Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹25,500.02 (14.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.1 L+₹33,000.03 (19.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.2 L+₹50,200.04 (29.2%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
7 Aug 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_316848_13
e-NIT 18 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹5,000
Yes
14 Aug 2026
21 Jul 2026
8 Aug 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.Welded. | 964.8 | sqm | 138.2 | ₹1,33,335.36 |
| 2 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge Made of G.I. wire of dia 4 mm . | 71.14 | sqm | 809.9 | ₹57,616.29 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah . | 6.72 | cum | 5,402.9 | ₹36,307.49 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.54 | cum | 5,733.6 | ₹14,563.34 |
| 5CARRIAGE OF MATERIALS By Mechanical Transport/By Manual Labour including loading, unloading and stacking | |||||
| 0.9 | Carriage of Sand avg. lead of 20.00 km by MT & 300.00 Mtr. By HL. | 3.41 | cum | 815.12 | ₹2,779.56 |
| 0.0 | Carriage of Stone aggrigate avg. lead of 20.00 km by MT & 300.00 Mtr. By HL. | 1.71 | cum | 815.12 | ₹1,393.86 |
| 0.9 | Carriage of Stone avg. lead of 400.00 Mtr. By HL. | 6.72 | cum | 595.88 | ₹4,004.31 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1036028.xls
BOQ • 0.38 MB
Extension.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .