Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 Cr Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | L1 | - | |
| 2 | L2₹18.1 Cr+₹30.4 L (1.71%) Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | L2 | - | |
| 3 | L3₹18.2 Cr+₹41.0 L (2.30%)Financial bid opened Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | L3 | Financial bid opened | |
| 4 | L4₹18.4 Cr+₹58.8 L (3.30%) Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | L4 | - | |
| 5 | L5₹20.4 Cr+₹2.6 Cr (14.7%) Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. | L5 | - |
| Sl No | Description | Qty | Unit | M/s Anil Enterprises L5 | Eastern Construction Company L2 | GUPTA CONSTRUCTION PVT LTD L1 | Varun Gupta and Co L3 | A M Infratech L4 |
|---|---|---|---|---|---|---|---|---|
| 1 | C/o Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G+5) including, Water supply, Sanitary Installation, Internal Electrical Installations, Service connection, Fire Fighting System, Fire Alarm System, HVAC, CCTV, Lifts, DG set and development works at IIT(BHU), Varanasi | - | - | -26.7 ₹20,43,83,852.34 | -35.03 ₹18,11,57,147.2 | -36.12 ₹17,81,17,878.41 Lowest | -34.65 ₹18,22,16,708.73 | -34.01 ₹18,40,01,233.5 |
Tender Value
₹27.9 Cr
EMD Value
₹37.9 L
Closing Date
14 Dec 2022, 3:00 pmClosed
EE&SM( C) -3
Vinay Kumar Tiwari
BHU Project Varanasi 3 Behind Central Office CPWD BHU
Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) including Water supply, sanitary installation, internal electrical installation, service connection, fire fighting system, fire alarm system, HVAC, CCTV, Lifts, DG Set and development works at IIT(BHU) Varanasi. Subwork/Packages: Construction of Department of Architecture, Planning & Design and School of Decision Science and Engineering building (G plus 5) at IIT(BHU) Varanasi
26345
12/EE/BHUPD-3/2022-23
OPEN
Civil Works - Buildings
NCB
15 months
Kanpur Nagar, Uttar Pradesh
8 documents required · 8 mandatory
₹37.9 L
Not Applicable
14 Dec 2022
1 Dec 2022
14 Dec 2022
14 Dec 2022
7 Dec 2022
stage.html
html • 0.10 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITPARTA.pdf
document • 1.00 MB
NITPARTB.pdf
document • 1.05 MB
NITPARTC.pdf
document • 1.16 MB
NITPARTD.pdf
document • 0.46 MB
StructuralDrawing.pdf
document • 8.19 MB
D&A-A-000a-R-01.pdf
document • 1.46 MB
D&A-A-000-R-01.pdf
document • 0.58 MB
D&A-A-001-R-01.pdf
document • 0.78 MB
D&A-A-002-R-01.pdf
document • 0.76 MB
D&A-A-003-R-01.pdf
document • 0.75 MB
D&A-A-004-R-01.pdf
document • 0.76 MB
D&A-A-005-R-01.pdf
document • 0.75 MB
D&A-A-006-R-01.pdf
document • 0.75 MB
D&A-A-007.pdf
document • 0.37 MB
D&A-A-008.pdf
document • 0.27 MB
D&A-A-009.pdf
document • 0.30 MB
D&A-A-010.pdf
document • 0.25 MB
D&A-A-011.pdf
document • 1.10 MB
D&A-A-012.pdf
document • 1.33 MB
D&A-A-013.pdf
document • 1.02 MB
D&A-A-014.pdf
document • 1.00 MB
D&A-A-015.pdf
document • 1.35 MB
D&A-A-016.pdf
document • 0.86 MB
D&A-A-017.pdf
document • 1.16 MB
D&A-A-018-R01.pdf
document • 3.48 MB
D&A-A-019-R01.pdf
document • 3.43 MB
D&A-A-020.pdf
document • 0.58 MB
D&A-A-021.pdf
document • 0.56 MB
D&A-A-022.pdf
document • 0.90 MB
D&A-A-023.pdf
document • 0.91 MB
D&A-A-024.pdf
document • 0.76 MB
D&A-A-025.pdf
document • 0.79 MB
Schedule of Finishes (R-01).pdf
document • 0.04 MB
D&A-A-026.pdf
document • 0.76 MB
D&A-A-027.pdf
document • 0.84 MB
D&A-A-028.pdf
document • 0.20 MB
D&A-A-029.pdf
document • 0.30 MB
D&A-A-030.pdf
document • 0.33 MB
D&A-A-031.pdf
document • 0.15 MB
D&A-A-032-R-01.pdf
document • 0.71 MB
D&A-A-033-R-01.pdf
document • 0.69 MB
D&A-A-034-R-01.pdf
document • 0.68 MB
D&A-A-035-R-01.pdf
document • 0.68 MB
D&A-A-036-R-01.pdf
document • 0.67 MB
D&A-A-037-R-01.pdf
document • 0.66 MB
D&A-A-038.pdf
document • 0.32 MB
D&A-A-039-R-01.pdf
document • 0.75 MB
D&A-A-040.pdf
document • 0.52 MB
D&A-A-041.pdf
document • 0.23 MB
D&A-A-042.pdf
document • 1.22 MB
D&A-A-043.pdf
document • 0.91 MB
D&A-A-044.pdf
document • 0.82 MB
D&A-A-045.pdf
document • 0.80 MB
D&A-A-046.pdf
document • 0.81 MB
D&A-A-047.pdf
document • 0.73 MB
D&A-A-048-R-01.pdf
document • 0.20 MB
D&A-UG-01.pdf
document • 0.32 MB
DOOR HARDWARE SCHEDULE (R-1).pdf
document • 0.03 MB
Sanitary Hardware Schedule (R-1).pdf
document • 0.02 MB
CCTV_ELV-01.pdf
document • 0.80 MB
CCTV_ELV-02.pdf
document • 0.82 MB
CCTV_ELV-03.pdf
document • 0.76 MB
CCTV_ELV-04.pdf
document • 0.78 MB
CCTV_ELV-05.pdf
document • 0.75 MB
CCTV_ELV-06.pdf
document • 0.75 MB
CCTV_ELV-07.pdf
document • 0.35 MB
CCTV_ELV-08.pdf
document • 0.30 MB
CCTV_ELV-09.pdf
document • 0.36 MB
P.A. SYSTEMS_PA-01.pdf
document • 0.79 MB
P.A. SYSTEMS_PA-02.pdf
document • 0.78 MB
P.A. SYSTEMS_PA-03.pdf
document • 0.77 MB
P.A. SYSTEMS_PA-04.pdf
document • 0.77 MB
P.A. SYSTEMS_PA-05.pdf
document • 0.76 MB
P.A. SYSTEMS_PA-06.pdf
document • 0.76 MB
P.A. SYSTEMS_PA-07.pdf
document • 0.39 MB
FIRE FIGHTING & ALARM_FA-01.pdf
document • 0.80 MB
FIRE FIGHTING & ALARM_FA-02.pdf
document • 0.79 MB
FIRE FIGHTING & ALARM_FA-03.pdf
document • 0.79 MB
FIRE FIGHTING & ALARM_FA-04.pdf
document • 0.79 MB
FIRE FIGHTING & ALARM_FA-05.pdf
document • 0.77 MB
FIRE FIGHTING & ALARM_FA-06.pdf
document • 0.77 MB
FIRE FIGHTING & ALARM_FA-07.pdf
document • 0.39 MB
FIRE FIGHTING & ALARM_FF-01.pdf
document • 0.84 MB
FIRE FIGHTING & ALARM_FF-02.pdf
document • 0.83 MB
FIRE FIGHTING & ALARM_FF-03.pdf
document • 0.81 MB
FIRE FIGHTING & ALARM_FF-04.pdf
document • 0.82 MB
FIRE FIGHTING & ALARM_FF-05.pdf
document • 0.81 MB
FIRE FIGHTING & ALARM_FF-06.pdf
document • 0.81 MB
FIRE FIGHTING & ALARM_FF-07.pdf
document • 0.46 MB
HVAC_D&A-HVAC-001.pdf
document • 1.95 MB
HVAC_D&A-HVAC-002.pdf
document • 1.97 MB
HVAC_D&A-HVAC-003.pdf
document • 1.72 MB
HVAC_D&A-HVAC-004.pdf
document • 2.18 MB
HVAC_D&A-HVAC-005.pdf
document • 2.14 MB
HVAC_D&A-HVAC-006.pdf
document • 2.22 MB
HVAC_D&A-HVAC-007.pdf
document • 0.55 MB
HVAC_Design Summary.pdf
document • 0.03 MB
LL-01.pdf
document • 2.08 MB
LL-02.pdf
document • 2.05 MB
LL-03.pdf
document • 1.89 MB
LL-04.pdf
document • 2.14 MB
LL-05.pdf
document • 2.32 MB
LL-06.pdf
document • 2.32 MB
LL-07.pdf
document • 0.33 MB
PL-01.pdf
document • 1.90 MB
PL-02.pdf
document • 1.96 MB
PL-03.pdf
document • 1.68 MB
PL-04.pdf
document • 1.99 MB
PL-05.pdf
document • 2.10 MB
PL-06.pdf
document • 2.09 MB
PL-07.pdf
document • 0.32 MB
DB-01.pdf
document • 0.86 MB
DB-02.pdf
document • 0.96 MB
DB-03.pdf
document • 0.92 MB
EL-00.pdf
document • 0.33 MB
ELSP-001.pdf
document • 0.46 MB
ELSP-002.pdf
document • 0.40 MB
ENRL-01.pdf
document • 0.73 MB
ENRL-02.pdf
document • 0.76 MB
ENRL-03.pdf
document • 0.72 MB
ENRL-04.pdf
document • 0.73 MB
ENRL-05.pdf
document • 0.69 MB
ENRL-06.pdf
document • 0.69 MB
ERL-01.pdf
document • 0.34 MB
LPS-01.pdf
document • 1.85 MB
PPL-01.pdf
document • 0.41 MB
UPSL-01.pdf
document • 0.39 MB
UPSL-02.pdf
document • 0.32 MB
DL-01.pdf
document • 1.00 MB
DL-02.pdf
document • 0.91 MB
DL-03.pdf
document • 0.91 MB
DL-04.pdf
document • 0.90 MB
DL-05.pdf
document • 0.89 MB
DL-06.pdf
document • 0.88 MB
DL-07.pdf
document • 0.48 MB
DL-08.pdf
document • 0.36 MB
SP-001-R-01.pdf
document • 0.65 MB
RWH-01.pdf
document • 0.41 MB
TS-01.pdf
document • 0.55 MB
WS-01.pdf
document • 0.93 MB
WS-02.pdf
document • 0.88 MB
WS-03.pdf
document • 0.87 MB
WS-04.pdf
document • 0.87 MB
WS-05.pdf
document • 0.87 MB
WS-06.pdf
document • 0.86 MB
WS-07.pdf
document • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .