| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.5 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹36.1 L+₹11.6 L (47.1%)Rejected-Finance TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | 2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | 3₹37.9 L+₹13.4 L (54.5%)Rejected-Finance | 3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | 4₹42.5 L+₹18.0 L (73.3%)Rejected-Finance 1506 HEMKUNT TOWER 98 NEHRU PLACE NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | 4 | Rejected-Finance 4th Lowest Bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically disquallified |
Tender Value
₹39.8 L
EMD Value
₹79,644
Closing Date
17 Aug 2023, 5:00 pmClosed
Executive Engineer
DLCSUPVA
Shifting and repairing of 164 KWp Solar installed at rooftop of various Departments of DLCSUPVA, Rohtak
2023_HRY_300941_1
2023/Solar2ndCall
Open Tender
Solar Power Plants
Tender
60 days
DLCSUPVA
Shifting and repairing of 164 KWp Solar installed at rooftop of various Departments of DLCSUPVA, Rohtak
2 documents required · 2 mandatory
₹5,000
Yes
₹79,644
Yes
16 Dec 2023
2 Aug 2023
18 Aug 2023
2 Aug 2023
17 Aug 2023
2 Aug 2023
Amount
Supply and installation of Solar on Grid Inverter 100 KW complete in all respect Make- SMA, ABB, Delta, AEG, Siemens, GE, Schneider, Havells with 10 years warranty.
Supply and installation of DCDB with Fuse complete in all respect Make- Havells, Schneider, C&S, ABB, L&T complete in all respect as per Grid capacity. The Distribution Box should be water proof. Strips/Contacts/Bus Bar in distribution box should be Copper.
Supply and installation of AC Distribution Box Suitable for Three Phase Inverter (Incoming MCCB and Outgoing ACB with SPD)-IP54 Make- Havells, Schneider, C&S, ABB, L&T complete in all respect. The Distribution Box should be water proof. Strips/Contacts/Bus Bar in distribution box should be Copper.
Supply and installation of Structure and Civil foundation of Each pillar with Fastener grouting (GI 2 mm with Z Clamp U Clamp) complete in all respect. (Steel Make- TATA, Jindal, SAIL, RINL). All the fastener and steel material should be Hot Dip Galvanized)
Supply and installation of LA (EAC) complete in all respect.
Supply and installation of Wires Copper DC Cable 4 Sqmm, 100 Sqmm AC Cable (Aluminum) for each Inverter to LT Panel complete in all respect. Cable Make- Polycab, RR Kabel, Havells, KEI Cable Tray- RM Con, BEC, MEM, Alotco, Apex, Venus Thimbles:- Dowells, Jainsons, Raychem
Supply and installation of Plumbing work for washing of Solar Panel complete in all respect. Make of CPVC Pipe- Astral, Prince, Supreme.
Supply and installation of Chemical Earthing complete in all respect. The strip used for earthing should be copper material.
Dismantling and Shifting of existing Solar Modules complete in all respect.
OM SOLAR SOLUTIONS
ARYA ELECTRIC COMPANY
HFM Solar Power Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .