Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.9 L+₹17,255.81 (6.27%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.0 L+₹23,357.87 (8.49%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.0 L+₹23,898.05 (8.69%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.0 L+₹24,008.09 (8.73%)Admitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
5 Jun 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of L/D from H/O chaman Lal towards Guru Nanak High School at Pyt Dhindey Kalan Upper Block Miran Sahib under CDF Year 2026-27
2026_RDPR_310545_1
e-NIT No. 45 REWJ of 2026-27 dated 21-05-2026
Open Tender
Civil Works
Percentage
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹10,000
8 Jun 2026
21 May 2026
6 Jun 2026
21 May 2026
5 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for clearnace of site | 2 | NO | 553 | ₹1,106 |
| 2 | Removal of Unhygiene material from designated sites and its disposal as per directions, all inclusive | 5.95 | cum | 189.2 | ₹1,125.74 |
| 3 | Demolishing cement concrete manually mechanical means including disposal of material 50mtr lead | 8.92 | cum | 1,725.2 | ₹15,388.78 |
| 4 | Dismantaling tile work in floor and roof laid in cement mortar including stacking material within 50mtr lead | 13.59 | cum | 57 | ₹774.63 |
| 5 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 6.23 | cum | 479.3 | ₹2,986.04 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:5:10) grade, with 40mm nominal size of aggregates. Crushed | 15.5 | cum | 4,826.5 | ₹74,810.75 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all works upto plinth level 1:3:6(1 cement 3 coarse sand 6 graded stone agg. 20 mm nominal size) crushed | 21.3 | cum | 5,733.6 | ₹1,22,125.68 |
| 8 | Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete 40mmthick with 20 mm nominal size stone aggregate | 10.22 | sqm | 416.5 | ₹4,256.63 |
| 9 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level (1:2:4) using 20mm aggr. | 0.99 | cum | 7,788.4 | ₹7,710.52 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 79.3 | kg | 123.2 | ₹9,769.76 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1004493.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .