Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC FATEHABAD | L1 | Accepted-AOC L1 | |
| 2 | L2₹36.2 L+₹1.5 L (4.47%)Rejected-Finance | L2 | Rejected-Finance EMD release |
Tender Value
₹32.7 L
EMD Value
₹66,000
Closing Date
13 Oct 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Provl. Divn. PWD B and R Br., Hansi
Restoration of road cut on Barwala Daulatpur Uklana road in km 16.20 to 17.05 and 17.428 to 17.600 in Hisar Distt (Road ID 5130)
2020_HRY_145028_1
Restoration of road cut on Barwala Daulatpur Uklan
Open Tender
Civil Works
Item Wise
90 days
Hansi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
E.E. Provl. Divn. PWD B and R Br., Hansi
₹66,000
Yes
21 May 2021
19 Sept 2020
13 Oct 2020
19 Sept 2020
13 Oct 2020
19 Sept 2020
120 days
Amount
Earth work in excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 meters, and an average vertical lift upto 0.5 meter including breaking of clods. Excavated earth may be reused on berms and disposed off surplus earth with all lead and lift including dressing complete in territorial as per direction of Engineer-in-charge will be incidental to work anq nothing will be paid. (NS)
Construction of sub grade upto 500 mm in reconstruction portion (2.75 m wide) at RD 16.20 to 17.05 & 17.428 to 17.600 km with soil of minimum CBR 8 % (4 days soaked) of obtained from borrow area with any lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by engineer the quantity of earth work calculated with NSL and finished level found to be less than the actual quantity (less than 1405.25 cum) will be paid. In case quantity worked out is more than 1405.25 cum, then only 1405.25 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached section-9 of DNIT.
Providing and laying 100mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer
Providing and laying 100 mm thick granular S Lib base consisting of drainage layer confirming to Table 400.1 Grading -III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.0nly crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing; shall be approved by the engineer.
Providing and laying 75mm thick (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam in layer of 75m in each using screening type 'B' compacting with 3 wheeled Teel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1.0nly crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying 75 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.0nly crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and applying primer coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and Laying 50 mm thick Compacted bituminous macadam (BM) in one layer by drum type hot mix plant and paver finisher with sensor control to the required grade as per clause No. 504 table No. 500-4 of MoRT&H specification for road and bridge works (5th Revision) of 2013 using minimum 3.4 % bitumen grade VG-30 as binder content by weight of total mix, complete in all respects i/c cost of bitumen, instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required is this account more than 3.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note:- Before carrying out BM, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPA and tandem rollers to achieve the desired compaction as per clause No. 507 MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note:- Before carrying out BC, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is only bituminous layer on existing blakhk top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and marking centre line / zebra crossing 2.5 thick (minimum) with hot applied thermoplastic road marking paint 10 Cms wide / 15cm wide complete in all respects such as furnishing all labour, materials, tools, equipments including all incidental costs necessary for carrying out in work at site conforming to the technical specification as clause No. 803 of MORT&H specification for road 8& bridge works (5th revision) of 2013 latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/berger-signarc/prismo. The glass beads shall be of pottersisovietec/fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specification. The reflectrozing glass beads shll meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads. The method of thickness measurement shall be in accordance with appendix B and C of BS 3262 (Part-3)]. Note: Before start of work the contractor shall give brand, batch no. manufacturing date of the material to be used.
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -5. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
SHERSINGHANDCOMP.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .