Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.3 Cr+₹1.4 L (1.08%)Rejected-AOC | ₹1.3 Cr+₹1.4 L (1.08%) | L2 | Rejected-AOC Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
16 May 2023, 3:00 pmClosed
Addl. Collector (Dev.) / PDDRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Strengthening of the road from Ennekollu Pudur to Ennekollu KM 0_0 to 2_06 (R 75) in Veppanapalli Block of Krishnagiri District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 Package No TN 04 KRI 41 Package NO KRI 41
2023_RDTN_310185_1
RefNo_1433_2023_R3_21_04_2023
Open Tender
Civil Works - Roads
Item Rate
VEPPANAPALLI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.3 L
DRDA KRISHNAGIRI
6 Jul 2023
3 May 2023
16 May 2023
3 May 2023
16 May 2023
3 May 2023
10 May 2023
Amount
1. Strengthening of the road from Ennekollu Pudur to Ennekollu KM: 0/0-2/06 (R-75) - Rs.132.330 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Picking 5cm to 10cm Old Metalled Surface and Sectioning -1 Sqm
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Bituminous Macadam (BM) With 50mm compacted thickness which work shall consist of construction in a single course of compacted crouched aggregates premixed with bituminous binder 60/70 grade at grade at the requirement of 3.5 present by weight of the accordance with the drawing or as directed by the engineer in charge for advance patches using central hot mix plant as per MORT & H 504
Providing and laying Tack coat over WBM/ WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for H.M Stone
Provision for K.M Stone
Provision for 60cm Equilteral Triangle Cautionary Sign Board
Provison for Name Board Cum Citizen Information Board and Maintanance Board
Construction of 1.50 m SpanCulvert at Ch 1570m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Sides
Roof Slab
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Refilling the basement with excavated earth other than sand complying the standard specification
Provision for bitumen pad
Provision for Weep Holes
Construction of Drain Ch 765 to 900m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Plastering with Cement Mortar 1:4 mix to 20mm thick including cost and coveyance of all materials to site and all labour charges etc complete
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PAPPANAN CONTARCTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .