| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC LESS |
| 2 | L2₹4.2 L+₹186.29 (0.04%)Rejected-AOC | ₹4.2 L+₹186.29 (0.04%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | NFS CONSTRUCTIONS L1 | CRP CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 1.5 | m3 | 5,071 ₹7,584.31 Lowest | 5,072 ₹7,585.81 |
| 2.00 | 2.Desilting in the existing drain as per the direction of departmental officers etc. completed. | 16 | m3 | 128 ₹2,048 Lowest | 129 ₹2,064 |
| 3.00 | 3.Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 5 | m3 | 572 ₹2,857.14 Lowest | 573 ₹2,862.14 |
| 4.00 | 4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 16 | m3 | 220 ₹3,520 Lowest | 220 ₹3,520 Lowest |
| 5.00 | 5. Plain cement Concrete in1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete | 5.8 | m3 | 5,962 ₹34,579.6 Lowest | 5,963 ₹34,585.4 |
| 6.00 | 6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 80 | m2 | 534 ₹42,720 Lowest | 535 ₹42,800 |
| 7.00 | 7. Plain cement Concrete in1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 13.99 | m3 | 6,721 ₹94,060.39 Lowest | 6,722 ₹94,074.39 |
| 8.00 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 50 | m2 | 309 ₹15,450 Lowest | 310 ₹15,500 |
| 9.00 | 9.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.., | 7 | Qtl | 9,542 ₹66,794 Lowest | 9,543 ₹66,801 |
| 10.00 | 10. Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 7 | m3 | 8,496 ₹59,505.98 Lowest | 8,497 ₹59,512.99 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Dec 2025, 3:00 pmClosed
Assistant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018
Reconstruction of Culvert and MR to the Storm Water Drain at Sundaram Street 2 in ward no 47
2025_MAWS_631177_10
E6/2025-26/CZ
Open Tender
Civil Works
Works
Central zone
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5,000
Yes
10 Aug 2026
11 Dec 2025
19 Dec 2025
11 Dec 2025
19 Dec 2025
11 Dec 2025
1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges
2.Desilting in the existing drain as per the direction of departmental officers etc. completed.
3.Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges
4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed.
5. Plain cement Concrete in1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete
6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete
7. Plain cement Concrete in1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed.
8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed.
9.Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc..,
10. Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
11. Supply & Fixing of SFRC Manhole cover With frame 600mm dia as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification.
12.Supply & Fixing of SFRC Manhole cover With frame 600mm x 600 mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification.
13. Conveying excavated earth from the site to 15 km distance from the city limit including loading, unloading and transportation etc. complete.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_755054.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .