Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
28 Aug 2026, 9:00 am4d left
DSCO Gurdaspur
Room No 401 402 Block B Third Floor District Administration Complex Gurdaspur
Soil Erosion Land Protection Work Crate Wire Structure Retaining Wall Rain Water Harvesting Tank etc
2026_DOA_173296_1
DSWC/GUR/2026-2027/11
Open Tender
Civil Works
Item Rate
90 days
Dharkalan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.3 L
10 Aug 2026
10 Aug 2026
28 Aug 2026
10 Aug 2026
28 Aug 2026
10 Aug 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-2027/11
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
Stone Masonry Land Protection Structure/ Soil Erosion Land, Village Jalahar, Narianpur, Bungal, Lanjera, Dhar Khurd, Dunra and Hara Sukhniyal Tehsil Dharkalan, Distt. Pathankot.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 11392399
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :-Soil Erosion Land Protection Work, Village Jalahrh Tehsil Dharkalan, Distt. Pathankot.
Est. No. D.B, dated Amount 3108111 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture (Wall Painting) Total
1 Crate wire Structure-1 102152 58556 0
2 Retaining Wall-2 198031 351811 0
3 Run Off Control Str.-3 95397 184335 0
4 Run Off Control Str.-4 95397 184335 0
5 Crate wire Structure-5 65160 38048 0
6 Crate wire Structure-6 278734 157550 0
7 Crate wire Structure-7 148988 84310 0
8 Crate wire Structure-8 186058 105236 0
9 Crate wire Structure-9 315805 178476 0
10 Run Off Control Str.-10 95397 184335 0
Crate Wire Structure-1,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 72 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 539 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 30 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 245 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 245 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 72 cum 338.17
Retaining Wall-2
COST OF MATERIAL (Retaining Wall)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 220 Bags 299.99 per bag with gst
2 Sand 38.38 cum 978.68 per cum
3 Bajri 0.95 cum 662.64 per cum
4 Stone 8.32 Cum 567.9 per cum
5 Gatka 123.59 cum 721.07 per cum
COST OF LABOUR (Retaining Wall)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 42 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 8.4 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 78.75 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 33.6 cum 2999.31
5 D.P.C.1:2:4 top of Wall 1.05 Cum 1396.94
Run off Control Str.-3
COST OF MATERIAL (Run off Control Str)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 109 Bags 299.99 per bag with gst
2 Sand 18.83 cum 978.67 per cum
3 Bajri 4.34 cum 567.9 per cum
4 Stone 1.16 Cum 662.64 per cum
5 Gatka 56.91 cum 721.07 per cum
COST OF LABOUR (Run off Control Str.)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 30.48 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:18 (CSR No. 10.7b (i)) 4.34 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 33.3 cum 3486.03
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level (CSR No. 4/12.17) 17.86 cum 2999.31
5 Cement Concreate on Top of wall 1:2:4 1.29 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 35.39 sqm 159.08
Run off Control Str.-4
COST OF MATERIAL (Run off Control Str)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 109 Bags 299.99 per bag with gst
2 Sand 18.83 cum 978.67 per cum
3 Bajri 4.34 cum 567.9 per cum
4 Stone 1.16 Cum 662.64 per cum
5 Gatka 56.91 cum 721.07 per cum
COST OF LABOUR (Run off Control Str.)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 30.48 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:18 (CSR No. 10.7b (i)) 4.34 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 33.3 cum 3486.03
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level (CSR No. 4/12.17) 17.86 cum 2999.31
5 Cement Concreate on Top of wall 1:2:4 1.29 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 35.39 sqm 159.08
Crate Wire Structure-5,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 45 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 355.3 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 27 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 161.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 161.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 45 cum 338.17
Crate Wire Structure-6,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 202.5 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 1395.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 90 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 634.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 634.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 202.5 cum 338.17
Crate Wire Structure-7
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 108 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 749.1 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 48 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 340.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 340.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 108 cum 338.17
Crate Wire Structure-8
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 135 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 933.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 60 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 424.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 424.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 135 cum 338.17
Crate Wire Structure-9
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 229.5 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 1580.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 102 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 718.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 718.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 229.5 cum 338.17
Run off Control Str.-10
COST OF MATERIAL (Run off Control Str)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cement 109 Bags 299.99 per bag with gst
2 Sand 18.83 cum 978.67 per cum
3 Bajri 4.34 cum 567.9 per cum
4 Stone 1.16 Cum 662.64 per cum
5 Gatka 56.91 cum 721.07 per cum
COST OF LABOUR (Run off Control Str.)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 30.48 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:18 (CSR No. 10.7b (i)) 4.34 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 33.3 cum 3486.03
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level (CSR No. 4/12.17) 17.86 cum 2999.31
5 Cement Concreate on Top of wall 1:2:4 1.29 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 35.39 sqm 159.08
WORK-2:- Soil Erosion Land Protection Work (Rain Water Harvesting Tank (Pond), Village : Narainpur , Tehsil Dharakalan Distt. Pathankot.
Estimate Sanction No. /D.B. Dated 2026, Amount 3549622 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Harvesting Tank 847518 1409861 0
2 Crate Wire Structure 819593 472650 0
Rain Water Harvesting Tank-1
COST OF MATERIAL (RWHT)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 1104 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 174.04 cum 951.73 per cum
3 Cost of Stone Aggregate 37.76 cum 539.06 per cum
4 Cost of Bajri 5.37 Cum 634.25 per cum
5 Cost of Boulder 03 tp 18 Kg 428.5 cum 692.95 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 172.08 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 33 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 122.88 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 266.66 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 5.97 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 317.92 sqm 159.08
Crate Wire Structure-2
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 607.5 cum 857.01 per cum
2 Cost of G.I crate wire (including GST) 4187.7 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 270 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1903.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1903.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 607.5 cum 338.17
WORK-3 :-Stone Masonary Land Protection Sturcture/ Soil Erosion Land , Village Bhungal, Tehsil Dharkalan, Distt. Pathankot.
Est. no. /D.B, dated , Amount 749124/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate wire Structure 465413 283711 -
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 364.5 cum 784.35 per cum
2 Cost of G.I crate wire (including GST) 2514.6 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 162 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1143 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1143 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 364.5 cum 338.17
WORK-4 :-Stone Masonary Land Protection Sturcture/ Soil Erosion Land , Village Lanjera, Tehsil Dharkalan, Distt. Pathankot.
Est. no. /D.B, dated , Amount 609534/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate wire Structure 400644 208890 -
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 285 cum 962.7 per cum
2 Cost of G.I crate wire (including GST) 1768.8 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 105 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 804 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 804 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 285 cum 338.17
WORK-5 :-Stone Masonary Land Protection Sturcture/ Soil Erosion Land , Village Dhar Khurd, Tehsil Dharkalan, Distt. Pathankot.
Est. no. /D.B, dated , Amount 1243943/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate wire Structure 801470 442473 -
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 567 cum 918.67 per cum
2 Cost of G.I crate wire (including GST) 3930.3 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 252 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 1786.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 1786.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 567 cum 338.17
WORK-6 :-Stone Masonary Land Protection Sturcture/ Soil Erosion Land , Village Dunera, Tehsil Dharkalan, Distt. Pathankot.
Est. no. /D.B, dated , Amount 533212/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate wire Structure 349686 183526 -
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure-1)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 252 cum 949.5 per cum
2 Cost of G.I crate wire (including GST) 1546.6 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 90 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 703 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 703 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 252 cum 338.17
WORK-7:- Soil Erosion Land Protection Work (Rain Water Harvesting Tank (Pond), Village : Hara Sukhnyal , Tehsil Dharakalan Distt. Pathankot.
Estimate Sanction No. /D.B. Dated 2026, Amount 1598853 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Harvesting Tank 343400 655360 0
2 Crate Wire Structure 368697 231396 0
Rain Water Harvesting Tank-1
COST OF MATERIAL (RWHT)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 512.47 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 80.25 cum 842.74 per cum
3 Cost of Stone Aggregate 18.91 cum 430.07 per cum
4 Cost of Bajri 3.18 Cum 525.26 per cum
5 Cost of Boulder 03 tp 18 Kg 192.19 cum 583.96 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 570.92 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 (CSR No. 10.8b (i)) 16.68 cum 1396.94
3 Squard rubble Stone Masonary in 1:5 cs mortar below ground Level 57.6 cum 2999.31
4 Squared rubble stone masonary 1:5 cs mortar Above Ground level 117.12 cum 2999.31
5 Cement Concreate on Top of wall 1:2:3 3.53 Cum 1396.94
6 Plaster work on side walls of sructure in 1:4 sand mortar 12.5mm thick 149.8 sqm 159.08
Crate Wire Structure-2
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 297 cum 748.02 per cum
2 Cost of G.I crate wire (including GST) 2052.6 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 132 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 933 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 933 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 297 cum 338.17
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
DNIT011.pdf
Tender Documents • 1.19 MB
011FB.xls
Tender Documents • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].