| Sl No | Description | Qty | Unit | M/s Aghoreshwar Kripa Construction Co. L1 | M/S SMM INFRATECH PVT Ltd L2 |
|---|---|---|---|---|---|
| 1.00Supply of following materials:- installation of LA's in 33 KV Bijpur line & earthing of LAs on every 8-9 pole between Nadhira & Bijpur S/S, Sonbhadra due to heavy lightening area for reliable supply works site as per RESSPO norms. (Provided by Contractor) | |||||
| 1.01 | Bolts, Nuts & Washers | 10 | Kg. | 150.5 ₹1,505 Lowest | 180 ₹1,800 |
| 1.02 | F-bracket for 33 KV | 12 | No. | 507 ₹6,084 | 400 ₹4,800 Lowest |
| 2.00Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) | |||||
| 2.01 | ACSR Dog conductor | 120 | Mtr | 500 ₹60,000 | 5 ₹600 Lowest |
| 2.02 | Polymeric 33 kv Pin insulater | 12 | No. | 50 ₹600 | 15 ₹180 Lowest |
| 2.03 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. | 88 | No. | 50 ₹4,400 | 20 ₹1,760 Lowest |
| 2.04 | GI Wire 6 SWG and 10 SWG | 450 | Kg. | 1 ₹450 Lowest | 5 ₹2,250 |
| 2.05 | 33 KV L.A. | 88 | No | 20 ₹1,760 Lowest | 20 ₹1,760 Lowest |
| 3.00ERECTION OF WORK | |||||
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
10 Jun 2026, 2:00 pmClosed
Superintending Engineer Electricity Work Circle,
Superintending Engineer Electricity Work Circle, Fataha, Mirzapur
installation of LAs in 33 KV Bijpur line and earthing of LAs on every 8 to 9 pole between Nadhira and Bijpur Sub Station Sonbhadra due to heavy lightening area for reliable supply
2026_PVVNV_1154750_1
07/EWC(M)/2026-27
Open Tender
Electrical Works
Lump-sum
60 days
Superintending Engineer Electricity Work Circle, F
Please Refer Tender Document
2 documents required · 2 mandatory
₹1,180
Superintending Engineer Electricity Work Circle
₹1,000
20 Jun 2026
27 May 2026
11 Jun 2026
27 May 2026
10 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of following materials:- installation of LA's in 33 KV Bijpur line & earthing of LAs on every 8-9 pole between Nadhira & Bijpur S/S, Sonbhadra due to heavy lightening area for reliable supply works site as per RESSPO norms. (Provided by Contractor) | |||||
| 1.01 | Bolts, Nuts & Washers | 10 | Kg. | - | - |
| 1.02 | F-bracket for 33 KV | 12 | No. | - | - |
| 2Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) | |||||
| 2.01 | ACSR Dog conductor | 120 | Mtr | - | - |
| 2.02 | Polymeric 33 kv Pin insulater | 12 | No. | - | - |
| 2.03 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. | 88 | No. | - | - |
| 2.04 | GI Wire 6 SWG and 10 SWG | 450 | Kg. | - | - |
| 2.05 | 33 KV L.A. | 88 | No | - | - |
| 3ERECTION OF WORK | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
TenderDocument.pdf
Tender Documents • 0.89 MB
BOQ_2163037.xls
BOQ • 0.24 MB
corrigendum105.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .