| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.7 LAccepted-AOC NO 10 12 128 EAST MAIN ROAD OPP GOVT ITI MADHAIYANKUTTAI METTUR DAM | TIRUCHIRAPPALLI | TAMIL NADU | 621011 | ₹57.7 L Quoted ₹52.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹55.7 LRejected-Finance A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹55.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI BHAGAVATHY ENTERPRISES L1 | DEVI FABRICATORS AND ENGINEERING CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of existing heavily wornout 250NB, 300NB, 350NB & 400NB M.S ERW pipe, bend, spool piece and connected pipe line parts for Bottom ash B steam conveying pipe lines from Bottom Ash Area to silo, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 820 | mtr | 600 ₹4.9 L | 630 ₹5.2 L |
| 2.00 | Loading, transporting and unloading of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes from Central stores/MTPS-II to work site in trailer truck for erection of worn out existing MS ERW pipes
a)Hire charges for trailer truck for transporting of 250NB, 300NB, 350NB & 400NB M.S ERW pipes from central stores / MTPS-II to work site, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 4 | days | 17,700 ₹70,800 | 18,800 ₹75,200 |
| 3.00 | Loading, transporting and unloading of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes from Central stores/MTPS-II to work site in trailer truck for erection of worn out existing MS ERW pipes
b)Loading of 250NB, 300NB, 350NB & 400NB new M.S ERW pipes in trailer truck and unloading at work site, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 820 | mtr | 80 ₹65,600 | 84 ₹68,880 |
| 4.00 | Erection of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes bend, spool piece and connected pipe line parts from Bottom ash Area to Bottom ash Silo for Ash conveying lines with suitable joints, welding of cleats for placing clamps and fixing with suitable supports etc, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc.,
a) Erection of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes and connected pipe line parts from Bottom ash area to Silo, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc. | 760 | mtr | 2,350 ₹17.9 L | 2,500 ₹19 L |
| 5.00 | Erection of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes bend, spool piece and connected pipe line parts from Bottom ash Area to Bottom ash Silo for Ash conveying lines with suitable joints, welding of cleats for placing clamps and fixing with suitable supports etc, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc.,
b) Erection of 400NB New M.S ERW pipes and connected pipe line parts from silo bottom to silo top. (For an altitude of 45m from ground level), inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 60 | mtr | 4,250 ₹2.5 L | 4,540 ₹2.7 L |
| 6.00 | Erection of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes bend, spool piece and connected pipe line parts from Bottom ash Area to Bottom ash Silo for Ash conveying lines with suitable joints, welding of cleats for placing clamps and fixing with suitable supports etc, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc.,
c)Erection of bends, T, Y pieces and spool piece of various sizes and connected pipe line parts from Bottom ash 'D' pump area to Bottom ash Silo area, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 10 | Nos | 12,400 ₹1.2 L | 13,000 ₹1.3 L |
| 7.00 | Erection of 250NB, 300NB, 350NB & 400NB New M.S ERW pipes bend, spool piece and connected pipe line parts from Bottom ash Area to Bottom ash Silo for Ash conveying lines with suitable joints, welding of cleats for placing clamps and fixing with suitable supports etc, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc.,
d) Erection of Expansion joint and reducer of various sizes and connected pipe line parts from Bottom ash 'D' pump area to Bottom ash Silo area, inclusive the cost of all consumables, hire charges of all T&Ps, safety appliances and all labour charges etc., | 8 | Nos | 6,000 ₹48,000 | 6,400 ₹51,200 |
| 9.00 | Charges for supply of Expansion joint various sizes
i)250NB Expansion joint | 2 | Nos | 17,000 ₹34,000 | 18,000 ₹36,000 |
| 10.00 | Charges for supply of Expansion joint various sizes
ii)300NB Expansion joint | 2 | Nos | 20,300 ₹40,600 | 21,700 ₹43,400 |
| 11.00 | Charges for supply of Expansion joint various sizes
iii)350NB Expansion joint | 2 | Nos | 23,625 ₹47,250 | 25,200 ₹50,400 |
Tender Value
Refer Docs
EMD Value
₹52,700
Closing Date
25 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
Dismantling of existing heavily worn-out Bottom ash B stream conveying MS pipe
2025_EB_593954_1
OT 112 Dismantling of existing heavily worn-out Bottom ash B stream conveying MS pipe
Open Tender
Maintenance Works
30 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹52,700
Yes
11 Mar 2026
18 Aug 2025
26 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid