Loading…
Loading…
Tender Value
₹85.3 L
EMD Value
₹1.5 L
Closing Date
15 Jun 2026, 12:00 pm7d left
Executive Engineer JSV Flood Prot. Division Gagret
Executive Engineer JSV Flood Prot. Division Gagret
Construction of Civil Work, Providing and Laying of Rising Main, Distribution system and S/E of pumping machinery for T/well Dangoh Upper).
2026_HPIPH_135956_1
JSV-FPDG-EA-I/2026-2395-2434 dt 06.06.2026
Open Tender
Civil Works
180 days
Executive Engineer JSV Flood Prot. Division Gagret
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹1.5 L
6 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
6 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft / hard rock or chieselling soft/ hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including, shoring, strutting, planking, timbering and dewatering, wherever required, stacking the useable and unuseable material/ soil separately and after laying, jointing and testing of pipes returing the useable soil in trenches in 15 cm ( Fifteen centimeter ) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil / un-useable materials as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 2,462.95 | Cum | - | - |
Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge | 4.58 | Cum | - | - | |
Providing and laying cement concrete 1:6:12 (1cement: 6 sand 12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lift and to the entire satisfaction of Engineer-in-charge. | 11.94 | Cum | - | - | |
Brick work using common burnt clay building bricks in foundation & Plinth in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 16.51 | Cum | - | - | |
2nd. class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 (1 cement : 6 sand) in all lead and lifts and as per the directions of the Engineer-in-Charge. | 28.63 | Cum | - | - | |
Filling in plinth with sand under floors including watering ramming consolidating and dressing complete under flooring complete in all respect including carriage of materials in all leads and lifts | 5.5 | Cum | - | - | |
P/L RCC seismic beam in cement concrete work 1.2:4(1cement:2sand: 4 graded stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in Foundations, footings bases of columns and the like and mass concrete complete in all respect including carriage of materials in all leads and lifts | 1.01 | Cum | - | - | |
Providing and laying cement concrete 1:2:4 ( 1cement : 2 sand : 4 graded stone aggregate 20 mm nominal size ) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in Suspended Floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level complete in all respect including all leads and lifts. | 9.46 | Cum | - | - | |
2nd class brick work using common burnt clay building bricks in super structure in all heights and depth in cement mortar 1: 6 (1cement:6sand) in all leads and lifts as per the direction of Engineer-in- charge, | 19.24 | Cum | - | - | |
Half brick work using common burnt clay building bricks in super structure above Ist floor level in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 58.56 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Form6and8.pdf
Tender Documents • 1.06 MB
TermsandConditions.pdf
Tender Documents • 0.47 MB
BOQ_201266.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid