Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 1 14 SUJAL MANSION B BLOCK BHANGWADI KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹11.3 L (10.2%)Admitted-Finance | ₹1.2 Cr+₹11.3 L (10.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹25.3 L (22.9%)Admitted-Finance SHOP NO 106 1ST FLOOR ASHOKA SHOPPING CENTRE LT ROAD MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | ₹1.4 Cr+₹25.3 L (22.9%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹26.7 L (24.2%)Admitted-Finance | ₹1.4 Cr+₹26.7 L (24.2%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹29.2 L (26.5%)Admitted-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.4 Cr+₹29.2 L (26.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AIRFRAME L8 | Chakshu Enterprise L1 | pk Enterprises L3 | BRITE INDUSTRIES L4 | Shree Ayyappa Engineering L5 | DARSHAN CONSTRUCTION Co. L2 | shakti engineering and electrical works L6 | DURGAI ELECTRICALS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Complete removal of existing water proofing treatment of any description and in any position including PCC padding any thickness and cleaning, wire brushing, watering & removal of debris outside MOD
Note :- 1. Taking down earthing strips incl insulators from roof for treatment and re-fixing of same with existing specification in the same |position after laid APP membrance including replacement of broken| |insulators, PVC rawl plus & screws etc are deemed to be inclusive of rate quoted by the contractor.
2. Unit rate quoted shall also include for removal of PVC water storage| |tank wherever existing carefully and refixing at the same or otherl position after completion of roof repair work. | 170 | Sqm | 250 ₹42,500 | 111 ₹18,870 | 40 ₹6,800 | 95 ₹16,150 | 74 ₹12,580 | 50 ₹8,500 | 22 ₹3,740 Lowest | 74 ₹12,580 |
| 2.00 | Material and Labour Cutting out cracks to V-section in existing roofs or terracing, |cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) | 20 | Rm | 25 ₹500 Lowest | 241 ₹4,820 | 100 ₹2,000 | 160 ₹3,200 | 170 ₹3,400 | 170 ₹3,400 | 108 ₹2,160 | 180 ₹3,600 |
| 3.00 | Roughening surfaces Of old concrete floors by picking, sweeping clean |and washing down with waters to remove dusts etc. complete all as specified | 170 | Sqm | 45 ₹7,650 | 164 ₹27,880 | 30 ₹5,100 Lowest | 48 ₹8,160 | 50 ₹8,500 | 50 ₹8,500 | 36 ₹6,120 | 56 ₹9,520 |
| 4.00 | Brushing neat cement slurry with 3kg/sqm all as specified | 170 | Sqm | 60 ₹10,200 | 41 ₹6,970 | 20 ₹3,400 Lowest | 27 ₹4,590 | 30 ₹5,100 | 20 ₹3,400 Lowest | 27 ₹4,590 | 30 ₹5,100 |
| 5.00 | Material and Labour PCC 1:2:4 type B0 using 12.5 mm graded stone aggregate as in |concrete padding laid to required slope incl finishing the concrete surface fair and even without using extra cement complete all as specified and as directed. | 4.8 | Cum | 650 ₹3,120 Lowest | 1,801 ₹8,644.8 | 9,000 ₹43,200 | 11,621 ₹55,780.8 | 12,000 ₹57,600 | 8,000 ₹38,400 | 8,200 ₹39,360 | 13,500 ₹64,800 |
| 6.00 | |Material and labour for 10 mm thick screed bed or bedding layer of mortar in cement| mortar (1:4) for laying roof finish as padding finished with WPC 3% by |weight of total cement, complete all as specified and directed
NOTE :- Integral WPC shall be measured and paid separately | 170 | Sqm | 450 ₹76,500 | 244 ₹41,480 | 180 ₹30,600 Lowest | 229 ₹38,930 | 244 ₹41,480 | 300 ₹51,000 | 265 ₹45,050 | 250 ₹42,500 |
| 7.00 | Apply oil bound bitumen primer @ 0.40 Litre / Sqm manufactured by the same agency as that of APP with density of 0.87 to 0.89 Kg / Litre at 25 |degree Celsius on the prepared dry roof surface. | 170 | Sqm | 150 ₹25,500 | 266 ₹45,220 | 30 ₹5,100 Lowest | 48 ₹8,160 | 50 ₹8,500 | 40 ₹6,800 | 65 ₹11,050 | 60 ₹10,200 |
| 8.00 | Material and Labour APP based polymeric membrane min weighting 3kg/sqm and minimum 3mm thick reinforced with polyster non woven fabric(wt not less than 150 gms/sqm laid on primed surfaces by forced application method all as specified. | 170 | Sqm | 25 ₹4,250 Lowest | 673 ₹1,14,410 | 450 ₹76,500 | 547 ₹92,990 | 560 ₹95,200 | 500 ₹85,000 | 492 ₹83,640 | 580 ₹98,600 |
| 9.00 | Material and Labour for preparation of new surfaces of any description not otherwise described over 10cm width or girth and applying two coats of solar reflective aluminium paint @ 0.10 kg/sqm membrane surfaces. | 170 | Sqm | 30 ₹5,100 Lowest | 95 ₹16,150 | 65 ₹11,050 | 82 ₹13,940 | 87 ₹14,790 | 70 ₹11,900 | 62 ₹10,540 | 85 ₹14,450 |
| 10.00 | Supply only liquid water proofing compound as pedicrete URP mix with cement concrete/ cement plaster as per manufacture instruction all as directed by Engr-in-Charge. Make : DR. FIXIT PIDE PROOF LW, FOSROC | 36 | Ltr | 40 ₹1,440 Lowest | 51 ₹1,836 | 300 ₹10,800 | 355 ₹12,780 | 340 ₹12,240 | 250 ₹9,000 | 222 ₹7,992 | 390 ₹14,040 |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
21 Aug 2026, 6:00 pmClosed
CWE Karanja
CWE KARANJA NAVAL STATION KARANJA NAVI MUMBAI MAHARASHTRA 400704
SPECIAL REPAIR TO CENTRAL AC PLANT OF DBM 11 AT NAD KARANJA
2026_MES_777846_1
84553-K/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Station Karanja
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE NW Karanja
₹2.1 L
10 Sept 2026
23 Jul 2026
24 Aug 2026
23 Jul 2026
21 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Complete removal of existing water proofing treatment of any description and in any position including PCC padding any thickness and cleaning, wire brushing, watering & removal of debris outside MOD
Note :- 1. Taking down earthing strips incl insulators from roof for treatment and re-fixing of same with existing specification in the same |position after laid APP membrance including replacement of broken| |insulators, PVC rawl plus & screws etc are deemed to be inclusive of rate quoted by the contractor.
2. Unit rate quoted shall also include for removal of PVC water storage| |tank wherever existing carefully and refixing at the same or otherl position after completion of roof repair work. | 170 | Sqm | 100 | ₹17,000 |
| 2 | Material and Labour Cutting out cracks to V-section in existing roofs or terracing, |cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) | 20 | Rm | 100 | ₹2,000 |
| 3 | Roughening surfaces Of old concrete floors by picking, sweeping clean |and washing down with waters to remove dusts etc. complete all as specified | 170 | Sqm | 100 | ₹17,000 |
| 4 | Brushing neat cement slurry with 3kg/sqm all as specified | 170 | Sqm | 100 | ₹17,000 |
| 5 | Material and Labour PCC 1:2:4 type B0 using 12.5 mm graded stone aggregate as in |concrete padding laid to required slope incl finishing the concrete surface fair and even without using extra cement complete all as specified and as directed. | 4.8 | Cum | 100 | ₹480 |
| 6 | |Material and labour for 10 mm thick screed bed or bedding layer of mortar in cement| mortar (1:4) for laying roof finish as padding finished with WPC 3% by |weight of total cement, complete all as specified and directed
NOTE :- Integral WPC shall be measured and paid separately | 170 | Sqm | 100 | ₹17,000 |
| 7 | Apply oil bound bitumen primer @ 0.40 Litre / Sqm manufactured by the same agency as that of APP with density of 0.87 to 0.89 Kg / Litre at 25 |degree Celsius on the prepared dry roof surface. | 170 | Sqm | 100 | ₹17,000 |
| 8 | Material and Labour APP based polymeric membrane min weighting 3kg/sqm and minimum 3mm thick reinforced with polyster non woven fabric(wt not less than 150 gms/sqm laid on primed surfaces by forced application method all as specified. | 170 | Sqm | 100 | ₹17,000 |
| 9 | Material and Labour for preparation of new surfaces of any description not otherwise described over 10cm width or girth and applying two coats of solar reflective aluminium paint @ 0.10 kg/sqm membrane surfaces. | 170 | Sqm | 100 | ₹17,000 |
| 10 | Supply only liquid water proofing compound as pedicrete URP mix with cement concrete/ cement plaster as per manufacture instruction all as directed by Engr-in-Charge. Make : DR. FIXIT PIDE PROOF LW, FOSROC | 36 | Ltr | 100 | ₹3,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_871163.xls
BOQ • 1.48 MB
SOC.pdf
Additional Documents • 0.18 MB
tender553.pdf
Tender Documents • 2.03 MB
amdtfinal553.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .