| 1 | L1₹47.8 LAccepted-AOC | ₹47.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹50.0 L+₹2.1 L (4.48%)Rejected-AOC | ₹50.0 L+₹2.1 L (4.48%) | L2 | Rejected-AOC L2 |
Tender Value
₹47.8 L
EMD Value
₹47,828
Closing Date
28 Feb 2024, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar anna maligai
Providing New Steps Arrangements at Vaigai North and Vaigai South for Purpose of Chitra Festival Ward No 29
2024_MAWS_428808_1
E6 /Est.No. 403 NNT /23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹47,828
11 Mar 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
Amount
Dismantling Clearing Away Stacking Material Use ful for ReUsethe Damaged Existing RCC Concrete
Providing 0.46m pile driven and then by using casing pipe 0.30m (MS Casing Pipe for One Use) RCC pile using M20 concrete exculding steel reinforcement of Grade Fe 415 (Including charges for Crane in the use of Casing pipe Removing Works) and all other Labour Crane Rent and Fuel ect completed
Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification.
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid. (For Plinth Beam)
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid for Vertical Portion
Supplying, erecting STEEL CENTERING for sides and soffits inc supports and strutting for plain surface such an reinforced cement concrete slasp rectangualar beams tee or el beams lintels , bed blocks staircase in all floors of any height (the retrived materials should be taken back by the contractor) the payment for cenetering shall be given by the concrete is laid (bottom only)
Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Supplying and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors
Plastering with cement mortar 1:3,10 mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat,including thorough crapping,clean removal of dirt, etc completeand including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plain Cement Concrete1:5:10 (one cement, five fine aggregates and ten coarse aggregates) using 40mm size ISSHBG metal including cost and conveyance ofall materials to site and including for the mixing, laying and labourcharges etc., complete as per standard specification.
PlainCement Concrete1:2:4 (one cement, two fine aggregate sand four coarse aggregates) using 20mm size ISSHBG metal including cost and conveyance ofall materials to site and including for the mixing, laying and labour charges etc.,complete as per standard specification
Add GST 18%
OM VINAYAGA CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .