| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC N4 234 IRC VILLAGE NAYAPALLI KHURDA KHORDHA ODISHA 751015 | KHORDHA | ODISHA | 751015 | ₹2.5 Cr Quoted ₹2.2 Cr | L1 | Accepted-AOC Awarded for the work including GST |
| 2 | L2₹2.2 Cr+₹7.4 L (3.40%)Rejected-Finance | ₹2.2 Cr+₹7.4 L (3.40%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹2.4 Cr+₹26.8 L (12.4%)Rejected-Finance | ₹2.4 Cr+₹26.8 L (12.4%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹4.5 Cr+₹2.3 Cr (105.1%)Rejected-Finance | ₹4.5 Cr+₹2.3 Cr (105.1%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹6.0 Cr+₹3.8 Cr (176.2%)Rejected-Finance | ₹6.0 Cr+₹3.8 Cr (176.2%) | L5 | Rejected-Finance Other than L1 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
4 Oct 2023, 4:00 pmClosed
Head(Contract and Procurement)
OMC Ltd., OMC House, Bhubaneswar
On-Grid Solar Photovoltaic Power Plant with Cumulative capacity of 390 kWp(capacity Smaller than 100 kWp) at different mines of OMC
2023_OMC_92722_2
OMC/E-PROC/CP/71/2023 Date 18.08.2023
Open Tender
Miscellaneous Goods
Item Rate
90 days
OMC Ltd., Bhubaneswar
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
Yes
₹5 L
Yes
Through VC
8 Feb 2024
19 Aug 2023
4 Oct 2023
19 Aug 2023
4 Oct 2023
13 Sept 2023
19 Aug 2023 - 2 Sept 2023
5 Sept 2023
Amount
Description
Design, Engineering, Manufacture / Procurement, Supply, Installation, Testing, Commissioning and 3 months running for Performance Measurement having different capacity at Different Mines of OMC. (Ground Mounted)
Design, Engineering, Manufacture / Procurement, Supply, Installation, Testing, Commissioning and 3 months running for Performance Measurement having different capacity at Different Mines of OMC . (Roof Mounted)
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted Year 1
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted Year 2 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 3 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 4 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted Year 5 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 6 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 7 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 8 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 9 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
Comprehensive Maintenance of 165 KWp Ground Mounted and 225 KWp rooftop mounted for Year 10 Note: Bidder to quote Escalation % over previous year. It should not exceed 5%.
M/s Wattplus Energy Private Limited
Sugs Lloyd Private Limited
ALFA PROJECTS AND SERVICES PRIVATE LIMITED
Tavasya Venture Partners Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .