| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC Quoted Less Percentage |
| 2 | L2₹2.1 CrRejected-AOC EAST CROSS STREET AT 67 M LENGTH IN VEERAGANU VEERAGANUR TOWN PANCHAYAT SALEM DISTRICT | ₹2.1 Cr | L2 | Rejected-AOC Quoted Above Percentage |
| 3 | L3₹2.1 CrRejected-AOC 727 EAST KATTU KOTTAI NADUVALUR POST GANGAVALLI TK SALEM DT | ₹2.1 Cr | L3 | Rejected-AOC Quoted Above Percentage |
| Rank | Bidder | Quote | Total Amount |
|---|---|---|---|
| L3 | A.R.Constructions Bid ID 1589302 | 2% above | ₹2,08,03,942 |
| L1 | KULLATHAMBI KARUPPAYI Bid ID 1588700 | 0.01% below | ₹2,03,94,185 |
| L2 | SRI AMMAN CONSTRUCTIONS Bid ID 1589938 | 1.17% above | ₹2,06,34,655 |
Tender Value
₹2.0 Cr
EMD Value
₹1.1 L
Closing Date
7 Feb 2026, 11:00 amClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem Steel Plant Main Road, Jagir Ammapalayam, Salem
Widening from Single Lane to Intermediate Lane and Strengthening at Km 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6 (SLM-129)
2026_HWAY_645462_1
52 / 2025-2026 / HDO, Dated. 19.01.2026-1
Open Tender
Civil Works - Roads
90 days
Salem
Refer Tender Document
3 documents required · 3 mandatory
₹0
₹1.1 L
19 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of cut earth away from the site with average lead as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision etc complete. For Boxing
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision etc., complete - for Grading- V Material
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision etc., complete - for Grading- III Material
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed material by tipper to site, laying in uniform layers with pavers in SubBase /Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision - over WMM/ WBM
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., completeas per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Advance patch work 50 mm thick using 45mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 kg per cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying 75 mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm, 0.35cum of 13.20- 2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate and mixing them in the required temperature in central hot mix plant 20 – 30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 75 mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per MoRTH specification clause No.111,112,501,505 & 900 - Grade-I
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00 - 9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mixplant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMPas per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for making up berms using cut earth (Labour and Hire Charges Only)
Widening from Single Lane to Intermediate Lane and Strengthening at Km. 3/0 - 5/8 of Thalaivasal -Veeraganur Road to Punalvasal Road including Reconstruction of culvert at 4/6
Dismantling Culverts, bridges and other structures, Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Plain Cement Concrete
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Earthwork excavation in all classes of soils except hard rock requiring blasting anddepositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of body wall and pipes as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Vibrated Cement Concrete of grade M15 grade mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying withrequired standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for levelling course below body wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall. as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification. as per clause 1013,2900 & 2911 of MORTH Vth Revision
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Laying and fixing of 1000 mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes as per clause 2905 & 2906 of MORTH Vth Revision
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Stone dust filling including cost and conveyance of Stone dust to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.
Reconstruction of culvert at 4/6 of Thalaivasal -Veeraganur Road to Punalvasal Road
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
Total Value put to Tender
Negotiated Percentage
Final Negotiated Value
Add GST at 18% of Final Negotiated Value
Total Value of Contract Including 18% of GST
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
PQAttur129.pdf
Tender Documents • 0.63 MB
BidAttur129.pdf
Additional Documents • 0.61 MB
BOQ_773517.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid