| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.6 L+₹15,975.05 (1.19%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Shree Siddhbali Construction L1 | TEJVEER SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches | 350 | Cum | 80 ₹28,000 Lowest | 125 ₹43,750 |
| 2.00 | Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. | 56 | Sqm | 499 ₹27,944 Lowest | 600 ₹33,600 |
| 3.00 | Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete. | 42 | Sqm | 580 ₹24,360 Lowest | 600 ₹25,200 |
| 4.00 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete. | 18 | Cum | 7,200 ₹1,29,600 Lowest | 7,499 ₹1,34,982 |
| 5.00 | Ist Class Brick work in 1:4 cement and sand mortar i/c all cost material, labour T&P etc complete. | 60 | Cum | 6,700 ₹4,02,000 Lowest | 7,199 ₹4,31,940 |
| 6.00 | C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete. | 2 | Cum | 7,400 ₹14,800 Lowest | 7,499 ₹14,998 |
| 7.00 | C.C. 1:6:12 filling in gaps between abutment and wing wall. Including cost of all Materials, Labour, T&P. etc. Complete. | 4.5 | Cum | 7,000 ₹31,500 Lowest | 7,499 ₹33,745.5 |
| 8.00 | R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work. | 14 | Cum | 7,400 ₹1,03,600 Lowest | 7,499 ₹1,04,986 |
| 9.00 | Supply & placing Tarfet bearing for slab i/c cost of all maerial, labour T&P etc complete. | 3.75 | sqm | 250 ₹937.5 Lowest | 1,249 ₹4,683.75 |
| 10.00 | Supplying and fixing Ange iron 65x65x6 mm for Expention joint including cost of a material T&P etc complete. | 0.11 | M.T. | 73,000 ₹8,030 Lowest | 73,500 ₹8,085 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
14 May 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER MGCCD6,MEERUT
01/EE/2025-26(LOT3)
2025_UPIDC_1036506_3
01/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.4 L
17 Sept 2025
6 May 2025
14 May 2025
6 May 2025
14 May 2025
6 May 2025
Amount
Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches
Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete.
Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete.
C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete.
Ist Class Brick work in 1:4 cement and sand mortar i/c all cost material, labour T&P etc complete.
C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete.
C.C. 1:6:12 filling in gaps between abutment and wing wall. Including cost of all Materials, Labour, T&P. etc. Complete.
R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work.
Supply & placing Tarfet bearing for slab i/c cost of all maerial, labour T&P etc complete.
Supplying and fixing Ange iron 65x65x6 mm for Expention joint including cost of a material T&P etc complete.
R.C.C. (M-30 grade) In wearing coat etc.Including cost of all materials, labour and T&P etc. all completion of work.
Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete.
Supplying and Fixing 100 MM dia 0.60 M Length G.I Pipe in draining Spoit I/C Cost of all Materials , labour, T&P etc. required for proper complition of work.
Making Expension joint with thermocol including all cost of all labour and T&P etc. complete as directed by Engineer-in-charge.
Supplying and Fixing Wheel guard of size 150x150x900mm I/C Cost of all Materials , labour, T&P etc. Complete.
Struck deep cement pointing in 1:2 C.M /Sqm including cost of all material & required for completion of work as directed by Engineer-in-charge.
Laying Non cohesive/Cohesion less (ordanary sand) back filling adjoing the RCC structure. including cost of all labour and T&P.etc. complete.
Earth work in filling for making road and lifiting the level of road to vrb level upto 1.00 km by power transport i/c cost of all materials, labour, T&P etc. required for proper completion of work.
Supply and Laying of R.B.M in approch slab and approach road. i/c cost of all materials, labour, T&P etc. required for proper completion of work.
Providing & Laying brick on eadge soling on diversion and aproch road etc. including cost of material, labour and T&P etc. complete.
Making and fixing sign board (1.50MX1.00M) at site of work and including cost of all labour and T&P.etc. complete
TEJVEER SINGH (BID ID -5182277)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .