Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹3,199.75 (1.12%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,700
Closing Date
21 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Construction of boundary wall Phase 2 at BMS Tarathpora Pyt
2026_RDPR_315887_7
NIT NO 53 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹8,700
4 Aug 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/mechanical means including disposal of same as per direction of Engineer in charge | 4.44 | Cum | 1,458.45 | ₹6,475.52 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1: 4: 8)mix (1cement :4Coarse sand :8 graded stone aggregates 40mm nominial size )crushed stone aggregates inclding.dewatering if any and head load | 1.78 | Cum | 5,202.9 | ₹9,261.16 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6mix (1 Cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) crushed stone aggregates including dewatering if any and head load | 7.99 | Cum | 5,733.6 | ₹45,811.46 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 13.9 | Cum | 7,571.55 | ₹1,05,244.55 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 13.9 | Cum | 1,455.65 | ₹20,233.54 |
| 6 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork | 1 | sqm | 0.01 | ₹0.01 |
| 7 | Foundations, footings, bases of columns etc. for mass concrete. | 44.4 | Sqm | 286.35 | ₹12,713.94 |
| 8 | P/L in position sp.grade of R.C.C including curing but excluding the cost of centering ,shuttering,finishing and reinforcement .All work upto plinth level in 1:1.5:3 mix including dewatering if any | 1.2 | cum | 7,788.4 | ₹9,346.08 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete (TMT Bars). | 1.2 | qtls | 12,320 | ₹14,784 |
| 10 | P/L of 50mm coping over brick work in 1:2:4 mix using 20mm crushed stone aggregate | 9.03 | sqm | 416.5 | ₹3,761 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1026826.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .