| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC | L1 | Accepted-AOC l1 accepted | |
| 2 | L2₹15.5 L+₹1.5 L (10.6%)Rejected-Finance | L2 | Rejected-Finance l2 Rejected |
| Sl No | Description | Qty | Unit | Dhayalan.V L2 | M/S.RIYA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 25.56 | cu.m | 3,092.76 ₹3,649.46 Lowest | 3,092.76 ₹3,649.46 Lowest |
| 2.00 | Filling with Crushed stone dust including cost and coveyance of all materials to work site and all labour charges etc. | 8.24 | cu.m | 14,345.84 ₹16,928.09 Lowest | 14,345.84 ₹16,928.09 Lowest |
| 3.00 | Cement Concrete 1:5:10 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.8 | cu.m | 53,900 ₹63,602 Lowest | 53,900 ₹63,602 Lowest |
| 4.00 | Supply and febrication of steel including cost and conveyance and all labour charges etc,, complete. | 0.9 | MT | 83,700 ₹98,766 Lowest | 83,700 ₹98,766 Lowest |
| 5.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 11.21 | cu.m | 94,164 ₹1,11,113.52 Lowest | 94,164 ₹1,11,113.52 Lowest |
| 6.00 | Refilling foundation and basement with excavated earth in layer including all cost and conveyance of materials etc.., complete. | 26 | cu.m | 1,300 ₹1,534 Lowest | 1,300 ₹1,534 Lowest |
| 7.00 | Supplying and Erection for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charge etc., | 51.33 | sq.m | 26,434.95 ₹31,193.24 Lowest | 26,434.95 ₹31,193.24 Lowest |
| 8.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc | 7.03 | cu.m | 53,428 ₹63,045.04 Lowest | 53,428 ₹63,045.04 Lowest |
| 9.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc, complete. | 36.74 | sq.m | 11,389.4 ₹13,439.49 Lowest | 11,389.4 ₹13,439.49 Lowest |
| 10.00 | Painting two coat using ready mixed emulsion paint of approved and colour over priming coat (New) including cost and all labour charges etc,, complete. | 23.46 | sq.m | 6,944.16 ₹8,194.11 Lowest | 6,944.16 ₹8,194.11 Lowest |
Tender Value
₹17.3 L
EMD Value
₹17,300
Closing Date
21 Aug 2026, 3:00 pmClosed
The Commissioner
Tambaram Corporation 01, muthurangam street West tambaram
Providing Bus Shelter at Kiskintha Road Near MGR Statue Ward no.52 in Zone 4 TCMC
2026_DMA_689846_11
925/2026/e1/z4 21.08.2026
Open Tender
Civil Works
Works
60 days
ZONE 4
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,300
1 Oct 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 25.56 | cu.m | - | - | 18% |
| 2 | Filling with Crushed stone dust including cost and coveyance of all materials to work site and all labour charges etc. | 8.24 | cu.m | - | - | 18% |
| 3 | Cement Concrete 1:5:10 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.8 | cu.m | - | - | 18% |
| 4 | Supply and febrication of steel including cost and conveyance and all labour charges etc,, complete. | 0.9 | MT | - | - | 18% |
| 5 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 11.21 | cu.m | - | - | 18% |
| 6 | Refilling foundation and basement with excavated earth in layer including all cost and conveyance of materials etc.., complete. | 26 | cu.m | - | - | 18% |
| 7 | Supplying and Erection for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charge etc., | 51.33 | sq.m | - | - | 18% |
| 8 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc | 7.03 | cu.m | - | - | 18% |
| 9 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc, complete. | 36.74 | sq.m | - | - | 18% |
| 10 | Painting two coat using ready mixed emulsion paint of approved and colour over priming coat (New) including cost and all labour charges etc,, complete. | 23.46 | sq.m | - | - | 18% |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_829277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_829277.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .