Loading…
Loading…
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
27 Jul 2026, 3:00 pm
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Stone pitching work on internal section of Rapti Link channel from Km 21.100 to Km 21.400 in District Shrawasti.
2026_UPIDC_1167986_9
01/SE-IX/2026-27
Open Tender
Civil Works
270 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,736
₹6.3 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
13 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 7,920.4 | M3 | 116.5 | ₹9,22,726.6 |
| 0.0 | Earth work in making Canal banks/Coffer dam/dowla/ramp in all type of soil including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 2,489.18 | M3 | 102 | ₹2,53,896.36 |
| 0.0 | Scrapping of berm having cutting/ filling upto 8 cm in all type of soil including all lead & lift, levelling, dressing etc required for proper completion of work as per direction of Engineer in charge. | 14,310 | M2 | 4.35 | ₹62,248.5 |
| 0.0 | Making subgrade for boulder pitching work including watering, compaction and preparation of surface including all lead & lift, levelling, dressing etc required for proper completion of work as per direction of Engineer in Charge. | 7,306.88 | M2 | 20 | ₹1,46,137.6 |
| 0.0 | Supplying and laying Geotextile Sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work. | 7,075.07 | M2 | 120.5 | ₹8,52,545.93 |
| 0.0 | Supplying and laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cmX20cmX15cm, manually placed and closely packed in between panels including all cost of material, labour, T&P etc required for proper completion of work. | 1,929.56 | M3 | 5,360.15 | ₹1,03,42,731.03 |
| 0.0 | Centering & Shuttering for R.C.C work with cost of shuttering including all cost of material, labour T&P etc required for proper completion of work. | 4,851.9 | M2 | 400 | ₹19,40,760 |
| 0.0 | Steel Reinforcement (Fe415 grade TMT bar) for R.C.C. work including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc required for proper completion of work. | 33.34 | MT | 88,209 | ₹29,40,888.06 |
| 0.0 | Laying P.C.C 1:3:6 with cement, coarse sand and 20mm to 40mm stone grit with mixing, laying, ramming, curing including cost of all material, labour, T&P etc required for proper completion of work, | 93.3 | M3 | 10,846.86 | ₹10,12,012.04 |
| 0.0 | Laying C.C 1:2:4 with cement, coarse sand and 10 mm to 20 mm stone grit with mixing, laying, ramming, curing, compaction including cost of all material, labour, T&P etc required for proper completion of work, | 234.32 | M3 | 11,049.66 | ₹25,89,156.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT09.pdf
Tender Documents • 5.38 MB
BOQ_2190631.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid