Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹87,812
Closing Date
8 Apr 2026, 3:00 pmClosed
EE(ALHW),ALHW, Sri Vijaya Puram
O/o Deputy Chief Engineer(Andaman),ALHW, Sri Vijaya Puram
Construction of compound wall,cum drain, PVC coated fencing and RCC retaining wall including attending repairs to the existing compound wall of Sea Port Terminal at Swaraj Dweep
2026_ALHW_904447_1
Construction of compound wall,cum drain, PVC coated fencing and RCC retaining wall including attend
Open Tender
Civil Works
Item Rate
45 days
Swaraj Dweep, Haveklock Island
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹87,812
3 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
8 Apr 2026
3 Apr 2026
3 Apr 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule-I
Construction of Compound wall cum drain for Sea Port Terminal building at Swaraj Dweep. | - | - | - | - |
| 2 | Demolishing R.C.C work manually by meachanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. including cost of all labour charges, minor tools, GST, Cess etc., Complete. | - | Cum | - | - |
| 3 | Removing / scrapping dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches including cost of sand paper including cost of all labour charges, minor tools, GST, Cess etc., Complete. | - | Sqm | - | - |
| 4 | Conveying the sweepage, debris, broken concrete, ship/ workshop rubbish wastage etc from the work site and transporation of the same by truck with in a lead of 10 Km and disposal of the same out side the dumping area, including all labour charges, hire charges of truck with POL and operator, minor tools, GST, Cess etc., Complete. | - | Cum | - | - |
| 5 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismenbering and stacking within 50 metres lead. | - | Kg | - | - |
| 6 | Earth work excavation in foundation trenches in all kind of soil lead up to 100 Mtrs and lift upto 1.50 Mtrs including stacking the excavated earth not more than 3 M from the edge of excavation and then returning the stacked soil in 15 cm layers when required in Plinths and sides of the foundation etc. consolidating each deposited layers by watering, ramming and the disposing of all surplus excavated soil with in a lead of 30 Mtrs., as directed by the Engineer In Charge, including cost of all labour charges, minor tools, GST, Cess etc., Complete. | - | Cum | - | - |
| 7 | Providing and laying concrete of PCC 1:3:6 for foundation concrete using 40mm stone metal but including cost of cement, stone aggregates and Pulverized stone sand from the approved quarry at Sri Vijaya Puram, all labour charges, mixing, conveying, placing, consolidation of concrete, screening and washing of stones chips and Pulverized stone sand, transportation charges of all materials to the worksite, hire charges and running charges of mixer machine, vibrator and all other equipments, labour charges, minor tools, GST, Cess etc., Complete. | - | Cum | - | - |
| 8 | Providing and laying RCC M20 (1:1.5:3 one cement, one and half paulvarised sand & three stone chips) using 20mm graded stone chips from Sri Vijayapurm quarry, 43 grade ordinary portland cement for cast-in- situ concrete and as directed by the EIC, inculding cost of cement, cost of stone chips and pulverised stone sand from sri vijayapuram quarry, all labour charges for mixing conveying placing consolidation screeing and washing of stones chips and sand transportation charges of all materails to work site and running charges of concrete mixer, vibrator, consumables and all other required materials, cost of minor tools and plant, GST, Cess etc., Complete. (But excluding cost of shuttering which will be paid separately) | - | Cum | - | - |
| 9 | Fabrication, transporting and placing in position of reinforcement for all RCC works as per the direction of EIC including cost of steel, transportation of all materials to worksite, cost of all handling, cutting, bending, tying in position wherever necessary with black 18SWG annealed binding wire and welding the main rods at all the joints of inside rings as per the filed requirements, cost of welding rods, binding wires, hire charges of welding machine, all labour charges, minor tools, GST, Cess etc., Complete. | - | Qtl | - | - |
| 10 | Steel centering and shuttering including strutting, propping etc., and removal of formwork for foundation footing etc.,specified concrete work after the specified time limit as directed by the EIC , including cost of all labour charges and transportation charges of all materials to work site and cvost of minor tools etc complete. | - | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_950654.xls
BOQ • 0.29 MB
Scan0101.pdf
Tender Documents • 9.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .