| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LRejected-Finance | ₹4.2 L | L1 | Rejected-Finance ACCEPTED |
| 2 | L2₹4.3 LRejected-Finance | ₹4.3 L | L2 | Rejected-Finance REJECTED |
| 3 | L3₹4.4 LRejected-Finance | ₹4.4 L | L3 | Rejected-Finance REJECTED |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹4,229
Closing Date
29 Apr 2026, 4:00 pmClosed
GRAMPANCHAYAT ADHIKARI AND SARPANCH GP OFFICE KOND
GP OFFICE KOND TQ AND DIST DHARASHIV
Construction of C.C. Road at Kond Taluka and District Dharashiv (15th F.C. 2025_26 )
2026_OSMAN_1296340_1
E-TENDERNOTICE20042026-2
Open Tender
Civil Works - Roads
90 days
GP OFFICE KOND TQ AND DIST DHARASHIV
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹4,229
GP OFFICE KOND TQ AND DIST DHARASHIV
11 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Item No.1:-Supplying trap/granite/ quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). Addn.Spec.No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.57) | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Item No.2: Supplying soft murum at the road site, including conveying and stacking complete (SSR 22-23 It.No.2.29b) | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Item No.3:-Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Addn.Spec.No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.58) | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Item No.4:-Spreading hard murum/ soft murrum/ gravel or kankar for side width complete (SSR 22-23 It.No.2.30) | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Item No.5:- Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. (SSR 22-23 It.No.50.61 ) | - | sqm | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Item No.6:- Providing & laying in situ cement concrete of M 10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work compacting and curing etc. complete. with reversible Drum Type mixer with SCADA. With crushed sand . (SSR 22-23 It.No.11.03) | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Item No.7:-Providing and laying in situ / ready mix M20 CC of trap/ granite/ quartzite/ gneiss metal for wearing course 8cm thick including compacting, finishing, curing and filling in joints with bitumen etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ) Additional Spec.No. BR.47(a) Page Number 140 and B. 7, Page Number38 (SSR 22-23 It.No.14.39 ) | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Item No.8: Charges for testing of material in vigilance and quality control laboratory for concrete compressive strength of C.C. Cube ( Set of 3 cubes) Rate as per SSR 22-23 Sr.No.19 P.No.3 | - | Test | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | Item No.9: Charges for testing of material in vigilance and quality control laboratory for Metal (Sieve Analysis) Rate as per SSR 22-23 Sr.No.19 Page No.2 | - | Test | - | - | - |
| 10 | Item No.10: Royalty charges b) For all other Minerals= Royalty + surcharge (2%) = 211.95 + 4.23 = 216.18 per cum. As per SSR 2022-23 Section V Page No.3 | - | Cu.M. | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2227117.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid