| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | -7.56% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 CrAdmitted-Finance | -1.50% | ₹1.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.9 CrAdmitted-Finance | +0.00% | ₹1.9 Cr | L3 | Admitted-Finance |
Updated dates
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
25 Apr 2026, 2:00 pmClosed
AREA MANAGER UPSIC MORADABAD
AREA MANAGER UPSIC MORADABAD
Construction of Proposed Area Office Bareilly Building at Industrial Estate Parsakhera District Bareilly
2026_MSME_1135794_1
70/UPSIC/MOR/2026-27
Open Tender
Civil Works
120 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,602
AREA MANAGER UPSIC MORADABAD
₹1.9 L
18 May 2026
10 Apr 2026
25 Apr 2026
10 Apr 2026
25 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 124.34 | CUM | 200.74 | ₹24,960.01 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 87.04 | CUM | 151.6 | ₹13,195.87 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 174.55 | CUM | 540.23 | ₹94,297.15 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 24.84 | CUM | 5,253.42 | ₹1,30,494.95 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 18.3 | CUM | 1,637.84 | ₹29,972.47 |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement:2 coarse sand) to match the existing floor.With Chlorpyriphos/ Linadane E.C. 20% with 1% concentration. | 183 | SQM | 239.11 | ₹43,757.13 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of
Concrete of M25 grade with minimum cement content of 330 kg /cum | - | - | - | - |
| 8 | All works above plinth level upto floor V level | 0.5 | CUM | 7,604.35 | ₹3,802.18 |
| 9 | Slab-All works above plinth level upto floor V level | 57.57 | CUM | 7,604.35 | ₹4,37,782.43 |
| 10 | All works upto plinth level (BEAM) | 7.3 | CUM | 7,330.07 | ₹53,509.51 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
01.pdf
Additional Documents • 1.41 MB
BOQ_2120592.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid