Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.1 LAdmitted-Finance | +37.11% | ₹41.1 L | L1 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
7 Jun 2026, 6:00 pmClosed
Commissioner, Municipal corporation, Bhilwara
Commissioner, Municipal corporation, Bhilwara
railway line ke paschimi kshetra me patch karya (ARC)
2026_DLB_562266_2
NIT-03/2026-27 MCB BHILWARA CIVIL
Open Tender
Civil Works
Percentage
365 days
Bhilwara
Please refer Tender Document
4 documents required · 4 mandatory
₹500
Eazypay Link
₹60,000
Yes
12 Jun 2026
25 May 2026
9 Jun 2026
28 May 2026
7 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 200 | Cum | 1,775 | ₹3,55,000 |
| 2 | Filling of Pot- holes and patch repairs with open graded premix surfacing 20mm thick compacted with bitumen binder VG-grade 30 @ 14.60 kg/10 sqm and aggregate in Hot mix plant, transporting the mixed material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface complete as per clause 3004.2 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 19,235 | Sqm | 137.5 | ₹26,44,812.5 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
Tendernotice_2.pdf
PDF • 0.58 MB
Tendernotice_3.pdf
PDF • 2.66 MB
BOQ_1000569.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .