Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹44.8 L+₹2.1 L (5.02%)Accepted-Finance | L2 | Accepted-Finance 2nd Lowest Bidder | |
| 3 | L3₹47.6 L+₹5.0 L (11.7%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest Bidder |
| Sl No | Description | Qty | Unit | bharaniengineeringworks L3 | MOHIDEEN ENTERPRISES L1 | V NARAYANAN L2 |
|---|---|---|---|---|---|---|
| 1.01 | Sweeping and mopping of the office floors (Flooring with ceramic/ marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitutres for twice in a week, cleaning of all partition walls, ceilings (Brick, wooden & Aluminium, Glazed), Staircase, hand rails, doors, windows, blinds, Name boards etc, removal of cobweb once in a month collecting and disposing all the wastes to outside of the office complex with all general cleaning inside the office Floors etc.. complete as directed by the Engineer at site including cost of all labour, lobour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete. | 8,07,731 | Sq.m | 1.1 ₹8,88,504.1 | 1.1 ₹8,88,504.1 | 0.72 ₹5,81,566.32 Lowest |
| 1.02 | Sweeping and mopping of the office floors (Flooring with cement mortar) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings (Brick, wooden & Aluminium, Glazed), Staircase, hand rails, doors, windows, blinds, Name boards etc, removal of cobweb once in a month collecting and disposing all the wastes to outside of the office complex, with all general cleaning inside the office Floors etc.. complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete. | 1,18,360 | Sq.m | 1 ₹1,18,360 | 1.1 ₹1,30,196 | 0.72 ₹85,219.2 Lowest |
| 1.03 | Sweeping and mopping of the common areas in various offices such as passage (Flooring with ceramic / marble / granite tiles) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of ceilings , doors, windows, Name boards etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning in common office floors etc… complete as directed by the Engineer at site including cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. | 2,83,853 | Sq.m | 0.9 ₹2,55,467.7 | 1.1 ₹3,12,238.3 | 0.72 ₹2,04,374.16 Lowest |
| 1.04 | Sweeping and mopping of the common areas in various offices such as passage (Flooring with cement mortar) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of ceilings , doors, windows, Name boards etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning in common office floors etc., complete as directed by the Engineer at site including cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. | 1,83,050 | Sq.m | 0.7 ₹1,28,135 Lowest | 0.8 ₹1,46,440 | 0.72 ₹1,31,796 |
| 1.05 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc. complete. | 11,39,808 | Sq.m | 0.3 ₹3,41,942.4 | 0.27 ₹3,07,748.16 | 0.18 ₹2,05,165.44 Lowest |
| 1.06 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodical intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odour or foul smell.
(a) Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) | 66,680 | Sq.m | 5 ₹3,33,400 | 4.5 ₹3,00,060 | 3.6 ₹2,40,048 Lowest |
| 1.07 | (b)Water closets (IWC / EWC) | 15,076 | No | 15 ₹2,26,140 | 13 ₹1,95,988 | 4.5 ₹67,842 Lowest |
| 1.08 | (c) Urinals cleaning & providing scented urinal screen, coloured naphthalene balls) | 14,910 | No | 10 ₹1,49,100 | 12 ₹1,78,920 | 9 ₹1,34,190 Lowest |
| 1.09 | (d) Washbasins | 17,808 | No | 10 ₹1,78,080 | 8 ₹1,42,464 Lowest | 9 ₹1,60,272 |
| 1.10 | Trimming of Korean grass provided in lawns using cutting equipment and road center median, cutting the edges evenly, disposing of debris away from the site as directed by the Engineer at site including cost of Hire charges for cutting equipment, labour charges, all T&P, lead & lift, etc, complete. (Power Supply to cutting equipment will be given by departmentally at free of cost). (Two operations per year) | 1,832 | Sq.m | 7 ₹12,824 | 3 ₹5,496 Lowest | 7.2 ₹13,190.4 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
13 Oct 2025, 2:00 pmClosed
SE VGTPS
VGTPS, Ramanathapueram - 623536
Housekeeping of plant areas and buildings of Phase -I at Valuthur Gas Turbine Power Station in Ramanathapuram District for a period of two years from the date of commencement
2025_EB_608391_1
SE/VGTPS/RMD/WC.NO.30/2025-26
Open Tender
Miscellaneous Works
Works
730 days
SE VGTPS
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
Yes
27 Oct 2025
25 Sept 2025
14 Oct 2025
25 Sept 2025
13 Oct 2025
25 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .