Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L1 | Accepted-AOC Lowest Tender Accepted |
| 2 | L2₹4.3 Cr+₹10.4 L (2.50%)Rejected-AOC | ₹4.3 Cr+₹10.4 L (2.50%) | L2 | Rejected-AOC Highest Tender Rejected |
Tender Value
₹4.9 Cr
EMD Value
₹4.9 L
Closing Date
6 Feb 2024, 3:00 pmClosed
The Deputy Director
O/O the Deputy Director, 365/1, Meenkarai Road, Anamalai Tiger Reserve, Pollchi
Improvement of Elephant Camp at Kozhikamuthy in Ulandy Range
2024_TNFD_416143_1
4744/2023/D
Open Tender
Civil Works
Item Rate
150 days
Kozhikamuthy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4.9 L
5 Mar 2024
31 Jan 2024
7 Feb 2024
1 Feb 2024
6 Feb 2024
1 Feb 2024
1 Feb 2024 - 5 Feb 2024
Amount
Improvement of Krall in Kozhikamuthi Camp in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24. (1)
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls (Brick / Stone Masonry in cement mortar walls under 3m high)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
FOR CONSTRUCTION OF TRUCK TRANSPORTING RAMP AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (2)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Filling with River Sand (full) complying with standard specification for filling in foundation and basement
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
White washing two coat using best freshly burnt white shell lime in all floors including cost of lime and other materials
Colour washing with supercem
for construction of shelter for elephant trevis in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (3)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
FOR CONSTRUCTION OF VETERINARY ROOM AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24 (4)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
White washing two coat using best freshly burnt white shell lime in all floors including cost of lime and other materials
Colour washing with supercem
Supplying and fixing Galvalume Colour Sheet of size 0.47mm thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed.
Continer size of 20 feet including material and Labour charges.,
Refrigerator including material and Labour charges.,
FOR CONSTRUCTION OF FORESTER AND GUARD ROOM AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24 (5)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
White washing two coat using best freshly burnt white shell lime in all floors including cost of lime and other materials
Colour washing with supercem
Supplying and fixing Galvalume Colour Sheet of size 0.47mm thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed.
Continer size of 20 feet including material and Labour charges.,
FOR CONSTRUCTION OF ELEPHANT INFORMATION CENTRE KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24 (6)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Supplying and fixing in position of best approved quality for natural stone piller size of 1.2m x 0.45m x 1.8m ht including material and Labour charges.,
FOR CONSTRUCTION OF ADVANCED MEDICINE STORE ROOM AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24 (7)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
White washing two coat using best freshly burnt white shell lime in all floors including cost of lime and other materials
Colour washing with supercem
Supplying and fixing Galvalume Colour Sheet of size 0.47mm thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed.
Continer size of 20 feet including material and Labour charges.,
Laboratory Refrigerator Brand Name - Saiclave- Model NoSAI/LR-500 -220 VAC including material and Labour charges.,
FOR CONSTRUCTION VIEW GALARY AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24.(8)
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls (Brick / Stone Masonry in cement mortar walls under 3m high)
Dismantling, clearing away and carefully stacking materials useful for re-use for any Corrugated Iron Sheet Roofing and steel pipes
Filling in Foundation and basement with Excavated earth in layers of more than 150 thick
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Flooring with Vitrified tiles with approved colour and quality over C.M 1:3 as per standard specification.
Suppling and fixing of polished Rajasthan kota slabs of 20mm thick with machine cut edges
White washing two coat using best freshly burnt white shell lime in all floors including cost of lime and other materials
Colour washing with supercem
Wiring with 2 x 1.5Sqmm PVC insulated SC unsheathed Cu.Conductor lof 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A F.T switch and making good of the concealed portion with suitable colour for PVC concealed light/Fan point (for electronic regulator)
Supplying and fixing of Steel Post size of 100mm X 100 mm Square section 4 mm thick including fixing, fitting and labour charges etc, Complete.
Supplying and fixing Galvalume Colour Sheet of size 0.47mm thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed.
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete
Providing steel staircase with Handrail including Poles all material and Labour charges etc.,
Dismantling, Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs
Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug.
Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter Solid panel PVC door with frame of size 0.91m x 2.10m
UPVC Window- 1.83 m x 1.22 m Specification: Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded andcleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
Providing Granite name board including material and labour charges.,
FOR CONSTRUCTION OF MAJOR CHECK DAM AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023 -2024.(9)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B a) Foundation of weir
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supply and Erection CENTERING CHARGE
supplying and abricaton and placing in position mild steel grills or reinorcement including cost o steel or all works. The rate to including cost of binding wire also -1Kg SI No 134)
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
FOR PROVIDING BASIC INFRA STRUCTURES REQUIRED FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (10)
Laptop (13th Gen intel@core i5-1335U,(intel@iri Xe Graphics-32 GB ram,LPDDR5-400MT/s-512GB-M.2-Pcle NVMe-ssd35.5cm-Display full HD+(1920x1200)-1 TB SSD , Dongle.
All in one desktop(HP) and accessories( Make -HP, All-in-one PC 13th Gen intel core i7 27" or 60.5cm Full HD 8GB RAM,512 SSD ,intel UMAGraphics, Wireless keyboard and mouse,pen drive 64 GB,Speker 2 nos, Head set 1 no, Desktop PC)
Printer A3 Type((Brand-Epson,modal-L8180A3+wifi)
Office table chair one set((ROTATED Steel,5 Wheel,)
Specimen bottle(glass made for display of specimens-(GLASS MADE SIZE OF BOTTLE2FTXZFTX1.5FT TOP OPEN)
FOR PROVIDING AMBULANCE FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (11)
Tata Winger Ambulance AC 3200
Freight charges
FOR PROVIDING MAHENDHRA TWO WHEEL DRIVE POWER OPERATED TRACTOR FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (12)
Mahendhra Two wheel Drive Power opreated Tractor
Tractor trailer for water tank
FOR PROVIDING TROOP CARRIERS TRUCK FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (13)
Troop Carriers Truck (Sa 1212 - 4x4) By Tata Motors
Fright charges
Body work for Troop Carriers Truck (Sa 1212 - 4x4) By Tata Motors
FOR PROVIDING BASIC INFRA STRUCTURES REQUIRED FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (14)
‘Varai’ bracelet 500m (1200 x 500)
Weigh bridge
Nail, sole trimming set.
Bathing brusher
Neem oil
camphor
Decamali recin
FOR CONSTRUCTION OF ELEPHANT WATER TROUGH - 1 FOR MUSTH YARD AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (15)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Water Proofing work for Dampness including material and Labour charges.,
FOR CONSTRUCTION OF ELEPHANT WATER TROUGH FOR MUSTH YARD 2 AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (16)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Water Proofing work for Dampness including material and Labour charges.,
FOR CONSTRUCTION OF ELEPHANT WATER TROUGH FOR ISOLATION YARD AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (17)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Water Proofing work for Dampness including material and Labour charges.,
for construction of shelter for Retired yard -1 in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (18)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
for construction of shelter for Retired yard -2 in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (19)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
FOR CONSTRUCTION OF ELEPHANT WATER TROUGH FOR ISOLATION YARD AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (20)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Water Proofing work for Dampness including material and Labour charges.,
for construction of shelter for isolation yard - 1 in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (21)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
for construction of shelter for isolation yard - 2 in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (22)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
R.R. Masonry in CM 1:5 using new stones including necessary provision of bond stones from approved quarry including simultaneous flush pointing with the same mortar as directed by the departmental officers and as per standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Supplying and fixing of Wooden Post, rafter and reepers (Karumarathu) including fixing, fitting and labour charges etc, Complete.
Painting wood work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
Supplying and fixing of thached with bamboo roof etc., complete complying with standard specification and as directed.
FOR CONSTRUCTION OF ELEPHANT WATER TROUGH FOR TRAINING YARD AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (23)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Water Proofing work for Dampness including material and Labour charges.,
FOR DRINKING WATER SUPPLY TO CAMP ELEPHANT THROUGH MOTOR ENERGIZED BY SOLAR POWER AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-2024. (24)
Geological survey for divining the water level
Clearing scrub jungle growth
Drilling bore well from 0 to 200 feet in depth in hard gravelly soil and hard rock and etc., (150mm dia)
Drilling bore well from 200 to 300 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 300 to 400 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 400 to 500 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 500 to 600 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 600 to 700 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 700 to 800 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 800 to 900 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 900 to 1000 feet in depth in hard gravelly soil and hard rock and etc.,
Drilling bore well from 1000 to 1080 feet in depth in hard gravelly soil and hard rock and etc.,
Supply and fixing 7" Dia PVC Casing Pipe
5 HP High efficiency submersible motor with pump
1 1/4" UPVC Pipe
3 Core 4sqmm Cable
Accessories for Borewell
Erecting for Borewell
Solar panels (Polycrystalline) with IEC standards - 3300 watts
5 HP solar water pumping inverter with MPPT, VFD & Auto ON/OFF Timer
Fixtures with MS angle - micron painted / Protection againts 150 Km/Hr wind velocity @ Rs.15/- per watts one side 4 feet another side 6.5 feet Height
Safety Box for pumping inverter
DC cable with junction box, Connectors and accessories upto inverter terminal @ Rs.7/- per watts
EWE for EPT 80x2+1x2 2
EWE for laying pipe line 100x0.50x1 M
Providing Steel Bridge For EPT 4x1 M
FOR CONSTRUCTION OF CAUSE WAY BRIDGE AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24.(25)
Clearing scrub jungle growth
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Plastering in cement Mortar 1:5-12 mm thick including cost and conveyance of all materials at site labour charges curing etc…, complete
Erection and fixtures of hand rails - 2" round steel pipe for horizontal post and 2" round steel pipe for vertical post @ c/c of every 1m span including transporting charges up to working site
FOR PROVIDING 3D MURAL WORK & ART WORK FOR DISPLAY FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (26)
Providing 3D Mural work including material and Labour charges.,
Providing Art work for display of animals including material and Labour charges.,
for Providing Fence to Kozhikamuthi Elephant camp in Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2023-24 (27)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and fixing of Steel Post size of 100mm X 100 mm Square section 4 mm thick including fixing, fitting and labour charges etc, Complete.
Supplying and fixing of Steel horizontal Poll size of 2.5 inc round pipe including fixing, fitting and labour charges etc, Complete.
Painting steel work with two coats of Synthetic Enamal paint over a priming coat including cost of primer etc. Complete.
FOR CONSTRUCTION OF OVER HEAD TANK TO MODERNIZATION OF KOZHIKAMUTHY ELEPHANT CAMP IN ULANDY RANGE OF ANAMALAI TIGER RESERVE, POLLACHI DIVISION DURING 2023-24. (28)
Earth work exacavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay. Stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders - SS 20B
Refilling with excavated soil (other than sand)Complying with standard specification for filling in foundation and basement
P.C.C 1:5:10 using 40 mm HBG Metal including cost and conveyance of all materials to site etc., complete
Random Rubble masonry in cm1:5 using rough stone, bond stone including cost and conveyance of all materials to site etc.,
Plastering with cm 1:5, 12mm thick including cost and conveyance of all materials to site
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supply and fixing of ISI marked PVC water tank for 1000 liters capacity including all to site
Supply of 50 mm dia HDPE Hose with ISI marked including cost & Conveyance to site
Supply of 32 mm dia HDPE Hose with ISI marked including cost & Conveyance to site
Supply of 25mm dia UPVC pipe with ISI marked including cost & Conveyance to site
Providing laying charges of pipe including earthwork, pipe joining & refilling etc.,
Supplying and Fixing UPVC Specials for 25 mm dia coupler water supply arrangements
Supplying and Fixing UPVC Specials for 25 mm dia Elbow water supply arrangements
Supplying and Fixing UPVC Specials for 25mm dia Bend water supply arrangements
Supplying and Fixing UPVC Specials for 32x25mm Reducer water supply arrangements
Supplying and Fixing of Gun metal valve 32mm dia water supply arrangements
Supplying and Fixing of Gun metal valve 25mm dia water supply arrangements
Supplying and Fixing PVC Specials for pvc screw down tap 20 mm dia water supply arrangements
Supplying and Fixing of UV Treatment Solar Plant Unit 5000 Liter capacity including Transporting and Fitting charges.,
Supplying and Fixing UPVC Specials for 25mm dia Tee water supply arrangements
Supply & Fixing of UPVC Adhesive 100 gram
Supply of shellac
Supply & Fixing of 1''GI Tee
Supply & Fixing of 1''GI Coupling
Supply and fixing of polycrystalline solar panel 4690 watts with IEC Standard(335*14 Nos)
Supply and fixing of Solar panel with GI/P protection against 150 km/hr wind velocity
Supply and fixing of 3 HP Solar PCU with MPPT,VFD technology with automatic tracking facility and high power pumping up to250 m head
Supply and fixing of Earthing panel for array and inverter
Supply and fixing of DC Cable with junction box,connctors and accessories upto inverter terminal
Supply and fixing of Lighting protection for panel and inverter
Supply and fixing of Safety box for solar PCU
Supply and fixing of 3 HP High efficiency submersible motor 70 mtr head
Supply and fixing of 3 core4 sqmm copper cable
Supply and fixing of 25 mm pvc pipe for laying copper cable
Erection and commissioning performance testing and calibration for panel fixtures including transporting charges up to working site
FOR PROVIDING SOLAR PANNEL 5KAV FOR MODERNIZATION OF TREATMENT FACILITIES AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (29)
On-Grid Solar Inverter 5 KVA
MC4 Connector 2 Pair, DC Junction Box 1 No, AC Junction Box 1 No, DC Cable 40 Mtr, AC Cable 30 Mtr, Space required 500 sq feet, Solar Accessories Fasteners, Cable Tie, Crimping Tool, Earthing Kit, Lighting Arrestor, Battery, etc. including all at site.
FOR PAVING OF PAVERS BLOCK TO VIEWING GALERY AT KOZHIKAMUTHI IN ULANDY RANGE DURING 2023-24. (30)
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and laying of interlocking paver block stone 60mm tk. over a base layer of sand filling including cost of materials laying and labour charges etc.,
Purchase of 2 HP Diesel Engine pump set including transporting charges.,
Dharani Geotech Engineers India Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .