Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
15 Jul 2026, 2:00 pm6d left
Chief Engineer / Udangudi STPP-I.
Chief Engineer / Udangudi STPP-I.
Sweeping and mopping of floor area and maintaining the toilets in neat and hygienic condition in Non-Plant buildings, AHP MCC buildings, CHP MCC Buildings, Water Treatment plant
2026_EB_683356_1
CE/SE/C/USTPP-I/C-02 /2026-27
Open Tender
Civil Works - Others
260 days
KALLAMOZHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.9 L
2 Jul 2026
2 Jul 2026
16 Jul 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing light jungle and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete. | 89,163 | Sqm | 7 | ₹6,24,141 |
| 2Sweeping and cleaning of all the floor areas in all building including collection of debris, garbage, fly ash, tea cups, paper waste and other litters etc., disposing the same in to nearby dustbins in all working days , as instructed by engineer incharge.The rate including cost of all labour , lead, lift, broom sticks, gunny bags , safety tools, and appliances etc., complete. | |||||
| 2.01 | Plant and Onshore area | 1,27,85,740 | Sqm | 0.83 | ₹1,06,12,164.2 |
| 2.02 | Offshore Area - Coal Jetty | 2,79,188 | Sqm | 1.26 | ₹3,51,776.88 |
| 3Mopping and cleaning of floor area for all buildings including cost of all materials required for mopping and cleaning materials, Tools and plants, Charges and safety appliances etc., complete | |||||
| 3.01 | Plant and Onshore area | 43,04,809 | Sqm | 1.59 | ₹68,44,646.31 |
| 3.02 | Offshore Area - Coal Jetty | 1,61,900 | Sqm | 2 | ₹3,23,800 |
| 4 | Cleaning and clearing of debris and fly ash from roof top and gutter at various elevations and bring down to '0'mtr level with an average lead of 200mtrs and disposing the same 1km away from the site as instructed by the Engineer at site, rate including cost of labour, lead, lift, safety appliances, gunny bags, transporting by tractor, loading & unloading etc, complete. | 2,86,664 | Sqm | 2.39 | ₹6,85,126.96 |
| 5Charges for cleaning of toilets including of water closets, urinals, wash basins floor adjacent pathways and bath rooms rate including cost of broom sticks, brush, buckets, labour, lead, lift, safety appliances, cleaning agents such as bleaching powder etc., disposing of food waste from various floor etc. complete. | |||||
| 5.01 | Small Toilets of floor area not more that 10m2 at plant and On shore area | 25,793 | Opn | 41 | ₹10,57,513 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Specification.pdf
Tender Documents • 0.93 MB
BOQ_821423.xls
BOQ • 0.43 MB
C02BQR.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid