Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹15.7 Laccepted-finance | ₹15.7 L | accepted-finance |
Tender Value
₹16.7 L
EMD Value
₹42,000
Closing Date
17 Feb 2026, 9:30 pmClosed
Public Works Department
Construction of CC Road and Drain from Kanak Bhavan to Agasi Bagil at Allur (B) Village in Aland Taluka. Under KKRDB for the year 2025-26.
PWD/2025-26/RD/WORK_INDENT32878
PWD/2025-26/RD/WORK_INDENT32878
Open
Roads
PWD Division Office Kalaburagi
₹500
₹42,000
7 Feb 2026
7 Feb 2026
16 Feb 2026
3.7 Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba... 106.80 m³
3.6 Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting... 71.20 m³
4.1.A.v Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material... 71.20 m³
4.17 Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ... 53.40 m³
16.27 OTHER ITEMS - (CC Pavement, PMGSY Boards & Innovative Technology) - Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base,... 106.80 m³
8.7 Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity... 1.08 m²
CD 2 Vent 1000mm Dai at Ch. 0.15 Km
1.14.1 Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 43.20 m³
2.1.3 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ... 4.50 m³
2.4.2 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro... 24.36 m³
16.16.b PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class beddin... 15.00 m
2.11.h Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,... 1.58 t
1.8 Manual Means -
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta... 20.21 m³