| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹55.4 LAccepted-AOC VILU TULSIPUR POST MOTIGANJ GONDA | GONDA | UTTAR PRADESH | 271001 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹62.4 L+₹7.0 L (12.6%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical SIDDHARTH NAGAR | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
25 Jan 2021, 1:00 pmClosed
SUPERINTEND ENGINEER
Rapti Nahar Nirman Mandal-1 Balrampur
As Per Tender Notice
2021_UPIDC_546274_1
08/SE/2020-21
Open Tender
Civil Works - Canal
Item Rate
45 days
Sohratgarh Siddharthanagar
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹1.4 L
Yes
Rapti Nahar Nirman Mandal-1 Balrampur
5 Feb 2021
18 Jan 2021
25 Jan 2021
18 Jan 2021
25 Jan 2021
18 Jan 2021
19 Jan 2021
Amount
E/W in excavation of foundation in all type of soil including all lead & lift and its proper disposal and back filling as per direction of engineer in charge required for proper complection of work including cost of all T&P,Labour etc.
Laying C.C, A-20, M-15 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and hard stone ballast (10-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P, Labour etc.
Centering & Shuttering for C.C work reqired for proper completion of work including cost of all material, labour, T&P etc
Laying C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 10 mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
M-150 brick in 1:4 Cement (OPC 43 Grade) Morter with coarse sand F.M. not less than 2.0 required for proper completion of work including cost of all meterial, T&P, Labour etc.
M-150 brick in 1:3 cement (OPC 43 Grade) on edge lining with coarse sand F.M. not less than 2.0 required for proper completion of work including cost of all meterial, T&P, Labour etc.
Supply and Fixing position of alignment NP3 1200mm dia Hume pipe including cost of pipe and all meterial, T&P, Labour etc. but hume pipe provided by department and deduct the amount of hume pipe.
Struck Deep cement pointing in 1:2 CM with coarse sand cement (OPC 43 grade) for masonary work including cost of all meterial, T&P, Labour etc.
Carriage and laying stone boulder weight 20kg. to 40kg. and minimum dimension size of 200mm for exist canal outer slope protection required for proper completion of work including cost of all materials,labour T&P etc.complete
Dewatering with all cost of power/POL machine, pump well,point system & operate etc.with assembling & dismentling of equipments etc required proper completion of work including cost of all materials, labour T&P etc. complete
E/W in cutting for Making canal section in all type of soil including all lead and lift with proper disposal & manual compaction labour T&P ect
A P CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .