Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9.0 L
Closing Date
15 Jun 2026, 4:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
15 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:
The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.[Ref:- GCC April 2022 Para 10.1 of Tender Form (Second Sheet) of Annexure I of ITT. Further 'Explanation for Para 10 of the Tender Form (Second Sheet) including Para 10.1 to 10.5 - Eligibility Criteria' shall be as per GCC April 2022].
Defination of Similar Work :- Any work of Signal & Telecom involving trenching,laying,testing of Signalling & Telecom Cables.
49 conditions · 1 needing a document upload
The bidder has to submit the Annexures attached with tender:- I/A,I/B,II, III,IV/A,IV/B ,V,V (A),tender first Sheet duly fill-up and signed (As applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mode of Payment from Railway through a "Letter of Credit(LC)" arrangement. If yes, attach beneficiary Bank details. Details available in Special condition.
The Balance Sheet and all other Financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN failing which the offer shall be considered as incomplete and will be summarily rejected without any further reference.
(Special Condition of Contract for mandatory updating of Labour data on Railway's shramikkalyan portal by Contractor (Ref:- Railway Board letter no.-2018/CE-I/CT/4, Dated 17.10.2018.)
A. Contractor is to abide by the provisions of Payment of Wages act &Minimum Wages act in terms ofclause 54 and 55 of Indian Railway GeneralCondition of Contract. In order to ensure the same, anapplication has beendeveloped and hosted on websitewww.shramikkalyan.indianraihwars.gov.in'.Contractor shall register his firm/company etc. and uploadrequisite details oflabour and their payment in this portal. These details shall be available inpublicdomain. The Registration' updation of Portal shall be done as under:(a) Contractor shall apply for onetime registration of his company/firm etc. inthe Shramikkalyan portal with requisite details subsequent toissue of Letter ofacceptance. Engineer shall approve the contractor's registration within 7 daysof receiptof such request. (b)Contractor once approved by any Engineer, cancreate password with login ID (PANNo.) for subsequent use of portal for allLOAs issued in his favour. (c) The contractor once registered onthe portal,shall provide details of his Letter of Acceptances (LOA)/Contract Agreementson shranikkalyanportal within 15 days of issue of any LOA For approval ofconcerned engineer. Engineer shall update (ifrequired) and approve thedetails of LOA filled by contractor within 7 days of receipt of such request.(d)After approval of LOA by Engineer, contractor shall fill the salient details ofcontract laboures engagedin the contract and ensure updating of each wagepayment to them on shramikkalyan portal on monthlybasis. (e) It shall bemandatory upon the contractor to ensure correct and promt uploading of allsalientdetails of engaged contractual labour & payment made thereof aftereach wage period. B. Whileprocessing payment of any 'ON account bill' or'Final bill' or relese of 'Advance ' or 'PerformanceGuarantee/Security deposit' contractor shall submit a certificate to the Engineer orEngineer'srepresentative that " I have uploaded the correct details of contract laboursengaged inconnection with this contract and payment made to them during the wage period in Railway'sShramikkalan portal at www.shramikkalyan.indianrailways.gov.in till _____, month,______ Year.".
Special Conditions for inclusion of 'Letter of Credit' as Mode of Payment in works Tender or Service tender. (Authority: - Railway Bd. letter no.2018/CE-I/CT/9, dated: 04.06.2018).
For all the tenders having advertised cost of Rs.10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement.
This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.
The option so exercised, shall be an integral part of the bidder's offer.
The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.
In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:
The LC shall be a sight LC.
The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.
SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15% per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills.
The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.
The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor.
The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation (format enclosed as Annexure 2) after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.
The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.
The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.
On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch).
The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.
3.5.11 The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch).
The contractor's bank (advising bank) shall submit the documents to the Railway's Bank (Local 3.5.12 SBI Branch).
The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally 3.5.13 signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.
Any number of bills can be dealt within one L.C, provided the sum total of payments to contractor is within the amount for which LC has been opened.
The LC shall be closed after the release of final payment including PVC amount, if any, to the 3.5.15 contractor.
The release of performance guarantee or security deposit shall be dealt directly by railway with the contractor i.e., not through LC.
All correction up to date in GCC 2022 will be applicable to this tender document.
Payment Terms:
For Purely Supply Items:-90% of the value of each Supply Item of Schedule of Works will be Paid after supply of Items and on production of the following documents: - (i) Receipt of Material at Consignee's depot. (ii) Original inspection certificate / waiver of inspection issued by Inspecting Officer.(iii)Manufacturers' inspection certificate that the materials are in accordance with the specifications of the contract. Invoice in duplicate. A certificate that the materials supplied are as per the contract and the amount claimed in the invoice is correct as per terms of the contract. (vi) (a) Store receipt certificate issued by Railway official/Representative as per format as Annexure - R of existing Tender document(Copy enclosed). 5% percent payment for purely Supply Items against tender schedule of works will be made after successful commissioning of the Station. (b) The balance 5% percent payment for purely Supply Items against tender schedule of works will be made after Completion of Work, with Final Bill of the Contract.
For Purely Execution/Installation items: - 90% of the value of each Purely Installation Item of Schedule of Works will be paid after Installation & Testing of the Item. (a)5% percent payment for Purely Execution /Installation items against tender schedule of works will be made after successful commissioning of the station. (b)The balance 5% percent payment for purely Execution /Installation Items against tender schedule of works will be made after successful commissioning of the Station. Note: In case commissioning of station is delayed by more than 06 months on Railway Account and the physical work has been completed by the contractor in totality then 5% payment on account of commissioning of the station shall be released to the contractor.
For Supply & Installation items: - 90% percent payment for Supply &installation Items against tender schedule of works will be made after successful installation & testing and on production of the documents mentioned above in Para 1. on account bill shall be paid only on production of certificate by the site Engineer that relevant portion of installation has been completed. (a) 5% percent payment for Supply &Installation Items against tender schedule of works will be made after successful commissioning of the Station. (b)The balance 5%percent payment for supply & installation items against tender schedule of works will be made after completion of work with final bill of the contract.
All payments shall be made on the certificate of the Engineer within a reasonable time of the submission of the necessary bills by the contractor. Payment shall be made through cheques/NEFT/RTGS/LC payment in the name of the Contractor.
Scope of Work:- (i) The work of laying OFC and Quad Cable shall be executed with the objective of enhancing overall cable health, minimizing noise, and reducing transmission losses. The cables shall be laid at a uniform depth of 1.0 to 1.2 metres, strictly in accordance with Railway standards and in the presence of Railway representatives. Prior to laying, insulation testing of all cables shall be conducted to ensure compliance with required insulation values and to verify the proper functioning of all associated gears like BPAC, UFSBI, etc. Cable jointing and splicing shall be carried out only under duly approved disconnection/traffic block conditions, ensuring adherence to Railway safety procedures. (ii) Any damage to life & railway property will lead to Financial penalty & FIR on the tenderer. (iii) Note:- Railway reserve the right to change/alter/delete the Site/Location as per requirement of railway, feasibility/availability of site, Site requirement or for any other reason. (iv)The latest Specifications, Amdt. Shall apply to all the drawing/specifications. The detailed tech. specifications, Insp., term & conditions etc. for work execution, supply will be as per tender document./condition (as applicable) and Railway/HQ regarding management of contract, technical aspects, execution of work, E. C. railway practice inforce etc. Inspection for each items is mentioned in schedule , however, for any safety items which requires TPI , the same to be supplied, with TPI irrespective of the inspection mentioned in schedule . Note:- All the materials (schedule items) shall be supplied as per railway requirement. There should be no any compatibility/suitability issues for supplied materials to the existing/New equipment. (v)The work will be executed and materials will be supplied as per instruction of site engineer. (vi)The item /Qty. taken in schedule may vary as per site requirement. Railway reserve the right to change/alter/delete the item/Qty.at any stage of contract,. Railway does not guarantee work under each item and quantities of the schedule. (vii)The price quoted by the Tenderer shall include the price of materials including all incidental charges for transport, loading/ Unloading and handling of materials and all others charges etc. The prices shall include all taxes (Including GST), duties, royalty and levies (including Octroi etc.).,Recovery of taxes from Bill:- As per Extant Rule. The contractor shall be responsible for carriage, safe transport of materials, loading unloading and safe handling of all materials etc. for execution of work. (ix)The various standard guidelines issued by Railway/HQ regarding management of contract, technical aspects, execution of work, E. C. railway practice inforce etc. shall be apply in this contract (As applicable).
Transportation of Materials:-
All materials specifically supplied by contractor to be supplied to the SSE/Signal or Tele/Store/SPJ or as specified by competent authority.
Contractor will carry all the materials either Railway supplied or contractor supplied from SSE/Signal or Tele/Store/SPJ or as specified by Competent authority to the site of work at his own cost and arrangement.
Execution of AMC:- Not applicable.
Laying of OFC and 6 quad in SHC-SRGR, SKI-JYG section and Provision of alternate communication in JYG- KJI-KHTN AND BHGJ-,MRIJ station of SPJ division
ECR_SPJ_ST_T_26_OFC_6QUAD
ECR_SPJ_ST_T_26_OFC_6QUAD
Open
Works - General
12 Months
Samastipur, Bihar
₹0
₹9.0 L
15 Jun 2026
25 May 2026
1 Jun 2026
106 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,48,25,964.12 | ||
| — | 85000.00 | — | — | ||
| Excavation of trench in all kinds of soil including cleaning of roots etc up to a depth of 1m depth and 300mm width in all kinds of soil including morriun but excluding Hard rocky soil duly Cleaning any roots of trees, plants, bushes etc in entire Section as per RE specification . The trench should be parallel to the track, back filling of trenches after laying of cables and ramming of soil trenches and consolidation of soil to original ground level and disposal of Soil without bricks. (Inspection- Consignee). | — | — | — | 44,14,050 | |
| — | 85000.00 | — | — | ||
| Laying of cable of different sizes as per cable route plan approved by Railway and meggering of all main & tail cables as per technical specification of tender.(i)Telecom Cable:5 Prs./10 Prs./Quad. (Inspection-Consignee). | — | — | — | 4,47,100 | |
| — | 1500.00 | — | — | ||
| Supply of Double WalledCorrugated (DWC)Pipe/duct withassociated collars etc.as per RDSOSpecification No.RDSO/SPN/204/2011 orlatest anti-rodent &anti-oxidant and nonflame propagating typein 6 meters straightlength and of size 120mm outer dia,& 103.5mm inner dia. (Themanufacturers,suppliers must produce valid IS license andshould be certifiedunder ISO 9000 andshall submit copy ofcertificate). One couplerwith suitable rubber O-ring should be suppliedwith every 6m of pipelength. (The totalquantity of above itemsis equal to no. of pipessupplied.) DWC pipeshall be marked atevery 1 mtr length insuch a way thatmanufacturer's name,vendor name and yearof manufacture can beeasily identified. (Inspection-RITES) | — | — | — | 7,08,030 | |
| — | 1500.00 | — | — | ||
| Horizontal Boring/Manual molingwithout damage tosurface road /track forlaying/isertion ofDWC/GI/HDPE pipe.The bore shall be doneat the depth ofminimum 1400 mmfrom the ground level.The ground level shallbe considered ignoringthe bank height of thebank of the road.Note:- DWC/ HDPE/ GIPipe Supply is notcovered under thisitem. Contactor shallprovide all materialrequired for work andadequate nos. oflabours for properlaying of cables into thebore. Cable shall be laidcautiously so that itshould not get damagedue to rough handling &pressure on cable.Payment of boring shallbe made only afterDWC/HDPE/GI pipe islaid in the bore.(Inspection-Consignee). | — | — | — | 11,68,155 | |
| — | 2000.00 | — | — | ||
| Laying and fixing ofMedium class GI pipes100 mm dia (4.5 mmthickness) as per IS1239 ( Part 1) 2004 orlatest with coupling onculverts/bridges, perforated at a distanceof 20 cm or less with 10mm dia hole, or at anyother locations asdecided by SiteEngineer.The GI pipe isto be filled with chattered compound. Itincludes supply of allmaterial required for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. The laying and fixing to be done as per RDSO drawings no.SDO/cable laying/011and SDO/cable laying/012, issued vide RDSO document no.RDSO/SI/G/2010Version 1.1 dated04.02.2014, or latest (Inspection-Consignee). | — | — | — | 5,09,400 | |
| — | 500.00 | — | — | ||
| Supply of Medium classGI pipes 100 mm dia(4.5 mm thickness)with thread collars asper IS 1239 (Part 1)2004 or latest withcoupling onculverts/bridges,perforated at a distanceof 20 cm or less with 10mm dia hole, or at anyother locations asdecided by SiteEngineer. It includessupply of all materialrequired for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. (Inspection by Consignee) | — | — | — | 3,56,490 | |
| — | 2000.00 | — | — | ||
| Cutting of all types of platforms/road crossing and trenching and excavation to a width and depth of 300 mm x300 mm, laying of DWC/HDPE/GI pipe in the trench and refilling and concreting it afterwards as per original condition. In hard rocky ground area, cables will be laid normally on layer of soft earth of 0.05 mtrs thickness previously deposited at bottom of the trench . The cutting to be filled and finished with cement/concrete, as per the RDSO drawing no.SDO/Cable laying/008, issued vide RDSO document no.RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest. (Inspection-Consignee) | — | — | — | 2,28,420 | |
| — | 700.00 | — | — | ||
| Supply and installation of Electronic Cable Route markers(with RFID) as per TEC Specification no TEC GR TX TIE- 07/02/Mar-14 or latest, of suitable frequency and colorfor Telecommunication cables as per the TEC Specifications, to be provided at the spacing of 200 metres in the trench and at places/corners where the route of cable changes including at both ends of Level crossings Roud Crossings. The Electronic route marker shall also be provided at the all joints also. It includes the programming of Markers as per Instructions of Engineer in charge and preparation & submission of the list of IDs of all Markers installed. The Marker shall be of Specifications to work for minimum 5 feet distance (depth).The Markers and the Marker Locator unit (Locate rcovered separately) are to be Inspected & supplied together of same make and compatible model.(Inspection by RITES) | — | — | — | 11,38,284 | |
| — | 3.00 | — | — | ||
| Supply and testing of Integrated cable route tracer and RFID marker locator of reputed make, Stanley/3M or similar. (Inspection by RITES) | — | — | — | 10,45,939.35 | |
| — | 10.00 | — | — | ||
| Digital multi meter model no.18-S ofRishabh/ Fluke/ kusummake . (Inspection by Consignee) | — | — | — | 1,63,449.3 | |
| — | 2.00 | — | — | ||
| Supply of Cable fault locator for metallic S&T cables of reputed make Venus 120/Stanley/3M. Item to be supplied after successful demonstration and approval of Railways.(Inspection by Consignee) | — | — | — | 4,33,608.88 | |
| — | 100.00 | — | — | ||
| Supply of MCB 6-32Amp. (Inspection-Consingee) | — | — | — | 13,342 | |
| — | 2.00 | — | — | ||
| Supply of industrial vaccum cleaner. Make Bosch (Inspection by consignee) | — | — | — | 50,134.64 | |
| — | 20.00 | — | — | ||
| Supply of Krone tool.(Inspection by consignee) | — | — | — | 17,811.6 | |
| — | 20.00 | — | — | ||
| Supply of Crimping Tool RJ-45 & RJ-11(Inspection by Consignee) | — | — | — | 14,373.2 | |
| — | 1000.00 | — | — | ||
| Supply of Thermo shrinks Jointing Kit (Spec No. Spec no. IRS TC-77-2200 amendment upto date) for straight through cum derivation joints.(Inspection-RDSO) | — | — | — | 24,92,500 | |
| — | 400.00 | — | — | ||
| Installation of Thermo Shrink Jointing Kit as per DOT/Technical Specification with RDSO modification/Termination Joints with VF Transformer on 6 quad Telecom cable. This includes supply of VF Transformers.(Inspection-Consignee). | — | — | — | 4,62,980 | |
| — | 5000.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of store materials preparation of site and boaring for placing of 110mm dia HDPE/DWC pipe for crossing of S&T cable together at bridges/ culverts/track/ pucca road crossing, boaring trench shall be minimum 3 (three) mtr meter below the river bed and 01 Mtr below the track/ road/ pucca road/ Crossing area. This includes supply of DWC/ HDPE pipe along with accessories for HDPE/DWC pipes, cost of fuel and all other items which will be required for laying of cable through it, the work shall be executed as per instruction of site engineer.(a) boaring upto the length of 150m.(Inspection-Consignee). | — | — | — | 56,96,250 | |
| — | 100.00 | — | — | ||
| Supply and fixing of 20 pair C.T. Box and termination of cable.As per item no.5 of technical specification attached. (Inspection-Consignee). | — | — | — | 2,02,069 | |
| — | 1000.00 | — | — | ||
| Supply of VF (2T /3T)Transformer joint assembly of VF transformers 1120:470. As per IRS: TC 76/2021 ver1.0 or latest. Inspection-RITES) | — | — | — | 9,17,400 | |
| — | 50.00 | — | — | ||
| Supply of Master telephone with voice recording facility as per RDSO/SPN/TC/51/2021,Rev.1.0 or with latest amendment. Inspection: RDSO | — | — | — | 21,22,489.5 | |
| — | 180.00 | — | — | ||
| Supply of Slave telephone for selective calling facility as per RDSO/SPN/TC/51/2021,Rev.1.0 or with latest amendment. Inspection: RDSO | — | — | — | 6,77,268 | |
| — | 180.00 | — | — | ||
| Supply of 24V/12v DC power supply for Master telephone for Selective calling as per RDSO/SPN/TC/51/2021, Rev.1.0. Inspection: RDSO | — | — | — | 7,46,730 | |
| — | 40.00 | — | — | ||
| Supply of permanently lubricated HDPE Telecom Duet for use as underground optical Fibre Cable conduit size 40/33 mm(Outer diameter/Inner diameter) as per Intest RDSO Specification No.-RDSO/SPN/ TC/45/2013 revison with ammendment No. 1.0 & 2.0 and the following accessories (a) End plugs 2No.of each Km of duct (b) Cable sealing plug 1 No. for each Km for duct (C) Plastic Couplers-slip Fit/Push fit type-2 Nos for each Km of duct & (d) End Cap to be provided along with drum- 2Nos.for each km of duct . (Inspection RDSO). | — | — | — | 24,01,210 | |
| — | 50.00 | — | — | ||
| Laying of HDPE pipe in trenches. (Inspection-Consignee). | — | — | — | 3,25,216 | |
| — | 50.00 | — | — | ||
| Blowing/Pulling of OFC cable through HDPE pipe already laid in the trenches. (Inspection-Consignee). | — | — | — | 4,71,169 | |
| — | 250.00 | — | — | ||
| Supply of OFC joint enclosure ( 24 Fibre) as per TEC Specification No. G/OJC- 02/01 Mar 99 with latest amendements. (Inspection- Consignee). | — | — | — | 6,70,252.5 | |
| — | 500.00 | — | — | ||
| Supply of OFC Patch Cord with FC/PC-LC/PC10 meter long.(Inspection-Consignee). | — | — | — | 2,50,805 | |
| — | 500.00 | — | — | ||
| Supply of LC to SC Single Mode Simplex/Duplex Fibre Optic Patch Cable 5m length.(Inspection-Consignee). | — | — | — | 92,350 | |
| — | 500.00 | — | — | ||
| Supply of SC to SC Single Mode Simplex/Duplex Fibre Optic Patch Cable 5m length. (Inspection-Consignee). | — | — | — | 91,270 | |
| — | 500.00 | — | — | ||
| Supply of LC to LC Single Mode Simplex/Duplex Fibre Optic Patch Cable 5m length.(Inspection-Consignee). | — | — | — | 91,810 | |
| — | 100.00 | — | — | ||
| Supply and Installation of OFC joint enclosure and splicing of Optical fiber cable (48 fibers)and testing as per technical Specification No. GROJC- 2/02 sept2003. Supply of splice enclosure (48 fiber)shall be as per Boards specification of TEC. All materials including fusion splicing machine used for fiber splicing and OTDR for testing and other testing materials if any shall be arranged by the contractor.(Inspection-Consignee). | — | — | — | 15,24,436 | |
| — | 20.00 | — | — | ||
| Supply, installation and fixing of FDMS as per RDSO Spec. No. RDSO/SPN/ TC/ 37/2020 Revision 4.0 or latest. Splicing of 2 nos. of 24 fiber/ 1 nos of 48 fiber Optic Fibre Cable on the splice trays with provision of taking out 48 fiber of OFC. Pigtail with connector etc. as per TEC Spec. No.G/OFJ-01/03 June 1999 or latest in 10 meter and 5 meter length as detail in specification and as advised by railway engineer as per requirement shall be supply by contactor.The system shall be supply along with standard rack of size 19 inch and 42U with mounting arrangement.(Inspection : RITES) | — | — | — | 10,03,980 | |
| — | 50.00 | — | — | ||
| Trenching upto depth of 1.20 Mtr. & 30 cm.wide base in all type of soil & back filling after duct/ cable laying as per technical specification attached.(Inspection-Consignee). | — | — | — | 26,94,832 | |
| — | 1000.00 | — | — | ||
| Transporting and supply and Installation of concrete (RCC)route indicators at intervals of 100 meter or instructed by site engineer as per drawing of "CSTE/OL,SK No. NER. GKP /SK/CM /2017 " they should be of standard RCC with letters "Telecom cable" as per type of cable laid to drawing as per technical specification attached. Inspection : Consignee | — | — | — | 7,67,840 | |
| Route Kilo (RKM) | Meter | — | — | ||
| — | 150.00 | — | — | ||
| Location survey of cable route, preparation of tentative and final cable route plan (for OFC/Quad cable only)as per approved format in the section including supply of final route plan after the cables are laid and commissioned indicating clearly the exact position of the cable, joints and other critical items with reference to OHE mast & other fixed structures, etc. in 06 nos. hard bound copies on white bond paper of maximum A-3 size well documented and bound with plastic covers with editable soft copy in AutoCAD (latest version).(Inspection-Consignee). | — | — | — | 1,48,614 | |
| — | 150.00 | — | — | ||
| Supply of Splice Closure for Optical Fiber Cables (48F)Armoured and Metal free type OFC With screws sealing as per as perTEC/GR/TX/OJC-002/03/APR-2010 or latest,including all miscellaneous items & consumables for fiber splicing, make:3M/Comscope/R&M/similar, Inspection: Rites. | — | — | — | 6,60,676.5 | |
| — | 75.00 | — | — | ||
| Excavation of OFC pit for cable jointing of size 1.5m x1.5m x 1.2 m for all type of soils. The section. Backfilling the pit and ramming after jointing. Provision of brick walling the four wall sand bottom of pit with RCC slab, back filling with earth and ramming as per drawing. N.B. all the materials including cement required for the above will be supplied by the tenderer. (Inspection-Consignee). | — | — | — | 4,57,236.75 | |
| — | 50.00 | — | — | ||
| Cement concrete work for miscellaneous items in the ratio 1: 3: 6. Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate note xceeding 3.8 cm.)(Aggregate cement & sand to be supplied by the contractor). Wherever depth of 0.5 m cable trench is not feasible, cable shall be protected as: - Preparation of cement mixture 1:3:6 with contractor's own materials and spreading cement concrete mixture layer of 100 mm thick over the already laid cables in the excavated trench.(Inspection-Consignee). | — | — | — | 1,64,241.5 | |
| — | 25.00 | — | — | ||
| Supply of Fiber Optic Patch Panel 48 Port 19'' 1U Rack mountable, Simplex and Single Mode, Rack Mountable 48 port fully loaded with all consumables, with SC and ST and FC and LC connector, Adapter Capacity : 48(SC/LC, Simplex), Adapter Panels : Fixed on drawer base, Splice Tray : 2nos. for 48 fibers, Accessories :Cable management rings (6nos), Cable glands (PG13.5,2 nos), Splice rods (24/48nos), Blanking clips (24 nos),Velcro ties (12 nos.),Mechanical Specifications:-Dimensions (mm) : 482 x220 x 44.3 mm (LengthxWidth x Height), Base Material : Cold Rolled Steel with Black Powder Coating, Splice Tray Material : ABS Plastic (220 x 90 x 15 mm)(Length xWidth x Height),Maximum Fiber Count : 48Fiber, Fusion Capacity : 24 Fiber maximum per splice tray, Comply as per ANSI/TIA 568-C.3, Comply as per ISO/IEC 11801, RoHS Compliant: Directive2002/95/EC. make: Digisol/ similar. Inspection:Consignee." | — | — | — | 3,22,552.5 | |
| — | 5.00 | — | — | ||
| Supply of fiber shot Fiber optic tool kit, Warranty 12 month, Standard Kit Contents : Fiber shot Optical Power Meter, Fibershot Visual Fault Locator, 3 Hole Fiber Stripper, Scissor, Fiber Cleaning Tissue 1Pack, Cable Sheath Remover, Bolt Cutter, Steel Wire Rope Cutter Side Cutter, Round Cable Slitter, Screw driver Set - 6 Heads ,Buffer Tube Cutter, Nose Plier, Marker Pen, Electrical Tape, Alcohol Dispenser,6"Adjustable Wrench, Rechargeable Torch, 60mm Sleeves - 100 Pcs, LN Key Set, Measuring Tape-5M,Small Hacksaw, Utility Knife,Tweezer Kit, Small Hammer, Chamfering Tool for Ducts, Air Blower, Hard Carrying Case etc. Inspection: Consignee. " | — | — | — | 2,00,205 | |
| — | 50.00 | — | — | ||
| Casting, Concreting and curing of foundation and erection of Half apparatus case (GKP- type) as per DRG No. SGW/MGS/L1/91 including cost of all materials required for fixing holding down bolts, casting concreting and fixing of E-type lock. Half location box will be supplied by Railway.Note:-(i) The contractor will provide holding down bolts.(ii) Bottom of apparatus cases should be filled with sand and the top surface covered with masonry work and neat cementing. (iii) E-type locks to be fixed as per instruction of site engineer. (Inspection-Consignee). | — | — | — | 1,74,000 | |
| — | 500.00 | — | — | ||
| Supply of 6 Pin socket for Emergency Box as per Spec. No.IRS:TC-42/87 in the Half Location Box by cutting a small notch of the proper size & termination of derivation cable at the socket.(Inspection-Consignee). | — | — | — | 1,74,000 | |
| — | 95.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No. RDSO/SPN/197 Ver. 1.0 or latest to achieve a resistance less than 1 ohm. It consist of following: (a) Copper bonded steel electrode of minimum 3.0 meter long, minimum 17.0 mm dia with copper bonding thickness of minimum 250 microns and UL listed and marked = 1No. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3Nos. (c) Copper strip of150x25x6 mm, to terminate earth rod = 1 No.(d) Copper strip of 300x25x6 mm (MEEB) = 1No. (e) Copper strip of 150x25x6mm (SEEB) = 1No. Gi) Supply of 35 sq.mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate. (minimum 10 meter.) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter. ) (iv) Supply of 10 sq. mm multistrand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable. (Inspection Agency :-RDSO) | — | — | — | 18,28,311.1 | |
| — | 95.00 | — | — | ||
| Installation of Unit Maintenance Free Earth to achieve a resistance less than 1 ohm as supplied under item no, 13002 of Chapter 13 of SOR. It includes (i) Digging the earth to the required depth.(ii) Insertion of electrode.(iii) Filling of earth enhancing compound (Approx.30 Kg) (iv)Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1,5 ft x1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sqmm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments, Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mmx 6 mm to be welded with each earth electrode, copper strips of 300 mm x25 mm x 6 mm for main equip-potential busbar, copper strips of 150 mm x25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mmx 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x300 mmx 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specn. No.RDSO/SPN/ 197 Ver 1.0 or latest. Typical RDSO approved drawings referred in the RDSO specification document are : (i)SDO/RDSO/ E&B/001 for typical installation of Earth, (ii) SDO/RDSO/E&B/002 for typical bondong and earthing connections, (iii)SDO/RDSO/E&B/003 for typical arrangement for earth resistance measurements.(Inspection-Consignee). | — | — | — | 7,56,988.5 | |
| — | 10.00 | — | — | ||
| Supply of VRLA Battery set,48V/200AH Sealed Maintenance Free VRLA Battery duly charged as per IRSspec. No. S- 93/96(A) with Amndt.-1 or latest. with intercell connectors consisting of 24 cells of 2V each.(Inspection-RDSO). | — | — | — | 8,86,206.7 | |
| — | 120.00 | — | — | ||
| Supply of VRLA Battery set,12V/100AH, as per RDSO spec. No. S-93/96(A) with Amndt.-1 or latest, with suitable racks.Make : Exide or Similar.(Inspection-RDSO). | — | — | — | 15,85,024.8 | |
| — | 50.00 | — | — | ||
| Supply and Installation of lightning and Surge Protection device both Class B & Class C between line and neutral & Earth of approved type as per RDSO Spec No. RDSO/SPN/144/2004 or latest.(Inspection-RDSO). | — | — | — | 13,74,082.5 | |
| — | 10.00 | — | — | ||
| Supply of SMPS based Battery Chargers as per RDSO Spec for Telecom use 48 Volts ,25 Amp in 2+1 configuration modules 25 Amp,with ultimate expandable capacity 50 Amps, automatic switching between the module as per RDSO spec. No.RDSO/SPN/TC/23/1999 version 4 or latest along with two potential free contacts.(Inspection-RDSO) | — | — | — | 10,16,299.3 | |
| — | 250.00 | — | — | ||
| Supply of earth electrode Materials to be procured as per E.Rly Sketch No.SGW/T/3/G/8/89. (Insp.-Consignee). | — | — | — | 3,64,110 | |
| — | 200.00 | — | — | ||
| "Fixing of Earth electrode including earth wire as per DRG. No. S&T/C-41 (NKG) for 6 Quad/telecom Cable and other equipment as per instruction of site engineer all materials except earth electrode shall be supplied by contractor required for execution of the work." (Inspection-Consignee). | — | — | — | 88,358 | |
| — | 200.00 | — | — | ||
| Supply and laying of earth lead wire and soldering of lead wire to earth electrode and 6 Quad/Telecom Cable/Telecom Equipment as per instruction on earthing and providing cement enclosure for earth elcetrode as per DRG. No. S&T / C -36(NKG). This includes supply of all materials by the contractor. It also include armour contunity(Inspection- Consignee). | — | — | — | 2,13,612 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender_1stsheet1.pdf
ATTACHMENT
TenderNotice6.pdf
ATTACHMENT
Annexures6.pdf
ATTACHMENT
Techspec.pdf
ATTACHMENT
GCC2022WithACS_upto10th.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .