Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹1,400
Closing Date
7 Jul 2026, 9:00 am2d left
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for Construction of RCC Plinth for 11/0.4 kV, 250 kVA Sub-Station (0RS) over Drain by Providing and Casting RCC Slab Above the Drain at Village Rainsary under Electrical Sub-Division HPSEBL Basal
2026_HPSEB_137803_1
BID NO- UED/73/2026-27
Open Tender
Civil Works - Others
90 days
Village Rainsary under Electrical Sub-Division HPS
AS PER SBD
5 documents required · 5 mandatory
₹590
₹1,400
1 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | A) CIVILPart | - | - | - | - |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 2.97 | cum | 237 | ₹703.89 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) | 4.65 | cum | 8,733 | ₹40,608.45 |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| 1.05 | Foundations, footings, bases of columns, etc. for mass concrete | 0.87 | sqm | 266 | ₹231.42 |
| 1.06 | Suspended floors, roofs, landings, balconies and access platform | 9.28 | sqm | 612 | ₹5,679.36 |
| 1.07 | Edges of slabs and breaks in floors and walls Under 20 cm wide | 9.3 | sqm | 164 | ₹1,525.2 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) | 2.95 | Cum | 10,220 | ₹30,123.45 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 353.7 | Kg | 112 | ₹39,614.4 |
| 1.1 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 150.3 | kg | 143 | ₹21,492.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
Tendernotice_2.pdf
PDF • 0.63 MB
BOQ_203993.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid