3(1cement: 3sand) within all leads and lifts as per direction of Engineer-in-charge.. | 530.95 | Sqm | 250 ₹1.3 L | 280 ₹1.5 L | 260 ₹1.4 L | 250 ₹1.3 L | 250 ₹1.3 L |
| 8.00 | Pointing on brick work with cement mortar 1:3 (1cement: 3 sand) raised and cut point within all leads and lifts and as per direction of Engineer-in-charge. | 169.84 | Sqm | 215 ₹36,515.60 | 180 ₹30,571.20 | 150 ₹25,476 | 215 ₹36,515.60 | 160 ₹27,174.40 |
| 9.00 | Cement concrete flooring 1:2:4(1cement:2 sand: 4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement within all leads and lifts as per direction of Engineer-in-charge. 40mm thick. | 49 | Sqm | 490 ₹24,010 | 5,800 ₹2.8 L | 350 ₹17,150 | 482 ₹23,618 | 450 ₹22,050 |
| 10.00 | Cement concrete flooring 1:2:4(1cement:2 sand: 4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement within all leads and lifts as per direction of Engineer-in-charge. 50mm thick. | 4.32 | Sqm | 555 ₹2,397.60 | 450 ₹1,944 | 425 ₹1,836 | 555 ₹2,397.60 | 480 ₹2,073.60 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
10 Apr 2026, 12:00 pmClosed
Executive Engineer JSV Flood Prot. Division Gagret
Executive Engineer JSV Flood Prot. Division Gagret
Construction of Civil work P/L of Rising Main, S/E Pumping Machinery and P/L of HDPE Distribution system for Improvement of LIS at T/well Mawa Kaholan (Shamshan Ghat and Bhatta) and Tubewell at Rampur (Mubarikpur).
2026_HPIPH_133167_1
JSV-FPDG-EA-I/2026-27-39-78 dt. 02.04.2026
Open Tender
Civil Works
365 days
Executive Engineer JSV Flood Prot. Division Gagret
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
₹2.2 L
2 May 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
2 Apr 2026 - 10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft / hard rock or chieselling soft/ hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including, shoring, strutting, planking, timbering and dewatering, wherever required, stacking the useable and unuseable material/ soil separately and after laying, jointing and testing of pipes returing the useable soil in trenches in 15 cm ( Fifteen centimeter ) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil / un-useable materials as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 0.2 | Cum | - | - |
Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge | - | Cum | - | - | |
Providing and laying cement concrete 1:6:12 (1cement: 6 sand 12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lift and to the entire satisfaction of Engineer-in-charge. | - | Cum | - | - | |
Brick work using common burnt clay building bricks in foundation & Plinth in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge IInd class | - | Cum | - | - | |
Brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 (1 cement : 6 sand) in all lead and lifts and as per the directions of the Engineer-in-Charge.IInd class. | - | Cum | - | - | |
Half brick work using common burnt clay building bricks in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge.IInd class | - | Sqm | - | - | |
15mm Cement plaster in single coat on fair side of brick/stone masonry for interior plastering upto floor two level including arrises,internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:3(1cement: 3sand) within all leads and lifts as per direction of Engineer-in-charge.. | - | Sqm | - | - | |
Pointing on brick work with cement mortar 1:3 (1cement: 3 sand) raised and cut point within all leads and lifts and as per direction of Engineer-in-charge. | - | Sqm | - | - | |
Cement concrete flooring 1:2:4(1cement:2 sand: 4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement within all leads and lifts as per direction of Engineer-in-charge. 40mm thick. | - | Sqm | - | - | |
Cement concrete flooring 1:2:4(1cement:2 sand: 4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement within all leads and lifts as per direction of Engineer-in-charge. 50mm thick. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Form6and8.pdf
Tender Documents • 1.06 MB
TermsandConditions.pdf
Tender Documents • 0.48 MB
BOQ_196944.xls
BOQ • 0.35 MB