Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹32.9 L+₹1.8 L (5.63%)Admitted-Finance SUBASHGRAM DIGLIPUR | L2 | Admitted-Finance | |
| 3 | L3₹34.9 L+₹3.8 L (12.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Technical bid is rejected due to in affidavit written APWD instead of PRI, N&MA, hence not accecpted. |
| Sl No | Description | Qty | Unit | KARTICK BAROI L3 | SHRI. BINOY SARKAR L1 | P L PALANIVELU L2 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil | 73.53 | cum | 250 ₹18,383.5 Lowest | 280 ₹20,589.52 | 400 ₹29,413.6 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
| 2.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 27.31 | cum | 9,000 ₹2,45,808 | 8,500 ₹2,32,152 Lowest | 8,800 ₹2,40,345.6 |
| 2.02 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.59 | cum | 11,100 ₹95,349 | 10,500 ₹90,195 Lowest | 12,900 ₹1,10,811 |
| 3.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.74 | cum | 14,300 ₹2,53,667.7 | 13,160 ₹2,33,445.24 Lowest | 13,500 ₹2,39,476.5 |
| 4.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | ||||||
| 4.01 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.7 | cum | 14,400 ₹96,422.4 | 13,160 ₹88,119.36 Lowest | 14,200 ₹95,083.2 |
| 5.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 9.02 | cum | 14,450 ₹1,30,281.2 | 13,160 ₹1,18,650.56 Lowest | 14,200 ₹1,28,027.2 |
Tender Value
₹43.5 L
EMD Value
₹87,061
Closing Date
6 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PRI NMA Mayabunder
Office of Executive Engineer PRI NMA Mayabunder
Construction of Open Shed attached with Community Hall at Mailangram w/no-I under Gram Panchayat, Laxmipur.
2026_RDPRI_25588_1
99/EE/PRI/NMA/MB/26-2027
Open Tender
Civil Works - Buildings
Works
180 days
Laxmipur
Refer Tender Document
5 documents required · 5 mandatory
₹500
Executive Engineer PRI NMA Mayabunder
₹87,061
9 Nov 2026
31 Oct 2026
6 Nov 2026
31 Oct 2026
6 Nov 2026
31 Oct 2026
75 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 73.53 | cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 27.31 | cum | - | - |
| 2.02 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.59 | cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.74 | cum | - | - |
| 4Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 4.01 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.7 | cum | - | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 9.02 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
NIT99GPLaxmipur.pdf
Tender Documents • 3.19 MB
BOQ_27093.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .