| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹26.5 L+₹82,257.55 (3.20%)Accepted-AOC | L-2 | Accepted-AOC L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹27.4 L
EMD Value
₹2.7 L
Closing Date
21 Jun 2024, 5:00 pmClosed
EE MGCCD10 BSR
EE MGCCD10 BSR
Construction and Demarcation work of Boundry Wall of Lakhavati Colony in Bulandshahr, Lot-1
2024_UPIDC_926155_2
15/EE/2023-24
Open Tender
Civil Works
Item Rate
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹2.7 L
16 Jul 2024
15 Jun 2024
22 Jun 2024
15 Jun 2024
21 Jun 2024
15 Jun 2024
Amount
Boundry Wall Work.
E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the size of foundation for proper completion of work. as per direction of Engineer-in-Charge.
Earth work in embankment by power transported earth with a lead beyond 200 m and upto 1.00 km including excavation loading manual compation dressing and all lift complete excluding royality will be applicble from time to time on Govt orders for proper completion of work. as per direction of Engineer-in-Charge.
Cement Concrete (M-10 Grade )1:3:6 with cement coarse sand & stone aggregte for proper completion of work. as per direction of Engineer-in-Charge.
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc. for proper completion of work. as per direction of Engineer-in-Charge.
Laying RCC 1:1.5:3 using stone grit including cost of all materials, labour, T&p, etc. for proper completion of work. as per direction of Engineer-in-Charge.
Steel Reinforcement for RCC work i/c cost of steel, bending, binding, cutting and placing in proper position etc. for proper completion of work as per direction of Engineer-in-Charge.
Brick work with M-100 Bricks in 1:4 CM mortar including cost of all materials, labour, T&p, etc. for proper completion of work as per direction of Engineer-in-Charge.
Steel Gate and fencing:M.S. or iron work of samll size and section such as holding down bolts, hold fast, tie rods, grating ete. wrought to required from including supply of steel bolts, nuts, wastge etc. and their fixing reuired for proper complition of the work but in heavy size such as trusses, built up gates rerecord racks, roof work, gates etc. including riveting or welding where necessry for proper completion of work as per direction of Engineer-in-Charge.
Laying CC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. for proper completion of work as per direction of Engineer-in-Charge.
Struck deep cement pointing in 1:2 CM on surface including cost of all materials, labour, T&p, etc. for proper completion of work as per direction of Engineer-in-Charge.
Galvanised steel barbed Wire of 9.8 kg per 100 m for proper completion of work as per direction of Engineer-in-Charge.
Providing and fixing of sign board including cost of all materials, labour, t&p etc. for proper completion of work as per direction of Engineer-in-Charge.
RAJ BAHADUR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .