Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹47.1 LAWARDED | AWARDED |
Tender Value
₹47.1 L
EMD Value
₹48,000
Closing Date
23 Oct 2025, 9:30 pmClosed
Public Works Department
Annual Maintenance 1 Teligi to Ragimasalavada K.M 0.00 to 4.03 2 Alagilavada to Haluvagalu Road KM 0.0 to 14.24 3 KKallahalli Cross to Tavaragundi KM 0.00 to 15.18 KM 15.41 to 17.786 KM 18.92 to 20.43 KM 20.63 to 21.63 KM 22.398 to 23.92 4 Teligi to Shankaranahalli KM 0.00 to 8.51 5 Chirasthahalli to Jittinakatte KM 0.00 to 10.74 6 Davanagere Holalu to Kadathi KM 2.00 to 7.89 KM 9.10 to 13.12 KM 13.21 to 18.77 7 Davanagere Holalu to Channahalli Thanda KM 0.00 to 6.83 KM in Harapanahalli Taluk(RESERVED FOR SC CATOGERY )
PWD/2025-26/RD/WORK_INDENT25765/CALL-2
PWD/2025-26/RD/WORK_INDENT25765/CALL-2
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Hosapete
₹1,180
₹48,000
15 Oct 2025
15 Oct 2025
21 Oct 2025
Annual Maintenance 1 Teligi to Ragimasalavada K.M 0.00 to 4.03 2 Alagilavada to Haluvagalu Road KM 0.0 to 14.24 3 KKallahalli Cross to Tavaragundi KM 0.00 to 15.18 KM 15.41 to 17.786 KM 18.92 to 20.43 KM 20.63 to 21.63 KM 22.398 to 23.92 4 Teligi to Shankaranahalli KM 0.00 to 8.51 5 Chirasthahalli to Jittinakatte KM 0.00 to 10.74 6 Davanagere Holalu to Kadathi KM 2.00 to 7.89 KM 9.10 to 13.12 KM 13.21 to 18.77 7 Davanagere Holalu to Channahalli Thanda KM 0.00 to 6.83 KM in Hphalli Taluk
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. Ref to MoRT&H : IRC - 301
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
White washing of parapet walls of CD work and tree trunks - White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technica...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .