Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 L+₹24,897 (5.05%)Rejected-AOC | ₹5.2 L+₹24,897 (5.05%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R ARUMUGAM L1 | AR CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly etc., complete. | 42 | m3 | 307.99 ₹12,935.41 Lowest | 323.55 ₹13,588.97 |
| 2.01 | Supply of NP-4 class RCC pipes with Sulphate Resistant Cement with inner lining of high alumina cement as per IS:783 with epoxy coating outside of the spigot portion and poly solution coating inside the socket portion, lowering into trenches, laying to proper grade and alignment, cutting the pipes true to axis & jointing the pipes & specials with rubber rings including cost of lubricant, testing the pipe to the required pressure complete as per specifications at different depths. 200mm dia (Upto 2m) | 40 | m | 794.5 ₹31,780.1 Lowest | 834.64 ₹33,385.8 |
| 3.01 | Jointing RCC pipes with cement using necessary collars including the cost of jointing materials 200mm dia R.C.C. Pipes and Specials etc., complete. | 8 | jnt | 370.86 ₹2,966.92 Lowest | 389.6 ₹3,116.82 |
| 4.01 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment 200mm dia R.C.C. Pipes and Specials etc., complete | 40 | m | 58.36 ₹2,334.43 Lowest | 61.31 ₹2,452.38 |
| 5.01 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer. | 80 | m | 57.97 ₹4,637.68 Lowest | 60.9 ₹4,872 |
| 6.01 | Construction of manholes using Sulphate resistant cement at various sepths to invert including earth work excavtion as per SS20B, laying cement concrete in C.M 1:3:6 using 40mm B.G. jelly for foundation ,sinking well kerb below G.L.for 4.5m depth and above,pumping,timbering charges for 2.5m depth and above,stock brick work in C.m. 1:3,for 23cm thick wall and over 23cm thick wall,plastering interior with C.M 1:3,20mm thick and exterior with C.M 1:3,12mm thick,laying plain cement concrete 1:3:6 using 12.0m to 20mm B.G. jelly the frame, providing C.I. steeps,manhole cover and frame etc., complete for the following sizes for eah manhole (As per the type design drawing for manholes). 1.00m Depth | 4 | Nos | 33,776.1 ₹1,35,104.41 Lowest | 35,482.65 ₹1,41,930.6 |
| 7.01 | 1.50m Depth | 3 | Nos | 40,983.5 ₹1,22,950.49 Lowest | 43,054.2 ₹1,29,162.6 |
| 8.01 | 2.00m Depth | 1 | No | 48,190.89 ₹48,190.89 Lowest | 50,625.75 ₹50,625.75 |
| 9.01 | Dewatering using 3HP to 70HP disal engine pumpset including Hire charges ,cost of Diesel,Engine Oil,Pump operator,labour charge,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc.,complete. TWAD pg.no-321 | 8 | Hrs | 281.19 ₹2,249.51 Lowest | 295.4 ₹2,363.17 |
| 10.01 | Replacement of underground utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork in all soil strata,including BT/CC road cutting ,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes,coupler,union,jointing materials and required specials,cutting ,threading,conveying,laying,jointing and cost of refilling for the additional earthwork etc complete and as directed by thedepartmental officers.Pg no- 340 | 3 | m | 846.46 ₹2,539.37 Lowest | 889.22 ₹2,667.67 |
Tender Value
₹4.9 L
EMD Value
₹4,930
Closing Date
4 Jun 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of Manhole and Sewer Line Arrangements in Vathal Company st, KTK Thangamani 6th Street and Balamurugan Kovil cross st in Ward No. 22
2025_MAWS_560160_1
E3 / EST- 399 / 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,930
8 Jul 2026
22 May 2025
4 Jun 2025
22 May 2025
4 Jun 2025
22 May 2025
Amount
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly etc., complete.
Supply of NP-4 class RCC pipes with Sulphate Resistant Cement with inner lining of high alumina cement as per IS:783 with epoxy coating outside of the spigot portion and poly solution coating inside the socket portion, lowering into trenches, laying to proper grade and alignment, cutting the pipes true to axis & jointing the pipes & specials with rubber rings including cost of lubricant, testing the pipe to the required pressure complete as per specifications at different depths. 200mm dia (Upto 2m)
Jointing RCC pipes with cement using necessary collars including the cost of jointing materials 200mm dia R.C.C. Pipes and Specials etc., complete.
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment 200mm dia R.C.C. Pipes and Specials etc., complete
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer.
Construction of manholes using Sulphate resistant cement at various sepths to invert including earth work excavtion as per SS20B, laying cement concrete in C.M 1:3:6 using 40mm B.G. jelly for foundation ,sinking well kerb below G.L.for 4.5m depth and above,pumping,timbering charges for 2.5m depth and above,stock brick work in C.m. 1:3,for 23cm thick wall and over 23cm thick wall,plastering interior with C.M 1:3,20mm thick and exterior with C.M 1:3,12mm thick,laying plain cement concrete 1:3:6 using 12.0m to 20mm B.G. jelly the frame, providing C.I. steeps,manhole cover and frame etc., complete for the following sizes for eah manhole (As per the type design drawing for manholes). 1.00m Depth
1.50m Depth
2.00m Depth
Dewatering using 3HP to 70HP disal engine pumpset including Hire charges ,cost of Diesel,Engine Oil,Pump operator,labour charge,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc.,complete. TWAD pg.no-321
Replacement of underground utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork in all soil strata,including BT/CC road cutting ,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes,coupler,union,jointing materials and required specials,cutting ,threading,conveying,laying,jointing and cost of refilling for the additional earthwork etc complete and as directed by thedepartmental officers.Pg no- 340
Refilling gallery trench and filter basins with clean excavater sand free from silt and clay etc., complete.
Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete.
Raising the existing circular manholes in heavy type including removing the existing manhoke cover with frame by dismantlimg the existing cement concrete and tar road surface alround the manhole raising the manhole with cement concrete 1:2:4 (one cement two and four aggregate ) 25cm height including centering insid the manhole raising, laying 15cm tick cement 1:2:4 with 20mm granite chips including finishing the top surface of manhole Alround etc., complete
Add GST 18%
AR CONSTRUCTIONS (BID ID -1358181)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .