| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC 121004 | ₹3.2 Cr | L1 | Accepted-AOC Technically qualified and quoted lowest amount |
| 2 | L2₹3.3 Cr+₹8.2 L (2.54%)Rejected-Finance | ₹3.3 Cr+₹8.2 L (2.54%) | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹3.4 Cr+₹17.3 L (5.34%)Rejected-Finance 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | ₹3.4 Cr+₹17.3 L (5.34%) | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | Not Admitted-Fee/PreQual/Technical NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
19 Nov 2024, 3:00 pmClosed
SE Sixth Circle IW Lucknow
Office of SE six circle Lucknow
Janpad Unnao me Ajgain Rajwaha sa Km 0.000 se Km 11.320 tk Punarsthapna avam Nehri bhumi ke simankan ka karya
2024_UPIDC_964008_2
04/SE-6/2024-25 LOT6
Open Tender
Civil Works
Item Rate
360 days
Unnao
Please refer tender documents
4 documents required · 4 mandatory
₹2,354
₹7.9 L
Yes
9 Dec 2024
13 Nov 2024
19 Nov 2024
13 Nov 2024
19 Nov 2024
13 Nov 2024
Amount
Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead. All Work done as per direction of Engineer-in-charge.
Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge.
Earth work in strengthening Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.All Work done as per direction of Engineer-in-charge.
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.All Work done as per direction of Engineer-in-charge.
E/w in cutting in foundation of syphon/ curtain wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge.
Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete.All Work done as per direction of Engineer-in-charge.
Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete.
Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grite including cost of material, labour, T&p etc, complete.
Laying Reinforced Cement Concrete (M25 A20) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete.
Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. All Work done as per direction of Engineer-in-charge.
Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.
Providing & Fixing Bitumen Joint filer Board For Expansion Joints. All Work done as per direction of Engineer-in-charge.
12 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge.
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard) All Work done as per direction of Engineer-in-charge.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
Dry brick on Edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge.
Supply of LDPE Film 200 Micron of 1st grade including all tax and Contractor's profit
Laying & fixing R.C.C 1000 MM Dia (N.P-3) pipe including cost of Pipe, labour, T&p etc, complete.
Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge.
Painting Chainage & Name of Canal on Km Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge.
Painting Chainage / No. on Canal Boundary Stone / 200M Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge.
Making sub grade in linning work including watering, compaction and preparation of surface.
Laying Reinforced Cement Concrete (M20) in slab in 1:1.5:3 with stone grit including cost of material, labour, T&p etc, complete.
Boring/drilling bore well of 400mm dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipments, tools,plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.
Supplying & Laying 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender. The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally ocurring acids and alkalies. including excise duty , toll tax and contractor's profit.
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized 150mm Dia PVC medium well casing (CM) pipes with ribs,conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge.
Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized 150mm Dia PVC medium well screen (RMS) pipes with ribs,conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge.
Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer,for all leads & lifts, all complete as per direction of Engineer -incharge
Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, inrequired thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Laying brick soling layer on prepared sub-grade with brick on edge accoridng to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25mm thick layer of earth over brick soiling, watering and rolling the same with three wheel road roller 80-100 Kn as per MORD Technical Spacification Clause 412.
Earth work in Restoring of Canal Section.all work Done as par Drawing & direction of Engineer-in- charge including cost of all material, Labour T&P etc .
Laying & aligning to P.V.C. pipe of 110mm proper in outlet with including all cost of labour & material.
Supplying and fixing Painted Gauge Sheet of Iron Sheet 200X3.15 mm Thick including cutting ,Painting and fixing in position on Gauge Piller / Wall with one coat of red oxide primer.(all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
ARUN CONSTRUCTION (BID ID -4730019)
M/S ASHISH KUMAR (BID ID -4718713)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .